Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NICO.CN ·

Class 1 Nickel Prioritizes Newly Identfied Vtem(tm) Conductor Anomalies FOR Upcoming Drilling Campaigns at Alexo‐dundonald

Corporate Updates

CLASS 1 NICKEL PRIORITIZES NEWLY IDENTFIED VTEMTM CONDUCTOR 

ANOMALIES  

 FOR UPCOMING DRILLING CAMPAIGNS AT ALEXO‐DUNDONALD  

 Four Priority 1 VTEMTM anomaly nickel targets identified within favourable 14 km long 

folded komatiite unit that hosts four high‐grade nickel sulphide deposits 

 Detailed geological interpretation and drill program planning is now underway for both   

extension drilling to the known resources and new high impact discovery drilling of the 

high priority VTEMTM anomalies recently identified       

 A much larger mineralised system is now believed to be present at Alexo‐Dundonald 

Toronto, 24 November 2020 – Class 1 Nickel and Technologies Limited (“Class 1 Nickel” or the 

“Company”)  (CSE:  NICO)  is  pleased  to  announce  quantitative  modelling  results  for  the 

preliminary VTEMTM anomalies on its Alexo‐Dundonald Nickel Sulphide Project (the “Project” or 

Property”), 45 km northeast of Timmins, Ontario (Canada). The VTEMTM survey was flown over 

the entire 20 square‐km land package (1,012 line‐km) to detect electromagnetic and magnetic 

signatures  that  could  aid  identification  of  new  deposits  and  extensions  of  known  deposits. 

The four known nickel sulphide deposits on the property (Alexo North, Alexo South, Dundonald 

North and Dundonald South) were all detected in the VTEMTM survey. 

Interpretation and Ranking 

VTEMTM conductor anomalies A to O (collectively, the “Targets”) were identified (Figure 1) based 

on conductance and the extent of historical drill testing. These Targets were also reviewed for 

possible  cultural  interference  in  Google  Earth,  by  using  the  VTEMTM  powerline  monitor  data 

channel,  and  field  checking.  The  priority  Targets  were  then  integrated  with  all  other  data, 

including preliminary Magnetic TMI, db/dt tau, prior AEM/Mag surveys and anomalies, detailed 

property  geology,  known  deposits  and  occurrences,  and  all  known  drilling  from 

company/property  databases  and  the  Ontario  ODHD  drill  hole  database.  Following  data 

integration and target review, the Targets were tabulated and ranked based on five criteria: 

1. Quality and shape of EM/Mag anomalies, with priority assigned to targets with shorter 

strike length, higher conductivity and magnetic association; 

2. Presence or absence of prior drilling, with targets with few or no drill holes given higher 

priority;  

3. Any Ni and Cu values in nearby drill holes; 

4. Proximity to known mineral deposits and occurrences; and 

5. Local geology (proximity to favourable ultramafic rocks) 

This ranking process resulted in four Priority 1 Targets (highest priority), twelve Priority 2 Targets, 

and a few lower Priority 3 Targets. The characteristics of the Priority 1 Targets are highlighted 

below (see Figures 2 and 3 and Table 1). 

Priority 1 Target Highlights  

 The four Priority 1 Targets (A, H, I and J) are multi‐line anomalies similar to the known 

deposits and do not appear to coincide with any cultural interference features; 

 The four Priority 1 Targets are short‐strike length features from 300 m to 800 m in length; 

 Anomaly A follows a local magnetic high, appears to be in mafic‐ultramafic rocks and is 

located 1 km west of the Dundonald North deposit.  It has not been subject to previous 

and historic drilling.  Although there are cultural features nearby, they do not appear to 

explain the anomaly;    

 Anomalies H and J have no apparent drilling in the available databases; 

 Anomaly H is close to the Dundonald South deposit and proximal to the major southwest‐

verging fold nose in the south part of the Property;  

 Anomaly I is sparsely drilled and located 2 km east of the Dundonald South deposit, on 

the south limb of the major southwest‐verging fold, near the Casey mineral occurrence; 

and  

 Anomaly J is located 1.6 km northeast of the Alexo North and Alexo South deposits and 

appears to cross‐cut stratigraphic units in a major northeast‐verging fold nose.   

