Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NGEX.TO ·

NGEx Drills 1,246.50m at 0.86% CuEq plus 131.00m at 5.09% CuEq including 5.00m at 29.05% CuEq at Lunahuasi

Drill Results

NGEx Minerals Ltd.

2800 – 1055 Dunsmuir Street

Vancouver BC, Canada V7X 1L2

T +1 604 689 7842

F +1 604 689 4250

[email protected]

NGEXminerals.com

NGEx Drills 1,246.50m at 0.86% CuEq plus 131.00m at 5.09% CuEq including

5.00m at 29.05% CuEq at Lunahuasi

February 10, 2026, Vancouver, British Columbia – NGEx Minerals Ltd. (“NGEx”, “NGEx Minerals” or the

“Company”) (TSX: NGEX; OTCQX: NGXXF) is pleased to announce drill results from four holes at the

ongoing Phase 4 drill program at its 100% owned Lunahuasi high-grade copper-gold-silver project in San

Juan, Argentina.

Highlights:

• Drillhole DPDH049 intersected 1,246.50m at 0.86% CuEq from 116.50m, including;

o 13.61m at 6.15% CuEq from 724.49m,

o 7.45m at 15.03% CuEq from 941.45m,

o 3.60m at 26.87% CuEq from 1,003.40m.

• Drillhole DPDH055 intersected 49.00m at 2.29% CuEq from 858.00m, including;

o 2.00m at 19.91% CuEq from 858.00m.

• Drillhole DPDH057 intersected 131.00m at 5.09% CuEq from 424.00m, including;

o 30.00m at 7.91% CuEq from 468.20m,

o 5.00m at 29.05% CuEq from 476.20m,

o 40.20m at 6.09% CuEq from 514.80m.

• Drillhole DPDH060 intersected 32.30m at 4.95% CuEq from 223.00m, including;

o 2.70m at 19.85% CuEq from 245.30m, plus

o 1.80m at 14.17% CuEq from 368.20m.

Wojtek Wodzicki, President and CEO, commented, “These latest results highlight two of the mineralization

types occurring at Lunahuasi, a broad zone of stockwork and disseminated mineralization with an

intersection over a kilometer in length, and very high-grade massive sulphide vein mineralization. Both

styles of mineralization are important at Lunahuasi and demonstrate the size, strength, and optionality of

the mineralized system. The intercept in DPDH057 is an initial test of the “wedge” of untested poten tial

that lies between current drill holes and the surface . The Saturn zone remains completely open between

this intersection and surface which is 400m vertically above. This season’s drilling is helping us to better

understand the size and shape of the high -grade zones and helping to extend and further define the

broader envelope of stockwork and disseminated mineralization, building confidence in our geological

model. We are also expanding the boundaries of Lunahuasi as we continue to extend the mineralized

envelope. With over 17,000m drilled and fifteen holes completed to date in Phase 4, our drill program is

ahead of schedule and achieving the objectives we set out at the beginning of the season. We are now

drilling some exciting step-out and blue-sky exploration holes and look forward to providing regular market

updates as results come in over the next few months.”

Table 1: Significant Intersections

Hole ID From (m) To (m) Length

(m)

