Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NICU.V ·

Magna Mining Intersects 6% Nickel in Additional Footwall Zone at the Crean Hill Project

Drill Results

Magna Mining Intersects 6% Nickel in

Additional Footwall Zone at the Crean Hill

Project

Sudbury, Ontario--(Newsfile Corp. - July 10, 2023) - Magna Mining Inc. (TSXV: NICU) (FSE: 8YD)

("Magna" or the "Company") is pleased to release additional assay results from the ongoing 2023

diamond drilling program. Drilling continues to intersect high grade nickel mineralization in the 101

Footwall ("FW")

Zone and in a footwall zone between the 101 and 109 FW Zones, referred to as the 105

FW Zone, which intersected 6.0% Ni, 2.2 % Cu, 5.8 g/t Pt + Pd + Au over 2.2 metres.

Highlights from the new assay results include:

105 FW Zone

MCR-23-024: 6.0% Ni, 2.2 % Cu, 5.8 g/t Pt + Pd + Au over 2.2 metres

101 FW Zone

MCR-23-020: 4.3% Ni, 0.4 % Cu, 1.7 g/t Pt + Pd + Au

over 0.4 metres

And 11.2% Ni, 0.4 % Cu, 0.1 g/t Pt + Pd + Au

over 0.4 metres

MCR-23-024: 5.1% Ni, 1.3 % Cu, 0.03 g/t Pt + Pd + Au

over 0.8 metres

Dave King, SVP Technical Services, stated, "Diamond drilling is ongoing at Crean Hill, where two drill

rigs remain active. The assays released today include results from our initial drilling within the 105 FW

Zone, which is a high tenor nickel zone similar to the 101 FW Zone, and hosted within a footwall breccia

structure trending southwest from the Main Contact Zone. Both the 101 FW and the 105 FW Zones have

the potential to produce high grade nickel ore using selective mining methods.

Although some of the

assay intervals released today are narrow, this style of massive sulphide veins can pinch and swell over

relatively short distances, and it is encouraging to see these zones extending beyond the current Mineral

Resource models. Diamond drilling is ongoing in these areas, and we look forward to providing

additional assay results as they are received."

Diamond drillhole assay results released today are from the 101 FW, 105 FW and 9400 FW Zones, and

were designed to extend known mineralized zones beyond the current mineral resource models. Drillhole

MCR-23-023 targeted the 9400 FW Zone, southwest of the known mineralization and intersected high-

grade Pt+Pd+Au, low sulphide mineralization approximately 30 metres southwest of the current Mineral

Resource.

Drillholes MCR-23-020, MCR-23-021 and MCR-23-024 were designed to test both the 105 FW Zone

and the 101 FW Zone. The 105 FW Zone is similar to the 101 FW Zone (See news release

dated March

2, 2023

), and consists of high nickel tenor, semi massive to massive sulphide veins hosted within a

breccia structure extending into the footwall from the Sudbury Igneous Complex ("SIC"). The footwall

breccias are commonly associated with the mafic volcanic and metasediment contacts and can provide

a structural corridor for sulphide mineralization to extend into the footwall environment of the SIC. Drilling

to date has demonstrated good continuity of sulphide veins within the current mineral resource, and

recent drilling has extended both of these zones beyond where they are currently modelled. The 105 FW

Zone, trends into the footwall from the Main Zone, which was historically the main source of contact Ni-Cu

mineralization at Crean Hill. The 105 FW Zone has historically been defined to the 1500 foot level, and

remains a significant Mineral Resource with historical mining on only a few levels.

The location of the diamond drillholes is illustrated in Figures 1-2, assay results are summarized in Table

1, and drillhole coordinates in Table 2.

Table

1

: Summary of Assay Results

Drillhole

Zone

From (m)

To (m)

Length

(m)

Ni %

Cu %

Co %

Pt g/t

Pd g/t

Au g/t

TPM g/t

NiEq

MCR-23-

020

109 FW

18.72

19.35

0.63

0.03

0.06

0.00

6.78

0.49

0.30

7.57

1.04

105 FW

272.29

272.60

0.31

1.38

0.08

0.07

0.01

1.46

0.13

1.60

1.89

101 FW

326.56

327.00

0.44

4.34

0.20

0.23

0.02

0.08

1.59

1.69

5.09

and

344.92

354.73

9.81

0.77

0.51

0.01

0.03

0.17

0.30

0.50

1.10

Including

347.57

348.00

0.43

11.21

0.68

0.08

0.01

0.06

0.06

0.13

11.63

and

362.00

362.60

0.60

0.82

2.05

0.03

0.01

0.01

0.06

0.08

1.73

MCR-23-

021

101 FW

262.74

263.10

0.36

3.17

0.51

0.03

0.12

0.09

1.20

1.41

3.70

MCR-23-

022

9400 FW

338.60

341.02

2.42

0.06

0.07

0.00

3.89

4.70

1.54

10.13

1.97

MCR-23-

023

9400 FW

No Significanct Values

MCR-23-

024

105 FW

265.48

270.55

5.07

2.60

0.50

0.05

2.32

1.02

0.04

3.39

3.40

Including

265.48

267.63

2.15

6.01

0.97

0.10

5.40

0.32

0.06

5.78

7.29

101 FW

333.57

335.23

1.66

2.42

1.04

0.08

0.02

0.05

0.12

0.19

3.01

Including

334.00

334.77

0.77

5.06

1.33

0.16

0.01

0.01

0.01

0.03

5.85

Intermediate

481.23

483.00

1.77

0.81

0.63

0.03

0.70

0.75

0.27

1.72

1.44

All lengths are downhole length.

