Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NIM.V ·

Nicola Mining 2023 Drilling Program at New Craigmont Copper Project Reveals Significant Porphyry-style Alterations

Exploration Programs

Nicola Mining 2023 Drilling Program at New

Craigmont Copper Project Reveals Significant

Porphyry-style Alterations

Vancouver, British Columbia--(Newsfile Corp. - December 21, 2023) -

Nicola Mining Inc. (TSXV: NIM)

(FSE: HLI)

(

OTCQB: HUSIF)

(the "

Company

") announces the completion of its 2023 drilling

exploration program (the "

2023 Program

") at the New Craigmont Copper Project ("

New Craigmont

"),

a wholly owned venture located near Merritt, BC, and 33 km south of Teck Resources Ltd.'s Highland

Valley Copper, Canada's largest open pit copper mine.

The Company initiated the 2023 Program on June 6, 2023, drilling six diamond holes totaling 2,684

metres on Mineral Lease 237643, adjacent to the historic Craigmont Copper Mine (Figure 1 and 2). The

2023 Program aimed to explore the potential of a southeastern extension of the historic Craigmont skarn

ore body and to investigate the potential of a porphyry copper system.

Figure 1

. Mineral tenure map of the New Craigmont Project.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4873/191908_f196d2e9c43e08bd_001full.jpg

Figure 2

. Map of 2023 drilling program (projected in NAD 83, UTM 10N).

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4873/191908_f196d2e9c43e08bd_002full.jpg

KEY FINDINGS

Drill holes NC23-001, NC23-002, NC23-003, NC23-004a were drilled southeast of the historic

Craigmont Copper Mine to test the potential of continued skarn mineralization.

NC23-001

intercepted two intervals of (weakly mineralized) exoskarn hosted in Nicola Group limey

sedimentary rocks, namely from 67.25 m to 99.8 m and 172.43 m to 185.50 m.

The skarn intervals

are composed of banded actinolite, magnetite, epidote, brown garnet and veinlets of chalcopyrite

(Figure 3). The holes NC23-002, NC23-003 and NC23-004a have discovered extensive alteration

(epidote, chlorite and biotite) in Nicola Group sedimentary and volcaniclastic rocks, while no exact

skarn interval was found in the drill core. This alteration is characteristic of porphyries and supports

the possibility of a proximal porphyry system.

Drill holes NC23-005 and NC23-006 were drilled northeast and north of

the historic pit and

targeted the Guichon Quartz Diorite. Extensive potassic alteration (K-feldspar, Figure 4), propylitic

alteration (epidote and chlorite, figures 4 and 5) and veinlets of chalcopyrite +/- molybdenite

(Figure 6) were observed in the core, suggesting the presence of a porphyry copper system at

New Craigmont.

The presence of these features along with discreet zones of significant copper

grade (>0.1% Cu; Table 1), all in proximity to the historic high-grade skarn, support the hypothesis

that there is a porphyry centre (or several) on the property and that a copper porphyry system is the

mineralization source for the historic Craigmont skarn.

Table 1: Intercepts ≥0.1% Cu*

Hole ID

From (m)

To (m)

Length (m)

Cu (%)

