Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NICN.V ·

NiCAN Intersects a New Mineralized Zone Near Surface at the Wine Project in Manitoba, Including 9.8 Metres at 1.92% Nickel Equivalent

Drill Results

NiCAN Limited

390 Bay St, Suite 700A

Toronto, ON, M5H 2M8

NiCAN Intersects a New Mineralized Zone Near Surface at the Wine Project in Manitoba,

Including 9.8 Metres at 1.92% Nickel Equivalent

Toronto, Ontario – September 20, 2022 – NiCAN Limited (“NiCAN” or the “Company”) (TSX-V:NICN) is

pleased to report additional diamond drill assay results from the Wine project in Manitoba, intersecting a

new mineralized zone near surface. These drill holes , Wine-22-06 and Wine-22-07, were part of NiCAN’s

initial drilling campaign at the Wine project.

Highlights (complete assays set out in Tables 2 and 3):

• New mineralized zone intersected near surface.

• Diamond drill hole Wine-22-06 intersected two distinct zones of mineralization including 9.8 metres

at 2.09% Cu, 1.23% Ni (1.92% NiEq), 0.051% Co, 0.33 g/t Au, 0.016 g/t Pt and 0.12 g/t Pd from 7.4

metres to 17.1 metres.

Note: Nickel Equivalent (“NiEq”) was calculated using copper and nickel values only.

Table 1: Composite Assays Wine-22-06 and Wine-22-07

Drill Hole

ID

From

(m)

To

(m)

Thickness

(m)

Cu

(%)

Ni

(%)

NiEq

(%)

Co

(%)

Au

(g/t)

Pt

(g/t)

Pd

(g/t)

PGM

(g/t)

Wine-22-06 7.4 17.1 9.8 2.09 1.23 1.92 0.05 0.33 0.02 0.12 0.47

Wine-22-06 32.3 35.4 3.1 0.81 0.62 0.89 0.03 0.12 0.00 0.13 0.25

Wine-22-07 9.0 14.0 5.0 0.59 0.23 0.42 0.01 0.10 0.04 0.07 0.21

Brad Humphrey, President and CEO of NiCAN, commented, “The initial diamond drill program at Wine

was focused on improving our understanding of the mineralization at the Wine Occurrence. Intersecting

additional lenses or pods of mineralization , particularly near surface, is an extremely welcome

development. This also supports our view that the Wine gabbro could host several nickel rich pods. NiCAN

remains in a strong position with a solid balance sheet and highly prospective nickel -copper assets in

stable jurisdictions.”

Wine-22-06

Drill hole Wine-22-06 encountered a newly defined lens of nickel mineralization in the upper part of the

drill hole, which averaged 1.92% NiEq over 9.8 metr es (estimated true width of 6.5 metres). Sulphide

mineralization consisted of semi-massive to disseminated pyrrhotite and chalcopyrite with significant

copper mineralization near the base of the zone. It is expected that this lens of mineralization will sub-

crop.

In addition to the newly defined zone, the drill hole intersected a continuation of a lens of mineralization

found in the upper part of drill hole Wine-22-05 (4.1 metres averaging 1.03% Cu, 0.96% Ni (1.31% NiEq))

with 3.1 metres averaging 0.81% Cu, 0.62% Ni (0.89% NiEq), 0.025% Co and 0.25 g/t PGM from 32.3 to

2

35.4 metres (estimated true width of 2.0 metres) (Figure 1). The drill hole did not intersect the main lens

of mineralization found in historical holes and Wine-22-05 as it was too shallow in depth.

All mineralized intersections were hosted by gabbro. The lower intersection in Wine-22-07 was hosted by

the distinct light-coloured gabbro that is associated with the main mineralized gabbro zone.

Figure 1: Drill Holes Wine-22-06 and Wine-22-07 in Relation to Drill Holes Wine-22-05 and Wine-22-02

in a Cross Section Looking Towards the South (180⁰)

Wine-22-07

Drill hole Wine -22-07 (-60⁰) was drilled directly under drill hole Wine-22-06 ( -45⁰) with the intent of

intersecting the main zone of mineralization defined in drill hole Wine-22-05. The drill hole intersected

the base of the newly defined shallow mineralization seen in Wine-22-06 (5.0 metres averaging 0.59% Cu,

0.23% Ni (0.42% NiEq), 0.01% Co and 0.21 g/t PGM from 9.0 to 14.0 metres). The Wine-22-07 intersection

averaged 0.42% NiEq over an estimated true width of 3.3 metr es. The upper lens may have a strike of

330⁰ and may correlate to anomalous copper mineralization seen in the upper parts of historical drill holes

EEL-346 and RAD07-01. The main mineralized lens is currently interpreted to have a strike of 30 ⁰ (Figure

2 and 3).

3

Drill hole Wine-22-07 did not intersect the main zone as it passed through a gap between the upper lens

and the main lens.

Figure 2: Plan View of Drill Collars and Traces in the Wine Occurrence Area

4

Figure 3: Drill Holes Wine-22-06 and Wine-22-07 Presented in a Cross Section Looking Southwest (210⁰)

with Historical Holes*

* Historical drill hole assays are listed in Table 4

Figure 4: Upper Mineralized Zone in Drill Hole Wine-22-06 with Assay Intervals Marked

5

2022 Exploration Program

The 56.8 km 2 Wine property is located west of Snow Lake in Manitoba (Figure 5). The initial 2022

exploration program included an airborne geophysical survey, partial resampling of a historical drill hole,

downhole geophysical (electro -magnetic) surveys and 17 diamond drill holes, 1,600 met res in total,

testing an area known as the Wine Occurrence , as well as seven other nearby geophysical anomalies

(Figure 6). The objective of this program was to confirm the presence of nickel -copper mineralization at

the Wine Occurrence and improve NiCAN’s understanding of the geological model and the orientation of

the mineralization, which will be used to better target future drilling programs.

