Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NICN.V ·

NiCAN Intersects 1.54% Nickel over 1.45 Meters on the Pipy South Project, Thompson Manitoba

Drill Results

NiCAN Limited

130 King St West, Suite 3680

P.O Box 99

Toronto, ON M5X 1B1

NiCAN Intersects 1.54% Nickel over 1.45 Meters

on the Pipy South Project, Thompson Manitoba

Toronto, Ontario – February 17, 2026 – NiCAN Limited (“NiCAN” or the “Company”) (TSX-V:NICN/

OTCQB:NILTF/FRA:W8Y) has confirmed high-grade nickel bearing massive sulphides in the prospective

Pipe Formation which underlays the Pipy South Property, intersecting 1.54% nickel, 0.17% copper and

0.064% Co over 1.45 meters (m) at 60m below surface in its Phase I reconnaissance drilling program. The

Pipe Formation hosts all of the economic nickel mineralization within the Thompson Nickel Belt. The Pipy

South Nickel Project is located 20km to the north of Vale’s Thompson Nickel Mine in Thompson Manitoba.

Brad Humphrey, President and CEO of NiCAN, commented, “NiCAN is pleased to report assay results

from nickel-bearing massive sulphides on the highly prospective Pipy South Property. The objective of

our initial reconnaissance drill program was to confirm the presence of nickel mineralization, and this

intersection clearly demonstrates that nickel sulphides occur within the favourable Pipe Formation on

the Pipy South property. Follow-up geophysical surveys completed both downhole and along strike

indicate the mineralized system remains open to the north and south, as well as up- and down-dip. The

Company is currently advancing plans for a follow-up drill program to further test this mineralized

horizon, which can be traced over a five-kilometre strike length.”

“Drilling at Pipy South in late 2025 not only achieved our primary objective, confirming nickel sulphides,

but also resulted in the discovery of a new gold zone on the property. The Company is now designing

exploration programs to advance both the nickel and gold targets.”

“The project benefits from excellent infrastructure, with roads and existing trail networks traversing the

property, and is located immediately north of the City of Thompson, home to Vale’s long-producing

Thompson Nickel Mine Complex.”

Diamond Drill Hole PIPY25-06

Diamond drill hole PIPY25-06 was drilled in the vicinity of a historical 1966 INCO diamond drill hole that

intersected a 1.35m zone described in the drill-log as “mineral breccia” (Manitoba Assessment File 99136).

No assays accompanied the drill log. Another INCO drill hole located 250m to the south of PIPY25-06

intersected 2.13m of “mineral zone” indicating good to excellent potential to expand the mineralization.

Figure 1: Massive Sulphides in Diamond Drill Hole PIPY25-06

2

Stanley Clemmer, P.Geo, consulting geologist to NiCAN, commented “I am very encouraged by the

intersection of nickel bearing massive sulphides at the Pipy South property. Having explored, in the past,

for nickel in the Thompson Nickel Belt and elsewhere, I know how rare and difficult it is to intersect

sulphides like this, particularly in a new area and so close Vale’s Thompson Mine. I look forward to

NICAN’s upcoming drill programs.”

Strong associated geophysical response

A downhole electromagnetic (BHEM) survey conducted on PIPY25-06, displayed an in-hole conductive

anomaly which correlates well with the intersected mineralization. Four surface lines of transient

electromagnetic (TEM) were also completed over the immediate area and 400m to the south. The

geophysical survey displayed strong conductivity over the entire 400m length, with the anomaly open

along strike to the north and south as well as up and down dip (Figure 2).

Figure 2: Pipy South 2025 Nickel Diamond Drill Holes

Based on NiCAN’s detailed aeromagnetic survey, the prospective Pipe Formation stratigraphy intersected

in PIPY25-06 can be traced for five kilometers along strike on NiCAN’s two claim blocks, called Pipy South.

Two-kilometers of the five-kilometer Pipe Formation’s prospective strike length is present on the southern

claim block where historic hole BD-02 (Manitoba Assessment Report 99102) reported two 0.3m intervals

of 1.55% and 1.04% nickel within Pipe Formation sediments.

3

Follow up work is planned as the thickness of sulphide intersections can vary significantly along strike due

to the polyphase deformation within the Thompson Nickel Belt and relatively thin intervals can be present

adjacent to much thicker zones as illustrated in the 1C orebody at the Thompson Nickel Mine (Figure 3).