Lithology

NC23-001

48.77

50.29

1.52

0.12

hydrothermal silica healed fault breccia

NC23-001

51.81

53.33

1.52

0.13

intercalated polylithic vocaniclastic

NC23-001

53.33

54.86

1.53

0.22

intercalated polylithic vocaniclastic

NC23-001

64.01

67.06

3.05

0.33

intercalated polylithic vocaniclastic

NC23-001

126.50

128.02

1.52

0.17

contact between biotite-hornfels volcaniclastic and biotite-hornfels rhyolitic

lapilli tuffaceous sequence

NC23-001

224.00

226.00

2.00

0.12

diorite

NC23-001

247.80

249.80

2.00

0.10

diorite

NC23-002

91.44

94.49

3.05

0.13

diorite

NC23-002

131.00

132.00

1.00

0.10

diorite

NC23-002

180.80

182.30

1.50

0.22

diorite

NC23-002

246.30

247.36

1.06

0.48

diorite

NC23-003

61.00

62.50

1.50

1.14

fault breccia

NC23-003

74.60

77.70

3.10

0.44

rhyolitic tuffaceous volcaniclastic sequence

NC23-003

200.60

202.05

1.45

0.32

diorite

NC23-003

234.00

235.25

1.25

0.27

magnetite skarn

NC23-004a

220.90

222.50

1.60

0.10

felsic dyke

NC23-004a

247.47

251.28

3.81

0.33

rhyolitic tuffaceous volcaniclastic sequence (possible dacite volcaniclastic)

NC23-004a

266.00

267.42

1.42

0.13

diorite

NC23-004a

269.21

270.45

1.24

0.32

diorite

NC23-004a

309.28

310.00

0.72

0.11

diorite

NC23-005

115.50

116.70

1.20

0.62

rhyolitic crystal tuffaceous sequence

NC23-005

137.00

138.00

1.00

0.12

polylithic volcaniclastic tuffaceous sequence

NC23-005

197.50

198.50

1.00

0.11

quartz diorite

NC23-005

209.50

210.60

1.10

0.12

quartz diorite

NC23-005

322.64

324.00

1.36

0.16

diorite plug

NC23-005

408.36

409.36

1.00

0.71

epidote-diopside-magnetite-garnet exoskarn

NC23-005

411.36

412.36

1.00

0.24

massive garnet skarn

NC23-005

419.40

420.62

1.22

0.18

feldspar-fragmental sediments

NC23-005

520.00

521.50

1.50

0.16

feldspathic sandstone/gritty sequence

NC23-005

598.67

600.00

1.33

0.16

quartz diorite

NC23-005

637.00

639.00

2.00

0.12

massive to banded actinolite-epidote-garnet skarn

NC23-005

648.00

649.70

1.70

0.11

massive to banded actinolite-epidote-garnet skarn

NC23-005

809.22

809.75

0.53

0.71

quartz diorite

NC23-006

324.69

326.52

1.83

0.45

quartz diorite

NC23-006

455.00

456.00

1.00

0.24

quartz diorite

*These results are considered preliminary as they are still undergoing quality control

Figure 3.

Banded actinolite-magnetite-epidote-garnet skarn with disseminated chalcopyrite at 83.5m in

NC23-001.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4873/191908_f196d2e9c43e08bd_003full.jpg

Figure 4

. Potassic alteration and epidote alteration in in Guichon Quartz Diorite at 293 m in NC23-006.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4873/191908_f196d2e9c43e08bd_004full.jpg

Figure 5

. Epidote-chlorite propylitic alteration in Guichon Quartz Diorite at 198.0 m in NC23-005.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4873/191908_f196d2e9c43e08bd_005full.jpg

Figure 6.

Quartz vein hosting chalcopyrite with molybdenite at 326.5 m in NC23-006.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4873/191908_f196d2e9c43e08bd_006full.jpg

2024 EXPLORATION PLAN

The Company continues to work diligently to compile

a database of all, both historic and current,

core logs and lab results. Once

complete, Nicola will begin building a 3D geological interpretation

using core logs, mapping data and geophysics.

This will greatly aid in target generation and allow

the Company to refine working hypotheses, as well as integrate subsequent data.

Induced polarization ("

IP

") surveys are being planned for spring of 2024 over two key areas of

interest, which will help fill existing IP data gaps.

Data will be utilized

in conjunction with magnetic

and resistivity data to augment interpretations of structure, lithology, alteration, and mineralization.

Previous IP results correlate well with high-grade copper intercepts at Embayment (Figure 10).

Nicola anticipates using the results of the IP surveys, along with existing data to plan drill holes over

one or both areas to be drilled later in the summer of 2024.