It is important to note that bedrock conductors can also be caused by graphite, barren sulphides 

and in this geological environment, by thick units of slightly conductive serpentinized ultramafics 

Benjamin Cooper, President & CEO: “Although these interpretations are preliminary, the first‐

ever modern airborne geophysical survey of Alexo‐Dundonald has definitely advanced the case 

for a much larger mineralized system here at Alexo‐Dundonald than was previously understood 

by the Company. “ 

Class 1 Nickel now looks forward to the delivery of additional detailed interpretation of the final 

VTEMTM data set to advance two main objectives.  

1) Detailed  planning  and  commissioning  of  a  significant  extension  drilling  campaign  to 

increase the size and scope of the known resources; and 

2) Design and planning of new exploration drilling campaign over the areas of mineralisation 

outside the known resources (i.e. the Targets that have been identified by the VTEMTM 

survey and associated geophysical modelling).   

Figure 1. Map view of the Alexo‐Dundonald Property showing the A‐O VTEMTM anomalies and 

the four known nickel sulphide deposits on airborne magnetics image.  

Figure 2. Map view showing the four Priority 1 VTEMTM anomalies on interpreted geology and 

the four known nickel sulphide deposits. 

Figure 3.  View looking eastwards and above the horizontal at the VTEMTM conductor 3D model 

plates for Anomalies A, H, I and J on the Alexo‐Dundonald Property.  The plate models (red 

rectangles) and drill hole traces (black lines) are below surface, whereas the conductor axes 

(red and orange) are on surface.  Note that at Anomaly I, three conductor plate models are 

interpreted.  For scale, the distance from Dundonald North to Dundonald South is 1500 m. 

Table 1. Summary of Priority VTEMTM Conductor Plate Models 

Anomaly  Depth to Top 

(m) 

Dip 

(°) 

Dip 

Direction 

(°) 

Length1 

(m) 

Depth Extent 

(m) 

Conductivity*Thickness  Rank 

A   ‐21  80  358  300  200  36  1 

H  ‐98  0.4  140  400  50  200  1 

I‐1  ‐80  20  146  800  300  300  1 

I‐2  ‐87  20  328  800  300  300  1 

I‐3  ‐37  75  326  600  400  20  2 

J  ‐16  85  146  300  200  250  1 

1Lengths are not well constrained   

Next Steps 

 Design follow‐up, ground time‐domain EM surveys and (or) direct drill testing with drill 

hole  time‐domain  EM  surveys,  as  appropriate,  to  test  the  Priority  1  Targets  for  the 

presence of nickel sulphide mineralization;   

 Complete analysis and modelling of the Priority 2 and Priority 3 Targets, particularly as 

additional  historic  data  are  acquired  and  integrated  into  the  target  identification  and 

ranking process; 

 Continue analysis and interpretation of the geophysical signatures and geological features 

of the four known deposits with mineral resources (see Class 1 Nickel news release dated 02 

November  2020)  for  potential  extensions  along  strike  and  at  depth  for  drill  testing. 

The Alexo North, Alexo South, Dundonald South and Dundonald North deposits are all 

open  at  depth  and  along  strike,  and  could  potentially  increase  in  size  with  additional 

drilling; 

 Results from the above activities will the subject of future press releases. 

Versatile Time Domain Electromagnetic (VTEM™)  System 

Geotech’s VTEM™  surveys improve on previous generations of airborne geophysics completed 

over the current Project area by providing the following: 

 Increased Resolution: 100‐metre line spacing design improves on the historic magnetic 

survey flown on 250‐ metre line spacing; 

 Modern  Technology:  Advancements  in  instrument  sensitivity,  data  acquisition  and 

processing are expected to provide superior results;  and 

 Proven Technology and Track Record: VTEMTM surveys are recognized as a successful 

tool for exploration in other magmatic sulphide systems globally. 

Qualified Person 

The geophysical technical information in this news release has been reviewed and approved by 

Mr. Alan King (P.Geo.), geophysicist and technical advisor to the Company, who is a Qualified 

Person  under  the  definitions  established  by  National  Instrument  43‐101.  All  other  technical 

information in this news release has been reviewed and approved by Dr. William Stone (P.Geo.), 

independent  geological  consultant  to  the  Company,  who  is  a  Qualified  Person  under  the 

definitions established by National Instrument 43‐101. 

About Class 1 Nickel and Technologies Limited: 

Class 1 Nickel and Technologies Limited (CSE: NICO) is a Mineral Resource Company focused on 

the development of its 100% owned Alexo‐Dundonald Project, a portfolio of komatiite‐hosted 

magmatic nickel‐copper‐cobalt sulphide Mineral Resources located near Timmins, Ontario, as 

well as developing and exercising its option over the Somanike komatiite hosted nickel copper 

project in Quebec, which includes the well‐known Marbridge Nickel Mine. 

