Surge Battery Metals Provides Shareholder Update
Surge Battery Metals Inc.
3028 Quadra Court
Coquitlam, BC, Canada V3B 5X6
778-945-2656
www.surgebatterymetals.com
NEWS RELEASE
Surge Battery Metals Provides Shareholder Update
February 9, 2023, Coquitlam, BC - Surge Battery Metals Inc. (the “Company” or “Surge”) (TSXV: NILI),
(OTC: NILIF), (FRA:DJ5C).
President’s Update to Shareholders
Surge Battery Metals Inc Makes a Significant Lithium Clay Discovery.
Planning Underway for Additional Exploration Drilling to Further Delineate the High-Grade
Deposit
Metallurgical and Baseline Environmental Studies Planned for Q2
Dear Shareholders
It is my pleasure to write this letter given our successes in 2022 and to outline the important steps we
plan to take in the first part of 2023 to grow our flagship property , the Nevada North Lithium Project
(NNLP).
As you likely know, significant discoveries at the grass roots exploration stage are notoriously difficult to
come by and indeed a rare occurrence. Today our Company is fortunate to find ourselves the 100% owners
of a remarkable new lithium discovery; one that exhibits very high lithium values over an impressive area
and with multiple lithium clay intervals up to 50 meters thick. Still, a lot of work will be needed to solidify
the importance and value of our discovery and we are looking forward to completing the necessary steps
in the weeks, months, and years ahead.
The Nevada North Lithium Project- Our Flagship Project
Early in 2022 (See NR dated April 6, 2022) Surge released additional follow -up results from an in itial
ground geochem survey where lithium values up to 1,980 ppm lithium in stream sediments were reported.
Results from this exploration work ranged from 29.1 to 5,120 ppm lithium. Results included eighty-nine
samples with 1,000 or more ppm lithium. The zone of highly anomalous samples, greater than 500 ppm
lithium, extends about 2,800 meters north to south with of width up to 750 meters.
News release dated September 20, 2022, announced the start of a maiden 15 hole drill program where 8
holes were ultimately completed due to time constraint. Then on December 1 st we announced the first
partial assay results which returned multiple zones of strong lithium values ranging from 1,000 ppm to
5,000 ppm lithium confirming the potential for a high tenor lithium clay deposit.
Finally, after a long period of delay caused by unforeseen delays at the lab, we released the two final holes
of the program where Hole NN2207 intersected the thickest intervals of lithium rich claystone
encountered to date in the program, a to tal of 120.4 meters (395 feet) averaging 3943 ppm lithium in
four zones. NN2208 had the strongest individual sample interval ( 5950 ppm lithium between 45 to 50
feet, 13.72 to 15.24 meters) of the 2022 program.
2
Importantly, our maiden drill program retur ned impressive lithium values over a strike length of
approximately 1,600 meters (5,315 feet). The drill results confirmed that highly anomalous lithium values
persist to depth in the silty clay unit that that appears to underlie the better soil values obs erved in
samples collected in 2021 and earlier in the summer of 2022. Surge Battery Metals can confidently say
the Company has identified significant potential for a lithium deposit in an area of northern Nevada not
previously recognized for its lithium potential.
Planning for Further Drilling
Subject to final approval of the B ureau of Land Management, the Company plans to conduct both step -
out and infill drilling as Phase 2 of the maiden drill program initiated last fall. The first phase was designed
to evaluate whether significant surface soil values continued to depth and to evaluate the results before
continuing further into the program. It is anticipated that a further 7 holes may be completed in Phase 2.
A budget of approximately $500,000 has been approved. The program will get underway as soon
regulatory approvals are given and as weather permits.
Metallurgical and Baseline Environmental Studies
The Company is underway with baseline metallurgical evaluation s on the composition of various clay
samples recovered in the first phase of drilling. X-ray diffraction studies, together with the clays chemical
properties will provide information on how lithium occurs with the clay minerals recovered in the drilling.
Furthermore, mineralogical studies can determine the distribution of lithium throughout the clay that may
assist in identifying the physical beneficiation techniques required, if any, to upgrade the lithium content.
In addition, the Company has issued requests for proposals from qualified env ironmental service
providers to provide initial baseline studies and advice.
2023 will be an active year for the Company as we focus our exploration efforts on the Nevada North
Lithium Project. Our aim is to advance this important new discovery as quickly as possible and build the
Project into a long-term robust asset benefiting all shareholders.
Resignation of Board Member
The Company has received the resignation of William MacDonald as a director effective February 7,
2023. The Company thanks Bill for his contributions to the Company and wishes him well in his future
endeavors.
Qualified Person as Defined Under National Instrument 43-101: Alan J. Morris of Spring Creek, Nevada,
a Qualified Person as defined under National Instrument 43-101, has reviewed, and approved the
technical aspects of this news release.
About Surge Battery Metals Inc. surgebatterymetals.com
The Company is a Canadian -based mineral exploration company active in the exploration for lithium in
Nevada and for nickel -iron alloy in British Columbia and whose primary listing is on the TSX Venture
Exchange. The Company's maintains a focus on exploration for high value battery metals required for the
electric vehicle (EV) market.
3
Nevada Lithium Projects
The Company owns a 100% interest in 243 mineral claims located in Elko County , Nevada. The Nevada
North Lithium Project is in the Granite Range southeast of Jackpot, Nevada, about 73 km north-northeast
of Wells, Nevada. The target is a lithium clay deposit in volcanic tuff and tuffaceous sediments of the
Jarbidge Rhyolite package. In addition, the Company has a Property Option Agreement to earn an
undivided 80% interest in 16 mineral claims, comprising 640 acres located within Nevada's San Emidio
Desert, known as the Galt Property. Finally, the Company owns a 100% interest in 663 h a (1,640 acre)
property in the Teels Marsh Project located in Mineral County, Nevada. The property is in an active region
for both lithium exploration and production.
Nickel Projects, Central BC, Canada
The Company has a Property Option Agreement to earn an undivided 80% interest in certain mineral
claims from Nickel Rock Resources Inc. The Project (The Surge Nickel Project) consists of two non -
contiguous mineral claims groups consisting of six mineral cl aim blocks located in northern British
Columbia. One claim in the Mount Sidney Williams area (claim HN4), covers 1863 hectares immediately
south of and adjacent to the Decar Project, currently being advanced by FPX Resources, and 5 claims in
the Mitchell Range area, northeast of Decar, (N100 Group) covering 8659 hectares. Both projects target
the nickel -iron alloy mineral “Awaruite”, hosted by serpentinized intrusive rocks of the Trembleur
Ultramafic Unit.
On Behalf of the Board of Directors
“Greg Reimer”
Greg Reimer, President & CEO
Contact Information
Email: [email protected]
Phone: 778-945-2656
Neither the TSX Venture Exchange nor its Regulation Services Provider (as defined in the policies of the TSX Venture
Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward‐
looking statements which include, but are not limited to, comments that involve future events and conditions, which
are subject to various risks and uncertainties. Except for statements of historical facts, comments that address
resource potential, upcoming work programs, geological interpretations, receipt and security of mineral property
titles, availability of funds, and others are forward‐looking. Forward‐looking statements are not guaranteeing future
performance and actual results may vary materially from those statements. General business conditions are factors
that could cause actual results to vary materially from forward‐looking statements.