Est True

Width (m) Cu % Au g/t Ag g/t CuEq %

DPDH049 116.50 1363.00 1246.50 1247 0.60 0.23 9.9 0.86

incl 609.40 738.10 128.70 77 1.23 0.57 13.6 1.76

and incl 677.00 738.10 61.10 37 1.94 0.70 11.1 2.54

incl 724.49 738.10 13.61 8.2 4.68 1.67 28. 8 6.15

and incl 941.45 948.90 7.45 4.5 13.38 1.62 52.8 15.03

and incl 1003.40 1007.00 3.60 2.2 22.87 2.61 237.6 26.87

and incl 1278.60 1310.50 31.90 19 1.61 0.29 22.5 2.02

DPDH055 196.00 925.00 729.00 729 0.59 0.34 9.4 0.92

incl 196.00 256.40 60.40 30 0.69 1.61 21.1 2.05

incl 248.00 256.40 8.40 4.2 2.81 4.76 79.8 6.99

and incl 365.00 390.00 25.00 13 0.83 0.48 13.6 1.29

and incl 640.00 907.00 267.00 134 0.99 0.32 10.7 1.32

incl 640.00 741.20 101.20 51 1.35 0.40 7.1 1.70

incl 648.50 664.10 15.60 7.8 4.39 1.03 19.4 5.32

and incl 736.80 741.20 4.40 2.2 4.94 1.28 14.4 6.00

and incl 778.00 793.20 15.20 7.6 1.67 0.77 10.9 2.32

and incl 858.00 907.00 49.00 25 1.64 0.51 31.3 2.29

incl 858.00 860.00 2.00 1.0 15.16 2.05 371.0 19.91

incl 876.10 880.50 4.40 2.2 4.69 0.52 12.8 5.19

incl 901.00 907.00 6.00 3.0 1.87 1.78 54.0 3.64

DPDH057 243.00 250.00 7.00 4.5 0.18 2.44 16.1 2.10

plus 424.00 760.00 336.00 336 1.53 1.14 27.6 2.60

incl 424.00 555.00 131.00 84 3.10 2.03 58.2 5.09

incl 424.00 456.35 32.35 21 3.16 1.97 85.6 5.35

incl 450.80 456.35 5.55 3.6 10.18 6.70 160.1 16.47

and incl 468.20 498.20 30.00 19 4.00 4.58 64.5 7.91

incl 476.20 481.20 5.00 3.2 13.08 19.34 212.2 29.05

and incl 514.80 555.00 40.20 26 4.41 1.48 68.8 6.09

incl 514.80 525.00 10.20 6.5 11.48 3.51 172.4 15.56

and incl 629.70 662.00 32.30 21 1.36 1.39 18.8 2.54

incl 644.00 651.40 7.40 4.7 3.29 0.95 26.5 4.22

and incl 657.00 661.10 4.10 2.6 1.29 5.44 42.4 5.63

and incl 708.00 725.00 17.00 11 1.25 1.13 9.5 2.16

incl 708.00 713.00 5.00 3.2 3.00 2.51 20.0 5.00

and incl 753.80 760.00 6.20 4.0 0.99 1.76 12.7 2.38

DPDH060 107.00 124.00 17.00 9.4 1.27 0.94 17.9 2.11

incl 116.30 119.75 3.45 1.9 3.58 2.22 41.4 5.57

plus 223.00 255.30 32.30 18 3.13 2.18 26.5 4.95

incl 223.00 232.00 9.00 5.0 4.72 3.43 30.3 7.49

and incl 245.30 248.00 2.70 1.5 13.89 6.64 127.3 19.85

plus 363.00 372.75 9.75 5.4 2.61 0.83 16.9 3.36

incl 368.20 370.00 1.80 1.0 11.64 2.55 76.0 14.17

plus 474.00 488.50 14.50 8.0 1.99 1.88 23.4 3.57

incl 474.00 479.00 5.00 2.8 3.51 2.98 34.8 5.99

Copper equivalent (CuEq) for drill intersections is calculated based on US$3.00/lb Cu, US$1,500/oz Au and US$18/oz Ag, with 80%

metallurgical recoveries assumed for all metals. The formula is: CuEq % = Cu % + (0.7292 * Au g/t) + (0.0088 * Ag g/t).

Estimated true widths are rounded to the nearest metre for widths over 10m and to the nearest 0.1m for widths less than 10m,

as this better reflects the precision of the estimates. True widths should be regarded as approximate as these are derived from an

estimation that uses a preliminary interpretation of the geological model and are subject to change as more information becomes

available. Intervals greater than 300m are interpreted as bulk disseminated and stockwork mineralization and drilled width is

equal to estimated true width.

DPDH049 targeted the Saturn Zone , intersecting it between 609.40m and 738.10m, including a higher-

grade sub-interval from 677.00m to 738.10m as shown in Table 1. The hole continued to a final depth of

1,487.00m, intersecting continuous disseminated and stockwork mineralization to the west of Saturn

including two very high-grade intervals from 941.45m to 948.90m and 1,003.40m to 1,007.00m.

DPDH055 also targeted the Saturn Zone, 150m vertically below hole DPDH050. The zone was intersected

as a broad interval of mineralization between 640.00m and 907.00m and included several higher -grade

intercepts as shown in Table 1. The Saturn Zone remains completely open below this intersection. This

hole also intersected two shallower mineralized zones from 196.00m to 256.40m and 365.00m to

390.00m. These intercepts may represent southern extension s of the Mars Zone or potentially new

mineralized zones which had not been previously intersected.

