Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NICN.V ·

NiCAN Confirms New Gold Discovery in Thompson Manitoba, Intersecting 27.6 Meters of 1.25g/t Gold

Drill Results

NiCAN Limited

130 King St West, Suite 3680

P.O Box 99

Toronto, ON M5X 1B1

NiCAN Confirms New Gold Discovery in Thompson Manitoba,

Intersecting 27.6 Meters of 1.25g/t Gold

Toronto, Ontario – February 9, 2026 – NiCAN Limited (“NiCAN” or the “Company”) (TSX-V:NICN/OTCQB:

NILTF/FRA:W8Y) has confirmed a new near surface gold discovery in Thompson Manitoba intersecting

27.6 metres (m) of 1.25 g/t Au and 12.5 g/t Ag (Table 1). A total of four shallow diamond drill holes were

completed late in 2025 to confirm results from a historical diamond drill hole (see press release dated

January 27, 2026).

Diamond drill hole PIPY25-04, the first to test the target, intersected mineralized silicified biotite gneiss

and silicate facies iron formation with disseminated pyrrhotite, pyrite and minor visible galena. A 27.6m

section returned 1.25 g/t Au and 12.5 g/t Ag from 20.4m downhole, including 14.2m averaging 2.14 g/t

Au and 19.8 g/t Ag.

Table 1. Highlights from Diamond Drill Holes PIPY25-04 and PIPY25-05 on the Pipy South Property

Hole # From (m) To (m) Length (m) Gold g/t Silver g/t

PIPY25-04 20.4 48.0 27.6 1.25 12.5

PIPY25-04 incl. 21.4 35.7 14.3 2.14 19.8

PIPY25-04 incl. 33.7 35.7 2.0 5.39 7.10

PIPY25-05 9.6 19.1 9.5 0.65 8.40

Brad Humphrey, President and CEO of NiCAN, commented, “NiCAN is very excited by this new gold

discovery within the Thompson area. With gold prices at or near all-time highs, this discovery adds

compelling value to the Company’s exploration portfolio. The gold mineralization appears to be open

in all directions and is notably unique within the Thompson Nickel Belt. NiCAN has already initiated a

geophysical program and is preparing for follow-up diamond drilling to advance and further define

this emerging gold system.”

Figure 1. Mineralization in Diamond Drill Hole PIPY25-08

2

Diamond drill hole PIPY25-05 was drilled to the west and above PIPY25-04 and is interpreted to have

overshot the zone but still returned 9.5m averaging 0.65 g/t Au and 8.4 g/t Ag.

The 50-gram fire assay results were subsequently verified by photon assaying on approximately 500-gram

samples. The correlation between the two-assay methods was very high with the photon assaying of

PIPY25-04 returning 1.28 g/t Au over 27.6m and PIPY25-05 returning 0.66 g/t over 9.5m. The correlation

between the 50-gram and 500-gram samples suggest a well disseminated mineralized body with a low

nugget effect on the gold.

Holes PIPY25-07 and PIPY25-08 were drilled 25m to the south and both intersected a broad zone of

silicification and mineralization. Assays are pending. The zone is interpreted to strike to the north, remains

open in all directions, and appears to dip steeply to the west.

NiCAN’s work permit applied to a single area, limiting the Company’s ability to drill beyond the

confirmation hole. The Company is currently in the process of permitting a number of additional drill pads

in this area for follow-up drilling.

The gold mineralization is hosted within a silicate facies iron formation and a silicified biotite gneiss, which

visually contains an estimated 1% to 5% disseminated pyrrhotite as well as up to 1% galena and minor

chalcopyrite. Alteration is marked by bleaching and silicification that has not been completely defined by

the limited 2025 drilling and hole PIPY25-07 displayed alteration along its entire length of over 80m. The

presence of gold mineralization in iron formation and associated alteration is analogous to other iron

formation hosted gold camps including Homestake, Musselwhite, Geraldton, Back River, and many others

around the world.

The iron formation hosting the gold mineralization is magnetic and can be traced throughout the property

utilizing an historical airborne magnetic survey reprocessed by NiCAN as shown in Figure 2.

A historical diamond drill hole in the same vicinity, 17BN01, returned 6.63 g/t Au over 5.6m within a wider

zone of 1.20 g/t Au over 47.0m starting at 27.0m downhole hosted by similar rock types to those seen in

the NiCAN 2025 drill program (Table 2). Downhole magnetic susceptibility readings of all drill holes

indicate a correlation between the gold and positive magnetic readings.

