Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NMI.V ·

Namibia Critical Metals Secures $5 Million Discretionary Financing and Accelerates Gold Exploration in Central Namibia

Financings

Press Release

Namibia Critical Metals Secures $5 Million Discretionary

Financing and Accelerates Gold Exploration in Central Namibia

• Namibia Critical Metals has entered into an agreement for a draw -down

equity financing facility with Alumina Partners (Ontario) Ltd. to provide the

Company with up to CD$5,000,000 over a 24-month period

• Draw-downs are at the Company’s discretion in increments of up to

CD$250,000

• The Company has completed a first draw -down of $100,000 which will be

directed towards acceleration of the Company’s gold exploration programs

and provides for the immediate analysis of 5,000 soil samples that have

already been collected

Halifax, Nova Scotia August 24, 2020 – Namibia Critical Metals Inc. (“Namibia Critical

Metals” or the “Company”) (TSXV:NMI) today announced that it has entered into a draw-

down equity financing facility (“Investment Agreement or Alumina facility”) with Alu mina

Partners (Ontario) Ltd. ("Alumina"), an affiliate of New York-based private equity firm Alumina

Partners, LLC. , that is structured to provide Namibia Critical Metals with timely access to

private placement financing as and when required. Under the terms of the Investment

Agreement, the Company has the right to draw down on the CD$5,000,000 facility, at its sole

discretion, through equity private placement tranches of up to CD$250,000 each. Each

tranche will be a placement of units (each a "Unit"), with each Unit comprising one common

share (a "Share") and one-half of one common share purchase warrant (each whole common

share purchase warrant referred to as a "Warrant"). The Units will be priced at a discount of

15% to 25% from the then most recent closing price of the Shares on the TSX Venture

Exchange at the time of the applicable Company draw-down notice to Alumina. The Warrants

will be issued at a 40% premium over the market price of the Shares and will have a term of

24 months. There are no standby charges or other upfront fees associated with the

Investment Agreement or any penalties for not drawing the full facility. Each tranche of Units

issued under the Investment Agreement will be subject to the acceptance of the TSX Venture

Exchange, and the securities issued will be subject to the customary 4-month hold period.

A first tranche draw -down of $100,000 was completed concurrent with the execution of the

Investment Agreement. The Company issued 555,555 units (“Units”) at a price of $0.18 per

unit for gross proceeds of $100,000. Each Warrant in this tranche is exercisable into one

additional common share at a price of $0.336.

The proceeds from the first draw -down will be used to accelerate gold exploration over the

1,638 square kilometer Grootfontein project area. A total of 5,000 samples over many of the

principal target areas have already been collected and will now be submitted for gold analyses.

2

Don Burton, President of Namibia Critical Metals stated “The Alumina facility will provide the

Company with the flexibility to accelerate high priority exploration programs outside of the

Lofdal Heavy Rare Earth joint venture which is already fully funded by our joint venture

partner, Japan Oil, Gas and Metals National Corporation (JOGMEC) . Exploration of our 2,000

square kilometer land package in the emerging Navachab-Otjikoto gold belt of central Namibia

can now be accelerated with the objective of identi fying gold targets using systematic soil

geochemical surveys, in a manner similar to what has been utilized by Osino Resources. This

approach led to the discovery of Twin Hills and other important gold anomalies. Management

is no stranger to large scale go ld exploration, having previously conducted similar programs

with Etruscan Resources throughout West Africa from 1996 -2010 which led to the

development of the Samira Hill, Tabakaroni, Youga and Agbaou gold mines.”

”Alumina is thrilled to support Namibia Critical Metals as they prepare to dramatically ramp

up exploration,” said Adi Nahmani, Managing Member of Alumina Partners. “The two areas of

resource focus that present the greatest value proposition right now are rare earth elements

and counter-inflationary precious metals... And investing in Namibia now will allow us to get

exposure to both. We look forward very much to seeing this veteran management team

execute against plan and hit key milestones even sooner than previously expected.”

The Company’s Gold Portfolio

The immediate priority for the Company outside of the Lofdal Heavy Rare Earth joint venture

with JOGMEC, is to accelerate exploration programs over its gold project portfolio in central

Namibia. The portfolio comprises three project areas covering a total of 2,002 km2 (Figure 1).

All project areas have the potential for the discovery of orogenic gold deposits similar to

known occurrences within the Navachab -Otjikoto gold belt which is being explored by Osino

Resources Corp (“Osino”), B2 Gold, Antler Gold and others . The Erongo project (295 km2) is

located 20 kilometers north of the Navachab Gold Mine operated by QKR and 10 kilometers

northwest of the Twin Hills discovery of Osino. The Otjiwarongo project (69 km 2) is located

70 kilometers southwest of B2 Gold’s Otjikoto Gold Mine and Grootfontein (1,638 km 2) is

situated 85 kilometers to the northeast of Otjikoto and is contiguous with ground held by B2

Gold.

