Sunday, September 20, 2026
MiningNewsTerminal
Sunday, September 20, 2026 Admin

NLR.CN ·

Northern Lights Receives Permit to Drill Tin Cup Prospect at Secret Pass

Exploration Programs Permits & Approvals

Northern Lights Receives Permit to Drill

Tin Cup Prospect at Secret Pass

Vancouver, British Columbia . June 8, 2021, Northern Lights Resources Corp.

(“Northern Lights” or the “Company”) (CSE: NLR, OTC: NLRCF) is pleased to announce

that it has received approval from the Arizona State Land Department ( the “ASLD”) to

commence drilling at the Tin Cup Prospect at the Company’s Secret Pass Gold Project

(“Secret Pass”) in Mohave County, Arizona.

Northern Lights began drilling at Secret Pass on April 15 and is now completing the 4rth

drill hole (total approximately 600 metres) out of the total 22 permitted drill holes located

on mineral claims registered with the US Bureau of Land Management (the “BLM”). The

prospects drilled included Fiery Squid, Nine Second Shaft and Fluorspar Ridge locations.

(See Figure 1) All drill core has been split and sent to Skyline Laboratories in Tucson,

assays are pending.

CEO, Jason Bahnsen, commented “Historic RC drilling at Tin Cup in the 1980s

intersected steep ly angled veins with grades up to 40 grams per tonne gold. We are

excited to begin drilling at Tin Cup where we plan to confirm the previous high-grade RC

results with large diameter HQ diamond core drilling and test the system to a depth of

approximately 350 metres, well below the maximum historic drilling depth of 180 metres.

We are completing drilling at the Fluorspar Ridge Prospect and will immediately move the

drill to the Tin Cup Prospect to begin the planned 7-hole program.”

Seven exploration drill holes have been approved at the Tin Cup Prospect (total 1,350

metres planned) The initial drill program at Tin Cup is planned to confirm high -grade

mineralization from historic drilling and to test the down plunge extension of the

mineralization to a depth of approximately 350 metres below the surface.

Table 1 – Planned Drill Holes at Tin Cup Prospect

Hole No. Location Azimuth (o) Dip (o) Length (m)

TC01 Tin Cup 310 -50 250

TC02 Tin Cup 220 -45 175

TC03 Tin Cup 220 -55 225

TC04 Tin Cup 220 -65 400

TC05 Tin Cup 040 -60 100

TC06 - F2 Tin Cup 180 -45 100

TC07 - F2 Tin Cup 100

Total 1,350

{01113842;1}

2

Tin Cup Zone

Records show that there was an historic small scale open pit and underground mine

located at Tin Cup. The mine reportedly produced several hundred tons of mineralized

material grading 15 g/t to 31 g/t of gold. Historic workings, from approximately 1918 to the

early 1930’s, included an open pit and an inclined shaft to a depth of 21 metres (70 ft)

with minor underground level workings.

During the period from 1984 to 1991, a total of 145 drill holes (predominately reverse

circulation drilling) were drilled at Tin Cup with a number of holes intersecting high grade

gold mineralization. The historic drilling had an average depth of approximately 95 metres

and a maximum depth of 180 metres.

The Tin Cup Gold Zone is localized along the steeply northeast -dipping Frisco Mine

Fault. The gold mineralization is hosted by Tertiary andesite and associated with the

margins of rhyolite dykes that occur as lenses within the Frisco Mine Fault. A few of the

deepest historic drill holes intersect gold mineralization in the P roterozoic basement

granite.

The mineralized zone at Tin Cup has a strike length of approximately 245 metres to drill-

indicated depth of 180 metres and is open along strike and depth. High er grade

mineralization (greater than 10 g/t Au ), is localized in narrow sub -vertical structures

developed within broader zones of lower grade mineralization ranging up to 86 metres in

width. The mineralization plunges to the northwest at 50 degrees. Surface oxidation is

variable extending to a maximum depth of up to 120 metres based on historical drilling.

Selected historic intersections are summarized in Table 2.

Table 2 - Selected Historic Drill Results at Tin Cup Zone

Hole No. Year Type Depth (m) Interval (m) Width (m) Au g/t

TC-01 1984 RC 52 22.9-30.5 7.6 7.6

21.2-51.5 30.3 2.9

TC-10 1985 RC 176 89.9-121.9 32 13.6

including 1.5 40.4

including 12.2 20.8

TC-15 1985 RC 146 111.2-115.8 4.6 13.1

TC-30 1986 RC 150 63.3-150 86.7 4.1

including 9.1 17.7

TC-32 1986 RC 90 18.8-69.7 50.9 2.7

TC-11 1987 RC 90.9 46.9-90.9 44 2.8

TC-14 1986 RC 121 90.9-121.9 31 5.8

Note: These results are historical in nature and a Qualified Person has not done sufficient work to verify

these previous drilling results. Previously released on October 28, 2020.

{01113842;1}

3

Figure 1 –Secret Pass Project Drill Hole Locations

Figure 2 – Tin Cup Prospect Cross-Section Model

{01113842;1}

4

The scientific and technical data contained in this news release was reviewed and

{01113842;1}

5

approved by Gary Artmont (Fellow Member AUSIMM #312718), Head of Geology and

qualified person to Northern Lights Resources, who is responsible for ensuring that the

geologic information provided in this news release is accurate and who acts as a “qualified

person” under National Instrument 43-101 Standards of Disclosure for Mineral Projects.

For further information, please contact:

Albert Timcke, Executive Chairman and President

Email: [email protected]

Tel: +1 604 608 6163

Jason Bahnsen, Chief Executive Officer

Email: [email protected]

Tel: +1 604 608 6163

Shawn Balaghi, Investor Relations

Email: [email protected]

Tel: +1 604 773 0242

About Northern Lights Resources Corp.

Northern Lights Resources Corp is a growth -oriented exploration and development

company that is advancing two projects: The 100% owned, Secret Pass Gold Project

located in Arizona; and the Medicine Springs silver -zinc-lead Project located in Elko

County Nevada where Northern Lights, in joint venture with Reyna Silver are earning

100% ownership. Northern Lights Resources is a member of the Arizona Mining

Association.

Northern Lights Resources trades under the ticker of “NLR” on the CSE. This and other

Northern Lights Resources news releases can be viewed at www.sedar.com and

www.northernlightsresources.com.

CAUTIONARY STATEMENT REGARDING FORWARD -LOOKING INFORMATION : This news release

includes certain “forward -looking statements” un der applicable Canadian securities legislation. Forward -

looking statements include, but are not limited to, statements with respect to: the terms and conditions of

the proposed private placement; use of funds; the business and operations of the Company af ter the

proposed closing of the Offering. Forward -looking statements are necessarily based upon a number of

estimates and assumptions that, while considered reasonable, are subject to known and unknown risks,

uncertainties, and other factors which may cau se the actual results and future events to differ materially

from those expressed or implied by such forward -looking statements. Such factors include, but are not

limited to: general business, economic, competitive, political and social uncertainties; dela y or failure to

receive board, shareholder or regulatory approvals; and the uncertainties surrounding the mineral

exploration industry. There can be no assurance that such statements will prove to be accurate, as actual

results and future events could dif fer materially from those anticipated in such statements. Accordingly,

readers should not place undue reliance on forward looking statements. The Company disclaims any

intention or obligation to update or revise any forward -looking statements, whether as a result of new

information, future events or otherwise, except as required by law.