Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NIM.V ·

Nicola Mining Resamples Historic Craigmont Drill Hole S-100 Intersecting 0.54% Copper over 116.7 Metres

Exploration Programs

TSX.V: NIM

NICOLA MINING RESAMPLES HISTORIC CRAIGMONT DRILL HOLE S-100

INTERSECTING 0.54% COPPER OVER 116.7 METRES

VANCOUVER, B.C. January 23, 2017 – Nicola Mining Inc. (the “ Company”) is pleased to announce

results of historic and resampled diamond drill core from hole S-100. Hole S-100 was originally drilled in

January 1978 on the Embayment target located on the Thule property 10 km west of Merritt, B.C.

Early in January 2017, Nicola Mining Inc. geologists re-sampled S-100, an historic surface drill hole from

the Craigmont Mine. This hole was dri lled into the Embayment target; a target that was drill tested by

Nicola Mining in their 2016 drill program with hole T HU-002. The Company’s news release dated

September 7, 2016 includes one Emb ayment Zone hole, THU-002 that intersected 1.11% Cu over

85.92m. Hole S-100 was collared approximately 65 metres southeast of THU -002 and drilled a total of

590.70 metres (1938.0 feet). Nicola Mining sampled an additional 64.49 metres (228 feet) of altere d and

weakly mineralized core from where original sampling stopped at 421.2 3 metres (1382 feet). The results

of the historic sampling of S -100 include sections of 0.92% Cu over 61.9 metres within a section of

116.7 metres grading 0.54%

Re-sampling S-100 entailed locating and recovering the core in from the original Craigmont core racks,

re-establishing drill core depths using box footage labels and original footage blocks that remained in the

core boxes. The last available core was from a hole depth of 490.73 metres (1610 feet) as indicated on the

core box marking. This depth was used to verify depths from block markings on preceding core and

confidently establish downhole depths of samples collected at 2 metre intervals. Hole S-100 was drilled

on an azimuth 053 degrees and a dip of - 52 degrees. Core Sizes were HQ from 184.10 metres (604 feet)

to 277.37 metres (910 feet) and NQ from 277.37 metres (910 feet) to the end of hole at 590.70 metres

(1938 feet).

The end of S -100 is approximately 143.00 metres northwest and 140.0m below the end of hole for

THU-002, this indicates an area of untested potential mineralization.

Nicola Mining sampled the interval from 414.30 to 490.70 metres (1359.25-1610.00 feet), overlapping

the original samples by 6.94 metres (22.77 feet).

Historic (1978 Sampling)

Hole Fr.om (m) To (m) Interval (m) Cu (%)

S-100 271.9 388.6 116.7 0.54

Including 292.0 388.6 96.6 0.63

Including 325.5 387.4 61.9 0.92

Including 328.6 374.0 45.4 1.01

January 2017 Re –Sampling

S-100 462.00 472.00 10.0 0.51

Peter Espig, CEO of Nicola Mining Inc ., commented, “We are very encouraged by these results as the

140-metre distance between the two drill holes highlight s the potential of an exciting mineralized zone .

The Company will conduct work during 2017 to delineate and define the zone, which is open in multiple

directions.”

Qualified Person

The scientific and technical content of this press release was reviewed by Mr. Chris LeClair

G.I.T. and verified by Mr. Kevin Wells, P.Geo., who is classified as a "Qualified Person" as

defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

Nicola Mining Inc. is a junior mining company listed on the TSX Venture Exchange, and has a fully-

permitted 200 tonn e per day custom mill that recommenced operations in June 2016. Its 100% owned

state-of-the-art mill and tailing facility, located near Merritt, British Columbia, is capable of processing

both gold and silver mill feed via gravity and floatation processes. The Company has 100% of the Thule

Copper property covering 10,084 hectares along the southern end of the Guichon Batholith. In addition,

the Company also owns 100% of Treasure Mountain, its high -grade silver property, and a gravel pit,

which is located adjacent to its milling operations.

On behalf of the Board of Directors

“Peter Espig”

Peter Espig

CEO & Director

For additional information contact:

Peter Espig

Telephone: (778) 385-1213

Email: [email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of

the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.