Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NICN.V ·

NiCAN Defines Several New Target Areas at The Wine Project in Manitoba

Exploration Programs

NiCAN Limited

130 King St West, Suite 3680

P.O Box 99

Toronto, ON M5X 1B1

NiCAN Defines Several New Target Areas at The Wine Project in Manitoba

Toronto, Ontario – October 29, 2024 – NiCAN Limited (“NiCAN” or the “Company”) (TSX-

V:NICN/OTCQB:NILTF/FRA:W8Y) has defined a significant number of new untested target areas at the

high-grade Wine Nickel-Copper Project, near Snow Lake, Manitoba, from geophysical surveys and further

groundwork completed this year.

Brad Humphrey, President and CEO of NiCAN, commented, “We are very encouraged with the new

information garnered from the 2024 Time Domain Electromagnetic (“TDEM”) survey and follow up Beep

Mat survey, which defined a significant number of new targets across the Wine Gabbro area. These new

high-priority targets warrant further exploration work and drill testing. The NiCAN Team has greatly

expanded the potential of the Wine Property and set out the analogies to the Lynn Lake nickel deposits

more clearly.”

“We continue to focus more broadly across the Wine Gabbro with its multiple mineralized horizons and

these recently completed surveys have significantly increased our understanding of the specific target

areas. The 2024 TDEM survey, combined with the historical drilling, geophysical and geochemical work

completed to date , has assisted in generating the targets for further drill programs within the

prospective Wine Gabbro (Figure 2).”

Figure 1. Wine Gabbro and Conductive Horizons

2

A detailed review and interpretation of the 2024 TDEM survey defined several new untested target

areas, including a new untested conductive horizon at the eastern boundary of the Wine Gabbro. These

untested areas have subsequently be en geophysicaly modeled (Figure 2). A ground assessment of six

priority target areas was recently surveyed utilizing a shallow penetrating EM unit (Beep Mat). This work

yielded multiple near surface conductive sources (Figure 4) that require additional evaluation through

prospecting and rock sampling, which is currently underway.

Figure 2. New Targets Defined by 2024 TDEM and Beep Mat Surveys

A drill program is currently being designed to test the newly defined targets across the greater Wine

Gabbro and to define the down plunge extension of the high-grade Wine Occurrence as well as to expand

other proximal mineralized zones (Figure 3).

Diamond drill hole Wine 24-2 from NiCAN’s 2024 drilling returned the deepest and most southern

intersection to date at the Wine Occurrence, cutting the Upper Zone at a downhole depth of 76.5

meters (approximately 67 meters from surface) returning 1.77% NiEq over 6.5 meters and the Main

Zone at a downhole depth of 87.0 meters (approximately 73 meters from surface) returning 0.82% NiEq

over 17.5 meters (Figure 3) (See NiCAN press releases of May 6, 2024 and May 29, 2024). This down

plunge extension of the Upper Zone and Main Zone is a priority target for further drilling.

Future drill programs will also test the depth extent of the newly discovered Northern Zone which was

intersected at surface in diamond drill hole Wine 24-1A returning 3.7 meters averaging 1.89% NiEq (See

New Targets

3

NiCAN press release of May 6, 2024). This Northern zone is interpreted to be the up plunge of a zone

intersected in diamond drill hole Wine 22-3 which returned 8.6 meters averaging 2.22% NiEq from 66.6

and 1.8 meters at an average grade 1.53% NiEq from 79.5 (See NiCAN press release of November 9,

2022).

Figure 3. Longitudinal View of the Wine Occurrence - 25-meter-thick slice showing the Main Zone, Upper

Zone and Northern Zone

Note: Nickel and Copper equivalent grades include nickel and copper values only and assume recoveries of 85% for

nickel and 85% for copper based on comparable deposits. The equivalent calculation uses a 6-year trailing average

with a Nickel price of US$8.10/lb and Copper price of US$3.40/lb.

4

The 2024 TDEM survey defined untested conductors that have been geophysicaly modeled. The Beep Mat

instrumentation was conducted over 6 of these target areas, which included the Wine Occurrence where

near surface mineralization has been intersected by drilling (Upper Zone and Northern Zone). This survey

delineated many additional near surface conductive responses that are being investigated with a

prospecting and rock sampling program that is currently underway.

Figure 4. Anomalous Beep Mat Survey Results

At the high-grade Wine Occurrence several new TDEM conductive responses were defined to the north

and northeast of the known mineralization, interpreted to be 350 meters and 1,000 meters along strike,

respectively. Additional TDEM targets have also been identified approximately 150 to 400 meters to the

southwest. A drill program is currently being designed to test these new targets along strike of the Wine

Occurrence.

