NiCAN Identifies Gold Target at Pipy South Project,
NiCAN Limited
130 King St West, Suite 3680
P.O Box 99
Toronto, ON M5X 1B1
NiCAN Identifies Gold Target at Pipy South Project,
Thompson, Manitoba
Toronto, Ontario – January 27, 2026 – NiCAN Limited (“NiCAN” or the “Company”) (TSX-V:NICN/OTCQB:
NILTF/FRA:W8Y) has identified a high priority gold target on its recently acquired claim located adjacent
to the Pipy South Property (Figure 1). A historical diamond drill hole returned 6.63g/t Au and 10.13g/t
Ag over 5.6 metres (m) within a wider, near-surface zone of mineralization that averages 1.20g/t Au
and 5.90g/t Ag over 47.0m. The orientation and true width of the gold bearing intersection are currently
unknown and will be determined by future drilling.
The historical diamond drill intercept was compiled from an unpublished 2017 report which includes assay
results with accredited laboratory certification as well as reliable QAQC data. NiCAN has not yet been able
to locate the core from this drill hole.
Table 1. Historical Gold Intercept on the Pipy South Property
Hole # From To m Au g/t Ag g/t
17BN01 27.0 74.0 47.0 1.20 5.90
17BN01 incl. 31.0 42.0 11.0 0.92 14.38
17BN01 incl. 55.4 61.0 5.6 6.63 10.13
17BN01 incl. 57.4 59.4 2.0 15.35 14.80
From historical reports
NiCAN has subsequently drilled 4 diamond drill holes in the immediate area of the gold intercept as part
of its recent reconnaissance diamond drilling program on the Pipy South Property (See news release
dated January 19, 2026 ). Drilling suggests the gold mineralization is hosted by a silicate facies iron
formation containing between 1% and 5% disseminated pyrrhotite as well as up to 1% galena and
chalcopyrite. Detailed logging has noted an extensive alteration halo around the mineralization described
as silicified biotite gneiss. The alteration halo was not completely defined by the limited 2025 drilling and
hole PIPY25-07 displayed alteration along its entire length of over 80m. The presence of gold
mineralization in iron formation and associated alteration is analogous to other iron formation hosted
gold camps including Homestake, Musselwhite, Geraldton, and many others around the world. Assays are
pending.
In the historical drill hole, what was described as a biotite amphibolite gneiss with 0.5% to 2.0%
disseminated pyrrhotite was intersected at 55.4m and the fire assays indicated this was gold bearing.
Subsequent sampling revealed that the gold bearing zone was significantly more extensive than initial
assaying had indicated. Downhole magnetic susceptibility readings indicate a correlation between the
gold and positive magnetic readings. Of further interest was the interval from 31.0m to 42.0m, which
returned 0.92g/t Au, 14.38g/t Ag and 0.56% Pb.
The 2017 diamond drill hole was targeting an extensive north-south trending magnetic anomaly
interpreted to be a nickel target. A garnet bearing amphibolite was encountered at a depth of 153.4 to
160.2m that contained sufficient disseminated pyrrhotite to explain the magnetic signature. Assaying did
not indicate any appreciable nickel-copper concentrations or notable amounts of gold associated with this
deeper mineralization, although one 2.0m interval returned 0.39g/t Au at 157.4m.
2
Brad Humphrey, President and CEO of NICAN commented, “NiCAN is very intrigued by this new gold
target in an area historically considered to host only nickel mineralization. This style of gold
mineralization is relatively unique within the Thompson Nickel Belt, and NiCAN intends to re-examine
historical data with a fresh perspective to identify additional opportunities along the belt. The Company
plans to commence geophysical surveys, followed by diamond drilling, to further examine the gold-
bearing horizon.”
Pipy Project Overview
The Pipy South Project is included in an Exploration Agreement with Nisichawayasihk Cree Nation (“NCN”).
The Pipy Properties consist of three project areas, in the world class Thompson Nickel Belt. Initial
exploration activities focus on the Pipy South Project, which is adjacent to the Mystery Lake South area,
located approximately 20km northeast of the City of Thompson and Vale’s Thompson Nickel Mine, with
excellent road access and local infrastructure (Figure 1).
Figure 1: Pipy South Property Location and Infrastructure
3
Note: Mineral Resources for Moak Lake and Mystery Lake deposits are historical resource estimates listed
in Manitoba Energy and Mines Geological Services Open File Report OF90-2. The historical mineral
resource for the Mel Deposit is listed in 43-101 Victory Nickel Inc. Technical Report on Mel Deposit (2007).
Qualified Person
Mr. Stanley Clemmer, P.Geo, an independent consultant to NiCAN, who is a qualified person under
National Instrument 43-101 – Standards of Disclosure of Mineral Projects (“NI 43-101”) has reviewed and
approved the scientific and technical information in this press release.
About NiCAN
NiCAN Limited is a mineral exploration company, trading under the symbol “NICN” on the TSX-V. The
Company is actively exploring two projects , the high grade nickel-copper Wine Project and highly
prospective Pipy Project, both located in well-established mining jurisdictions in Manitoba, Canada.
Contact Information:
Brad Humphrey Sandy Noyes
President and CEO Investor Relations & Communications
416.565.4007 [email protected]
www.nicanltd.com
To receive news releases by e-mail, please register using the NiCAN website at www.nicanltd.com
Cautionary Note Regarding Forward-Looking Statements
The information contained herein contains certain “forward-looking information” under applicable
securities laws concerning the proposed financing, business, operations and financial performance and
condition of NiCAN Limited. Forward-looking information includes, but is not limited to, the size and
timing of the drill program, results of the drill program, interpretations of the various surveys, NiCAN’s
ability to identify mineralization similar to that found in prior drill holes, the benefits and the potential of
the properties of the Company; future commodity prices (including in relation to NiEq calculations);
drilling and other exploration potential; costs; and permitting. Forward-looking information may be
characterized by words such as “plan,” “expect,” “project,” “intend,” “believe,” “anticipate”, “estimate”
and other similar words, or statements that certain events or conditions “may” or “will” occur. Forward-
looking information is based on the opinions and estimates of management at the date the statements
are made and are based on a number of assumptions and subject to a variety of risks and uncertainties
and other factors that could cause actual events or results to differ materially from those projected in the
forward-looking information. Many of these assumptions are based on factors and events that are not
within the control of the Company and there is no assurance they will prove to be correct. Factors that
could cause actual results to vary materially from results anticipated by such forward-looking information
includes changes in market conditions, fluctuating metal prices and currency exchange rates, the
4
possibility of project cost overruns or unanticipated costs and expenses and permitting disputes and/or
delays. Although the Company has attempted to identify important factors that could cause actual
actions, events or results to differ materially from those described in forward-looking information, there
may be other factors that cause actions, events or results not to be anticipated, estimated or intended.
There can be no assurance that forward-looking information will prove to be accurate, as actual results
and future events could differ materially from those anticipated in such statements. The Company
undertakes no obligation to update forward-looking information if circumstances or management’s
estimates or opinions should change except as required by applicable securities laws. The reader is
cautioned not to place undue reliance on forward-looking information.
Neither TSX-V nor its Regulation Services Provider (as that term is defined in policies of the TSX-V) accepts
responsibility for the adequacy or accuracy of this release.
Figure 2: NiCAN’s Project Locations in Manitoba, Canada