NiCAN anticipates receiving and releasing additional assay and geophysical survey results, following

quality control, over the next several weeks. The results from this initial exploration work will be used to

refine the geological model and to design a follow up Phase 2 exploration program.

Assay, Analysis and QA/QC

All core samples were sent to the Saskatchewan Research Council (“SRC”) in Saskatoon (an accredited

laboratory) by secure transport for base and precious metal assay. Base metals were assayed by their ICP3

package, which includes a total of 35 analytes by ICP-OES (Inductively Coupled Plasma – Optical Emission

Spectroscopy). Partial digestions were performed on a 0.5 gram aliquot of sample pulp which was digested

in a mixture of HCl:HNO3, in a hot water bath and then diluted to 15 ml using deionized water. Over-limits

for copper, nickel and cobalt had an aliquot of 1.0 gram sample pulp digested in a concentration of

HCl:HNO3. The digested volume was then made up with deionized water for analysis by ICP -OES. Fire

Assay Techniques involved a 30 gram aliquot of sample pulp which was mixed with a standard fire assay

flux in a clay crucible and a silver inquart added prior to fusion. After the mixture was fused, the melt was

poured into a form which was cooled. The lead bead wa s then recovered and cupelled until only the

precious metal bead remained. The bead was then parted in dilute HNO3. The precious metals were then

dissolved in aqua regia and then diluted for analysis by ICP-OES

Laboratory Quality Control protocols were applied to the assay sample package by SRC. NiCAN submitted

a r egular schedule of standards, blanks and duplicates into the sample stream for Quality Control

measures. Drill core samples are split in half using a diamond saw with half saved for reference and the

other half shipped for assay. In the case of duplicate s amples the half core is quarter split with the two

quarter splits sent for separate assay.

NiCAN does not have any historic QA/QC data for the 2007 or earlier drill results.

Qualified Person

Mr. Bill Nielsen, P.Geo, a consultant to NiCAN, who is a qualified person under National Instrument 43 -

101 – Standards of Disclosure of Mineral Projects (“NI 43 -101”) has reviewed and approved the scientific

and technical information in this press release.

Investor Awareness Campaign

NiCAN Limited has entered into an advertising and investor awareness campaign with Dig Media Inc. and

Investing News Network (INN). INN is a private company headquartered in Vancouver, Canada, dedicated

to providing independent news and education to investors since 2007. For the 12-month term of the

agreement, INN will provide advertising to increase awareness of the issuer. INN does not provide Investor

6

Relations or Market Making services. The cost of the campaign is C$49,410, payable in quarterly

installments over the term of the agreement. INN currently holds no securities in NiCAN Limited.

About NiCAN

NiCAN Limited is a mineral exploration company, trading under the symbol “NICN” on the TSX -V. The

Company is actively exploring two nickel projects, both located in well-established mining jurisdictions in

Manitoba, Canada.

Contact Information:

Brad Humphrey Sandy Noyes

President and CEO Investor Relations & Communications

416.565.4007 [email protected]

[email protected]

www.nicanltd.com

To receive news releases by e-mail, please register using the NiCAN website at www.nicanltd.com.

Cautionary Note Regarding Forward-Looking Statements

The information contained herein contains certain “forward -looking information” under applicable

securities laws concerning the proposed financing, business, operations and financial performance and

condition of NiCAN Limited. Forward -looking information includes, but is not limited to, the size and

timing of the drill program, results of the drill program, NiCAN’s ability to identify mineralization similar

to that found in prior drill holes, the benefits and the potential of the properties of the C ompany; future

commodity prices (includi ng in relation to NiEq calculations); drilling and other exploration potential;

costs; and permitting. Forward -looking information may be characterized by words such as “plan,”

“expect,” “project,” “intend,” “believe,” “anticipate”, “estimate” and other si milar words, or statements

that certain events or conditions “may” or “will” occur. Forward-looking information is based on the

opinions and estimates of management at the date the statements are made and are based on a number

of assumptions and subject to a variety of risks and uncertainties and other factors that could cause actual

events or results to differ materially from those projected in the forward-looking information. Many of

these assumptions are based on factors and events that are not within th e control of the C ompany and

there is no assurance they will prove to be correct. Factors that could cause actual results to vary

materially from results anticipated by such forward -looking information includes changes in market

conditions, fluctuating metal prices and currency exchange rates, the possibility of project cost overruns

or unanticipated costs and expenses and permitting disputes and/or delays. Although the C ompany has

attempted to identify important factors that could cause actual actions, eve nts or results to differ

materially from those described in forward-looking information, there may be other factors that cause

actions, events or results not to be anticipated, estimated or intended. There can be no assurance that

forward-looking informati on will prove to be accurate, as actual results and future events could differ

materially from those anticipated in such statements. The Co mpany undertakes no obligation to update

forward-looking information if circumstances or management’s estimates or op inions should change

7

except as required by applicable securities laws. The reader is cautioned not to place undue reliance on

forward-looking information.

Neither TSX-V nor its Regulation Services Provider (as that term is defined in policies of the TSX -V) accepts

responsibility for the adequacy or accuracy of this release.

Figure 5: Wine Project Location

8

Figure 6: Historical Drill Hole and 2022 Drill Hole Locations

Note: Wine-22-06 and Wine-22-07 were drilled from the same drill pad.