The majority of the new ly delineated TDEM conductive responses are associated with the Central

Mineralized Zone. However, a series of new TDEM responses located between 200 meters and 400 meters

east of the Central Mineralized Zone are of particular interest with subsequent geophysical modelling and

Beep Mat surveys providing specific drill targets. Five of these targets are scheduled for near term

prospecting and rock sampling to prioritize targets for future drill testing , potentially opening up a new

mineralized horizon further to the east.

5

Since acquiring the original Wine Property claims, NiCAN has drilled a total of 7,686 meters in 60 diamond

drill holes on the Wine Property, with 2, 104 meters for 21 diamond drill holes focused on the Wine

Occurrence.

Analogies to Historical Lynn Lake Nickel Deposits

The recently completed surveys on the Wine Gabbro appear to support NiCAN ’s belief that the nickel

mineralization hosted by the Wine Gabbro may have analogies to the nickel-copper deposits in the Lynn

Lake area, which is to the north of the Wine property. At Lynn Lake, approximately 22.2 million tonnes

averaging 1.0% nickel and 0.5% copper were historically mined at the Farley Mine . The Farley Mine

consisted of multiple lenses of mineralization contained within a 4.2 km2 gabbro body. The 4.0 km2 Wine

Gabbro area contains numerous similarities and has seen very little exploration for nickel-copper deposits.

Central Canada Mineral Exploration Convention

NiCAN will be sponsoring and attending the Central Canada Mineral Exploration Convention (“CCMEC”) in

Winnipeg on November 4th and 5th. The Company looks forward to meeting with investors, consultants

and contractors, our First Nation partners and Provincial Government Officials.

Qualified Person

Mr. Bill Nielsen, P.Geo, a consultant to NiCAN, who is a qualified person under National Instrument 43 -

101 – Standards of Disclosure of Mineral Projects (“NI 43-101”) has reviewed and approved the scientific

and technical information in this news release.

About NiCAN

NiCAN Limited is a mineral exploration company, trading under the symbol “NICN” on the TSX -V. The

Company is actively exploring two nickel projects, both located in well-established mining jurisdictions in

Manitoba, Canada.

Contact Information:

Brad Humphrey Sandy Noyes

President and CEO Investor Relations & Communications

416.565.4007 [email protected]

[email protected]

www.nicanltd.com

To receive news releases by e-mail, please register using the NiCAN website at www.nicanltd.com

Cautionary Note Regarding Forward-Looking Statements

The information contained herein contains certain “forward -looking information” under applicable

securities laws concerning the proposed financing, business, operations and financial performance and

condition of NiCAN Limited. Forward -looking information includes, but is not limited to, the size and

6

timing of the drill program, results of the drill program, interpretations of the various surveys , NiCAN’s

ability to identify mineralization similar to that found in prior drill holes, the benefits and the potential of

the properties of the C ompany; future commodity prices (including in relation to NiEq calculations);

drilling and other exploration potential; costs; and permitting. Forward -looking information may be

characterized by words such as “plan,” “expect,” “project,” “intend,” “believe,” “an ticipate”, “estimate”

and other similar words, or statements that certain events or conditions “may” or “will” occur. Forward -

looking information is based on the opinions and estimates of management at the date the statements

are made and are based on a number of assumptions and subject to a variety of risks and uncertainties

and other factors that could cause actual events or results to differ materially from those projected in the

forward-looking information. Many of these assumptions are based on factors and ev ents that are not

within the control of the C ompany and there is no assurance they will prove to be correct. Factors that

could cause actual results to vary materially from results anticipated by such forward-looking information

includes changes in market conditions, fluctuating metal prices and currency e xchange rates, the

possibility of project cost overruns or unanticipated costs and expenses and permitting disputes and/or

delays. Although the C ompany has attempted to identify important factors that coul d cause actual

actions, events or results to differ materially from those described in forward-looking information, there

may be other factors that cause actions, events or results not to be anticipated, estimated or intended.

There can be no assurance tha t forward-looking information will prove to be accurate, as actual results

and future events could differ materially from those anticipated in such statements. The Co mpany

undertakes no obligation to update forward -looking information if circumstances or m anagement’s

estimates or opinions should change except as required by applicable securities laws. The reader is

cautioned not to place undue reliance on forward-looking information.

Neither TSX-V nor its Regulation Services Provider (as that term is defined in policies of the TSX -V) accepts

responsibility for the adequacy or accuracy of this release.

7

Figure 5: Wine Project Location, Manitoba, Canada