NiEq % = ( (Ni% x 2204 x Ni Price $/lb) + (Cu% x 96% Recovery x 2204 x Cu Price $/lb) + (Co% x 56% Recovery x 2204 x Co Price $/lb) + (Pt

gpt x 69% Recovery / 31.1035 x Pt $/oz) +(Pd gpt x 68% Recovery / 31.1035 x Pd $/oz) + (Au gpt x 68% Recovery / 31.1035 x Au $/oz))/2204 x Ni

$/lb

Figure 1: Longitudinal Section of the Crean Hill Deposit Showing the Location of Mineralized

Zones, Drillholes Reported Today, Selected Historical Drillholes, and the 750 Level (See Figure

2).

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/8002/172897_6ea8f71394ed9b1c_003full.jpg

Figure 2: Idealized Geological Plan View of the 750 Level, Showing the 105 FW Breccia Zone in

Relation to Other Crean Hill Mineralized Zones. The Location of Drillhole MCR-23-24 is

Indicated, Along with Selected Historical Drillhole Intersections in the 105 FW Zone.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/8002/172897_6ea8f71394ed9b1c_004full.jpg

Table 2: Drillhole Collar Coordinates

BHID

Easting

Northing

Elevation

Azimuth

Dip

Depth

MCR-22-020

473033

5141811

288

345

72

533

MCR-22-021

472585

5141882

286

332

47

440

MCR-22-022

472580

5141884

286

357

70

503

MCR-22-023

473030

5141814

288

316

55

335

MCR-22-024

473031

5141814

288

332

68

380

*Drillhole Coordinates are in coordinate system NAD 83 Zone 17

Qualified Person

The technical information in this press release has been reviewed and approved by David King, M.Sc.,

P.Geo. Mr. King is the Senior Vice President, Technical Services for Magna Mining Inc.

and is a

qualified person under Canadian National Instrument 43-101.

QA/QC

Sample QA/QC procedures for Magna have been designed to meet or exceed industry standards. Drill

core is collected from the diamond drill and placed in sealed core trays for transport to Magna's core

facilities. The core is then logged, and samples marked in intervals of up to 1.5m and cut with a diamond

saw. Samples are then bagged in plastic bags with 10 bagged samples being placed into rice bags for

transport to Swastika Laboratories in Kirkland Lake Ontario via Gardewine Transport. Samples are

submitted in batches of 50 with 5 QA/QC samples including, 2 certified reference material standards, 2

samples of blank material and 1 duplicate.

About Magna Mining Inc.

Magna Mining is an exploration and development company focused on nickel, copper and PGM projects

in the Sudbury Region of Ontario, Canada. The Company's flagship assets are the past producing

Shakespeare and Crean Hill Mines. The Shakespeare Mine is a feasibility stage project which has

major permits for the construction of a 4,500 tonne per day open pit mine, processing plant and tailings

storage facility and is surrounded by a contiguous 180km

2

prospective land package. Crean Hill is a

past producing nickel, copper and PGM mine with a technical report dated August 2022. Additional

information about the Company is available on SEDAR (

www.sedar.com

) and on the Company's

website (

www.magnamining.com

).

For further information, please contact:

Jason Jessup

Chief Executive Officer

or

Paul Fowler, CFA

Senior Vice President

Email:

[email protected]

Cautionary Statement

This press release contains certain forward-looking information or forward-looking statements as

defined in applicable securities laws. Forward-looking statements are not historical facts and are

subject to several risks and uncertainties beyond the Company's control, including statements

regarding the production at the Shakespeare and Crean HIll Mines, the economic and operational

potential of the Shakespeare and Crean Hill Mines, potential acquisitions, plans to complete

exploration programs, potential mineralization, exploration results and statements regarding beliefs,

plans, expectations, or intentions of the Company. Resource exploration and development is highly

speculative, characterized by several significant risks, which even a combination of careful evaluation,

experience and knowledge may not eliminate. All forward-looking statements herein are qualified by

this cautionary statement. Accordingly, readers should not place undue reliance on forward-looking

statements. The Company undertakes no obligation to update publicly or otherwise revise any

forward-looking statements whether as a result of new information or future events or otherwise, except

as may be required by law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of this

press release.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/172897