Nicola's exploration team continues to collaborate closely with the University of British Columbia's

("

UBC

") Mineral Deposit Research Unit ("

MDRU

") on the MDRU's ongoing study of

porphyry-style

alteration and mineralization at the New Craigmont property

.

Figure 7

. Areas of interest for 2024 exploration

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4873/191908_f196d2e9c43e08bd_007full.jpg

Figure 8.

Aeromagnetic MVI plan view of surface showing cross-section lines for figures 9 & 10.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4873/191908_figure8.jpg

Figure 9.

Aeromagnetic MVI cross-sections (200m thick) illustrating proven mineralization at (A-A')

Craigmont and (B-B') Embayment corresponding with high magnetic anomalies and observed

mineralization on surface at (C-C') CAS and (D-D') MARB corresponding with (not yet drill-tested) high

magnetic anomalies.

NOTE: The outcroppings seen in the cross-sections coincide with the outcroppings seen at

surface.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4873/191908_f196d2e9c43e08bd_009full.jpg

Figure 10.

IP chargeability cross-section (200m thick) through the Embayment Zone showing higher

chargeability anomaly corresponding with high-grade Cu intercepts.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4873/191908_figure8_550.jpg

Mr. Peter Espig, CEO of Nicola Mining Inc., commented on the findings: "Overall the 2023 Program

yielded encouraging results. While we would have liked to have seen more mineralization directly

southeast of the historic pit, the drilling northeast uncovered extensive alteration and indicates the

potential of other mineralization bodies. Particularly, we are extremely excited to see that the

outcroppings, which we mapped extensively this time, coincide perfectly with the cross-section diagrams

displaying electromatic anomalies. These findings reinforce our commitment to exploring and

developing the New Craigmont Project."

The Company looks forward to further analysis and potential exploration based on these promising

results.

QUALITY ASSURANCE AND QUALITY CONTROL (QA/QC)

Nicola maintains tight sample security, and quality assurance and quality control (QA/QC) for all aspects

of its exploration program. All core samples from 2023 were logged, photographed and sampled on site

by staff or consulting geologists and geotechnicians. The samples were picked up and transported from

site by Activation Laboratories Ltd. (Actlabs) to their ISO 17015 accredited lab in Kamloops, BC for

preparation (crushing and pulverizing) and analyzed for 38-element ICP-OES by aqua regia (partial)

digestion with specified limits (method code 1E3). Company protocols include the insertion of quality

control (QC) samples consisting of Certified Reference Materials (CRMs), blanks and duplicates into the

sample stream at a rate of 1 in 20. Nicola geologists are currently reviewing the results of the QC

program, pending lab re-runs of select sample batches.

Qualified Person

Kevin Wells, P.Geo, a consulting geologist to the Company, is the independent qualified person as

defined by National Instrument 43-101 -

Standards of Disclosure for Mineral Projects

for the technical

disclosure contained in this news release.

About Nicola Mining

Nicola Mining Inc. is a junior mining company listed on the TSX Venture and Frankfurt Exchanges that

maintains a 100% owned mill and tailings facility, located near Merritt, British Columbia. It has signed

Mining and Milling Profit Share Agreements with high grade gold projects. Nicola's fully-permitted mill

can process both gold and silver mill feed via gravity and flotation processes.

The Company owns 100% of the New Craigmont Project, a high-grade copper property, which covers an

area of 10,913 hectares along the southern end of the Guichon Batholith and is adjacent to Teck

Resources Ltd.'s Highland Valley Copper, Canada's largest copper mine. The Company also owns

100% of the Treasure Mountain Property, which is comprised of 51 mineral tenures, 21 legacy claims:

100 cell units, and five crown grants for a total of approximately 2,850 hectares.

On behalf of the Board of Directors

"

Peter Espig

"

Peter Espig

CEO & Director

For additional information

Contact:

Peter Espig

Phone: (778) 385-1213

Email:

[email protected]

URL:

www.nicolamining.com