The Company has already initiated regional geochemical soil surveys on all three areas and

collected over 10,000 samples. An initial batch of 2,500 samples collected over Erongo has

been re -submitted for check analyses. An evaluation of available airborne magnetic and

radiometric geophysical survey data from the Geological Survey of Namibia was undertaken

by Earthmaps Consulting to provide structural and lithological interpretations of the Erongo

and Grootfontein areas. The study has identified a number of gold targets and has confirmed

the position and extent of favourable structures that vary in strike length from 14 to 53 km

across the project areas. Similar structural context is linked to the Navachab, Otjikoto and

Osino gold occurrences. The study has also confirmed targets for base metals of the Berg

Aukas type and within the Grootfontein mafic complex for magmatic copper, nickel, cobalt

and PGM targets.

The Company will utilize this tranche of $100,000 to analyse the first 5,000 s amples over

favourable target areas at Grootfontein covering over 30 kilometers of strike length proximal

to first order structures. Samples will be submitted for ultra low detection limits on gold. The

initial objective is to identify large -scale gold anomalies that can indicate proximity to

mineralized systems based on a sampling density of 400 meters x 100 meters. Once these

areas are identified, more closely spaced soil sampling can confirm the extent of the anomaly

and priorities can be made for drill targets.

3

Figure 1 – Location of Namibia Critical Metals’ projects highlighting position of gold projects

(Erongo, Otjiwarongo and Grootfontein) in relation to important gold projects within the

Navachab-Otjikoto gold belt

Donald M. Burton, P.Geo. and President of Namibia Critical Metals Inc., is the Company’s

Qualified Person and has reviewed and approved this press release.

4

About Namibia Critical Metals Inc.

Namibia Critical Metals Inc. holds a diversified portfolio of exploration and advanced stage

projects in the country of Namibia focused on the development of sustainable and ethical

sources of metals for the battery, electric vehicle and associated industries. The Company

also has significant land positions in areas favourable for gold mineralization.

The Lofdal Heavy Rare Earth Project is the Company’s most advanced project having

completed a Preliminary Economic Assessment in 2014 and full Environmental Impact

Assessment in 2017. An application has been made for a mining licence at Lofdal. The project

is now in joint venture with Japan Oil, Gas and Metals National Corporation (“JOGMEC”) who

are funding the current $3,000,000 drilling and metallurgical program with the object ive of

doubling the resource size and optimization of the process flow sheet.

At the Erongo Gold Project, stratigraphic equivalents to the sediments hosting the recent

Osino gold discovery at Twin Hills have been identified but not yet sampled. Detailed soil

surveys are planned over this highly prospective area.

The Grootfontein Project has potential for m agmatic Cu -Ni mineralization, Mississippi

Valley-type Zn -Pb-V mineralization and Otjikoto -style gold mineralization. Detailed soil

surveys are planned over this highly prospective area.

The Epembe Tantalum-Niobium Project is also at an advanced stage with a well-defined,

10 km long carbonatite dyke that has been delineated by detailed mapping with over 11,000

meters of drilling. Preliminary mineralogical and metallurgical studies including sorting tests

(XRT), indicate the potential for significant physic al upgrading. Further work will be

undertaken to advance the project to a preliminary economic assessment stage.

The Kunene Cobalt-Copper Project comprises a very large area of favorable stratigraphy

(“the DOF”) along strike to the west of the Opuwo Co -Cu-Zn deposit. Secondary copper

mineralization over a wide area points to preliminary evidence of a regional -scale

hydrothermal system. Exploration targets on EPLs held in the Kunene project comprise direct

extensions of the DOF style mineralization to the west, sediment-hosted cobalt and copper

and stratabound Mn and Zn-Pb mineralization.

The common shares of Namibia Critical Metals Inc. trade on the TSX Venture Exchange under

the symbol “NMI”.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term

is defined in the policies of the TSX Venture Exchange) accepts responsibility for the

adequacy or accuracy of this release.

5

For more information please contact -

Namibia Critical Metals Inc.

Don Burton, President

Tel: +01 (902) 835-8760

Fax: +01 (902) 835-8761

Email: [email protected]

Web site: www.NamibiaCriticalMetals.com

The foregoing information may contain forward -looking information relating to the future performance of Namibia Rare Earths Inc. Forward -

looking information, specifically, that concerning future performance, is subject to certain risks and uncertainties, and actual results may differ

materially. These risks and uncertainties are detailed from time to time in the Company's filings with the appropriate securities commissions.