Figure 3: Thompson Nickel Mine Section

Source: Camiro TNB Project 97E-02 Final Report (2004 Revision)

NiCAN plans follow-up drilling to trace and expand the nickel bearing massive sulphide zone intersected

in PIPY25-06. Additionally, an airborne electromagnetic survey has been designed to trace the conductive

trend that hosts the massive sulphides and define other prospective mineralized zones.

Pipy Project Overview

The Pipy South Project is included in an Exploration Agreement with Nisichawayasihk Cree Nation (“NCN”).

The Pipy Properties consist of two project areas, Pipy South and Pipy North, totaling 27.0km 2 in the well-

established Thompson Nickel Belt. Initial exploration activities will focus on the Pipy South Project, which

is adjacent to the Mystery Lake South area, located approximately 20 km northeast of the City of

Thompson and Vale’s Thompson Nickel Mine, with excellent road access and local infrastructure (Figure

4).

4

Figure 4: Pipy South Property Location and Infrastructure

Note: Mineral Resources for Moak Lake and Mystery Lake deposits are historical resource estimates listed

in Manitoba Energy and Mines Geological Services Open File Report OF90-2. The historical mineral

resource for the Mel Deposit is listed in 43-101 Victory Nickel Inc. Technical Report on Mel Deposit (2007).

Qualified Person

Mr. Stanley Clemmer, P.Geo, an independent consultant to NiCAN, who is a qualified person under

National Instrument 43-101 – Standards of Disclosure of Mineral Projects (“NI 43-101”) has reviewed and

approved the scientific and technical information in this press release.

5

About NiCAN

NiCAN Limited is a mineral exploration company, trading under the symbols “NICN” on the TSX-V, “NILTF”

on the OTCQB and “W8Y” on the FRA. The Company is actively exploring two projects, the high grade

nickel-copper Wine Project and highly prospective Pipy Project, both located in well-established mining

jurisdictions in Manitoba, Canada.

Contact Information:

Brad Humphrey Sandy Noyes

President and CEO Investor Relations & Communications

416.565.4007 [email protected]

[email protected]

www.nicanltd.com

To receive news releases by e-mail, please register using the NiCAN website at www.nicanltd.com

Cautionary Note Regarding Forward-Looking Statements

The information contained herein contains certain “forward-looking information” under applicable

securities laws concerning the proposed financing, business, operations and financial performance and

condition of NiCAN Limited. Forward-looking information includes, but is not limited to, the size and

timing of the drill program, results of the drill program, interpretations of the various surveys, NiCAN’s

ability to identify mineralization similar to that found in prior drill holes, the benefits and the potential of

the properties of the Company; future commodity prices (including in relation to NiEq calculations);

drilling and other exploration potential; costs; and permitting. Forward-looking information may be

characterized by words such as “plan,” “expect,” “project,” “intend,” “believe,” “anticipate”, “estimate”

and other similar words, or statements that certain events or conditions “may” or “will” occur. Forward-

looking information is based on the opinions and estimates of management at the date the statements

are made and are based on a number of assumptions and subject to a variety of risks and uncertainties

and other factors that could cause actual events or results to differ materially from those projected in the

forward-looking information. Many of these assumptions are based on factors and events that are not

within the control of the Company and there is no assurance they will prove to be correct. Factors that

could cause actual results to vary materially from results anticipated by such forward-looking information

includes changes in market conditions, fluctuating metal prices and currency exchange rates, the

possibility of project cost overruns or unanticipated costs and expenses and permitting disputes and/or

delays. Although the Company has attempted to identify important factors that could cause actual

actions, events or results to differ materially from those described in forward-looking information, there

may be other factors that cause actions, events or results not to be anticipated, estimated or intended.

There can be no assurance that forward-looking information will prove to be accurate, as actual results

and future events could differ materially from those anticipated in such statements. The Company

undertakes no obligation to update forward-looking information if circumstances or management’s

6

estimates or opinions should change except as required by applicable securities laws. The reader is

cautioned not to place undue reliance on forward-looking information.

Neither TSX-V nor its Regulation Services Provider (as that term is defined in policies of the TSX-V)

accepts responsibility for the adequacy or accuracy of this release.

Figure 5: NiCAN’s Project Locations in Manitoba, Canada