Table 2. Historical Gold Intercept on the Pipy South Property

Hole # From (m) To (m) Length (m) Gold g/t Silver g/t

17BN01 27.0 74.0 47.0 1.20 5.90

17BN01 incl. 55.4 61.0 5.6 6.63 10.13

17BN01 incl. 57.4 59.4 2.0 15.35 14.80

From historical reports

A second 2017 historical diamond drill hole, located 500m north of hole 17BN01, targeted an extensive

north-south trending magnetic anomaly interpreted to be a nickel target. A garnet bearing amphibolite

was encountered at a depth of 153.4m to 160.2m that contained sufficient disseminated pyrrhotite to

explain the magnetic signature. No significant nickel assays were returned in the interval but a 2.0m long

portion assayed 0.39 g/t gold at 157.4m, indicating other gold bearing zones are present.

3

Figure 2: Aeromagnetic Image Showing Prominent North-South Magnetic Feature and Interpreted

Folding

Pipy Project Overview

The Pipy South Project is included in an Exploration Agreement with Nisichawayasihk Cree Nation (“NCN”).

The Pipy Properties consist of two project areas, Pipy South and Pipy North, totaling 27.0 km2 in the well-

established Thompson Nickel Belt. Initial exploration activities will focus on the Pipy South Project, which

is adjacent to the Mystery Lake South area, located approximately 20 km northeast of the City of

Thompson and Vale’s Thompson Nickel Mine, with excellent road access and local infrastructure (Figure

3).

4

Figure 3: Pipy South Property Location and Infrastructure

Note: Mineral Resources for Moak Lake and Mystery Lake deposits are historical resource estimates listed

in Manitoba Energy and Mines Geological Services Open File Report OF90-2. The historical mineral

resource for the Mel Deposit is listed in 43-101 Victory Nickel Inc. Technical Report on Mel Deposit (2007).

Qualified Person

Mr. Stanley Clemmer, P.Geo, an independent consultant to NiCAN, who is a qualified person under

National Instrument 43-101 – Standards of Disclosure of Mineral Projects (“NI 43-101”) has reviewed and

approved the scientific and technical information in this press release.

About NiCAN

NiCAN Limited is a mineral exploration company, trading under the symbols “NICN” on the TSX-V, “NILTF”

on the OTCQB and “W8Y” on the FRA. The Company is actively exploring two projects, the high grade

5

nickel-copper Wine Project and highly prospective Pipy Project, both located in well-established mining

jurisdictions in Manitoba, Canada.

Contact Information:

Brad Humphrey Sandy Noyes

President and CEO Investor Relations & Communications

416.565.4007 [email protected]

[email protected]

www.nicanltd.com

To receive news releases by e-mail, please register using the NiCAN website at www.nicanltd.com

Cautionary Note Regarding Forward-Looking Statements

The information contained herein contains certain “forward-looking information” under applicable

securities laws concerning the proposed financing, business, operations and financial performance and

condition of NiCAN Limited. Forward-looking information includes, but is not limited to, the size and

timing of the drill program, results of the drill program, interpretations of the various surveys, NiCAN’s

ability to identify mineralization similar to that found in prior drill holes, the benefits and the potential of

the properties of the Company; future commodity prices (including in relation to NiEq calculations);

drilling and other exploration potential; costs; and permitting. Forward-looking information may be

characterized by words such as “plan,” “expect,” “project,” “intend,” “believe,” “anticipate”, “estimate”

and other similar words, or statements that certain events or conditions “may” or “will” occur. Forward-

looking information is based on the opinions and estimates of management at the date the statements

are made and are based on a number of assumptions and subject to a variety of risks and uncertainties

and other factors that could cause actual events or results to differ materially from those projected in the

forward-looking information. Many of these assumptions are based on factors and events that are not

within the control of the Company and there is no assurance they will prove to be correct. Factors that

could cause actual results to vary materially from results anticipated by such forward-looking information

includes changes in market conditions, fluctuating metal prices and currency exchange rates, the

possibility of project cost overruns or unanticipated costs and expenses and permitting disputes and/or

delays. Although the Company has attempted to identify important factors that could cause actual

actions, events or results to differ materially from those described in forward-looking information, there

may be other factors that cause actions, events or results not to be anticipated, estimated or intended.

There can be no assurance that forward-looking information will prove to be accurate, as actual results

and future events could differ materially from those anticipated in such statements. The Company

undertakes no obligation to update forward-looking information if circumstances or management’s

estimates or opinions should change except as required by applicable securities laws. The reader is

cautioned not to place undue reliance on forward-looking information.

Neither TSX-V nor its Regulation Services Provider (as that term is defined in policies of the TSX-V) accepts

responsibility for the adequacy or accuracy of this release.

6

Figure 4: NiCAN’s Project Locations in Manitoba, Canada