For more information, please contact: 

Benjamin Cooper, President 

T: 416.454.0166 

E: [email protected] 

For additional information please visit our new website at www.class1nickel.com and our 

Twitter feed: @ClassNickel. 

Neither the Canadian Securities Exchange nor its regulation services provider has reviewed or 

accepted responsibility for the adequacy or accuracy of this press release. 

Cautionary Note Regarding Forward‐Looking Statements and Information 

This  press  release  contains  “forward‐looking  statements”  within  the  meaning  of  applicable  Canadian 

securities legislation. Forward‐looking statements include, but are not limited to, statements regarding 

the activities, events or developments that the Company expects or anticipates will or may occur in the 

future,  including  the  growth  potential  and  possible  economics  of  the  project  and  the  Company’s 

understanding of the Alexo‐Dundonald Project, the development potential and timetable of the project; 

the estimation of Mineral Resources; the anticipated timing of the Preliminary Economic Assessment; 

the timing and amount of estimated future exploration; the anticipate results of the Company’s planned 

2021 drill program on the Alexo‐Dundonald Project and its possible impact on the potential size of the 

Mineral  Resource  Estimate;  costs  of  future  activities;  capital  and  operating  expenditures;  success  of 

exploration activities; the anticipated ability of investors to continue benefitting from the Company’s 

low discovery costs; technical expertise and support from local communities. Generally, forward‐looking 

statements can be identified by the use of forward‐looking terminology such as “plans”, “expects” or 

“does not expect”, “is expected”, “budget”, “schedule”, “estimates”, “forecasts”, “intends”, “continue”, 

“anticipates”  or  “does  not  anticipate”,  or  “believes”,  or  variations  of  such  words  and  phrases  or 

statements that certain actions, events or results “may”, “could”, “would”, “will”, “might” or “will be 

taken”,  “occur”  or  “be  achieved”.  Forward‐looking  statements  are  made  based  upon  certain 

assumptions and other important facts that, if untrue, could cause the actual results, performance or 

achievements  of  Class  1  Nickel  to  be  materially  different  from  future  results,  performances  or 

achievements expressed or implied by such statements. Such statements and information are based on 

numerous assumptions regarding present and future business strategies and the environment in which 

Class  1  Nickel  will  operate  in  the  future.  Certain  important  factors  that  could  cause  actual  results, 

performances  or  achievements  to  differ  materially  from  those  in  the  forward‐looking  statements 

include,  amongst  others,  currency  fluctuations,  the  global  economic  climate,  dilution,  share  price 

volatility  and  competition.  Forward‐looking  statements  are  subject  to  known  and  unknown  risks, 

uncertainties  and  other  important  factors  that  may  cause  the  actual  results,  level  of  activity, 

performance  or  achievements  of  Class  1  Nickel  to  be  materially  different  from  those  expressed  or 

implied  by  such  forward‐looking  statements,  including  but  not  limited  to:  the  impact  the  COVID  19 

pandemic may have on the Company’s activities and the economy in general; the impact of the recovery 

post COVID 19 pandemic and its impact on nickel and other metals; there being no assurance that the 

exploration  program  will  result  in  expanded  Mineral  Resources;  risks  and  uncertainties  inherent  to 

Mineral Resource Estimates; receipt of necessary approvals; general business, economic, competitive, 

political  and  social  uncertainties;  future  gold  and  other  metal  prices;  accidents,  labour  disputes  and 

shortages; environmental and other risks of the mining industry, including without limitation, risks and 

uncertainties discussed in the latest annual information form of the Company, in the Technical Report 

on the Property  to be filed and  in other  continuous disclosure  documents of the Company available 

under  the  Company’s  profile  at  www.sedar.com.  Although  Class  1  Nickel  has  attempted  to  identify 

important factors that could cause actual results to differ materially from those contained in forward‐

looking statements, there may be other factors that cause results not to be as anticipated, estimated or 

intended. There can be no assurance that such statements will prove to be accurate, as actual results 

and  future  events  could  differ  materially  from  those  anticipated  in  such  statements.  Accordingly, 

readers  should  not  place  undue  reliance  on  forward‐looking  statements.  Class  1  Nickel  does  not 

undertake to update any forward‐looking statements, except in accordance with applicable securities 

laws.