DPDH057 was designed to intersect the Saturn zone 250m vertically above the intersection in DPDH049

which it successfully did , intersecting the zone between 424.00m and 555.00m . This broad interval

contains several very high -grade sub-intervals and is one of the shallowest intersections of the Saturn

Zone. The zone remains completely open between this intersection and surface which is 400m vertically

above. The hole continued to a final depth of 799m, through a wide interval of disseminated and

stockwork mineralization cross-cut by several high-grade structures.

DPDH060 targeted an interpreted extension of the Mars Zone to the northeast of DPDH054, successfully

intersecting it between 223.00m and 255.30m and extending it by approximately 70m. The zone remains

open to the north beyond this hole as well as up and down dip.

Phase 4 Progress

To date, over 17,000m have been drilled during Phase 4 with fifteen holes completed and eight underway.

Drill hole targeting has shifted to larger step-outs and test ing new exploration targets , and four of the

eight current holes are over 1,000m deep.

Of the completed holes, two have been drilled into the Jupiter Zone, two into Mars and nine into Saturn.

In addition to the exploration holes, the adit centerline geotechnical hole is being extended in order to

intersect the Jupiter Zone.

An interactive 3D visualization of drill results can be found on the Company website HERE and will be

updated shortly after the release of new drill results.

Table 2: Drillhole Information

Hole ID UTM East UTM North Elev (masl) Azimuth Dip Length

Drilled (m) Drill Status

DPDH048 439,217 6,855,999 4,703 277.4 -55.4 761.0 Complete

DPDH049 439,224 6,855,908 4,742 273.5 -60.6 1,487.0 Complete

DPDH050 439,204 6,855,918 4,742 290.5 -62.0 796.1 Complete

DPDH051 438,851 6,856,236 4,767 157.3 -71.5 790.5 Complete

DPDH052 439,092 6,856,132 4,663 225.6 -47.6 560.4 Complete

DPDH053 439,077 6,856,286 4,655 287.0 -48.5 301.5 Complete

DPDH054 439,299 6,856,194 4,631 289.4 -48.4 383.0 Complete

DPDH055 439,226 6,855,998 4,703 273.5 -68.3 925.0 Complete

DPDH056 439,092 6,856,134 4,663 255.3 -70.0 877.4 Complete

DPDH057 439,203 6,855,918 4,742 280.1 -45.2 799.0 Complete

DPDH058 439,081 6,856,287 4,654 327.9 -67.3 577.0 Complete

DPDH059 438,851 6,856,236 4,768 164.8 -68.7 866.4 Complete

DPDH060 439,297 6,856,195 4,632 304.8 -50.3 488.5 Complete

DPDH061 439,297 6,856,193 4,632 289.1 -54.9 1,101.0 In Progress

DPDH062 439,226 6,855,995 4,702 256.4 -63.8 1,087.0 In Progress

DPDH063 439,222 6,855,907 4,743 259.1 -54.3 1,343.0 In Progress

DPDH064 439,204 6,855,913 4,742 260.3 -46.5 1,136.0 In Progress

DPDH065 439,080 6,856,287 4,655 310.5 -55.5 708.2 Complete

DPDH066 437,052 6,855,746 5,407 066.3 -72.9 819.0 In Progress

DPDH067 438,854 6,856,230 4,768 286.1 -50.6 443.0 In Progress

DPGT004 439,561 6,856,232 4,572 266.2 -11.8 781.2 Complete

Additional assay results will be released once assays are received, analyzed, and confirmed by the

Company.

Qualified Persons and Technical Notes

The scientific and technical disclosure included in this news release have been reviewed and approved by

Bob Carmichael, B.A.Sc., P.Eng. who is the Qualified Person as defined by NI 43 -101. Mr. Carmichael is

Vice President, Exploration for the Company.

Samples were cut at NGEx’s operations base in San Juan, Argentina by Company personnel. Diamond drill

core was sawed and then sampled in maximum 2-meter intervals, stopping at geological boundaries. Core

diameter is a mix of PQ, HQ and NQ depending on the depth of the drill hole. Samples were bagged ,

tagged, and packaged for shipment by truck to the ALS preparation laboratory in Mendoza, Argentina

where they were crushed and a 500g split was pulverized to 85% passing 200 mesh. The prepared sample

splits were sent to the ALS assay laboratory in Lima, Peru for copper, gold and silver assays, and multi -

element ICP. ALS is an accredited laboratory which is independent of the Company. Gold assays were by

fire assay fusion with AAS finish on a 30g sample (Au-AA23). Any samples returning > 10 g/t were then

reanalyzed by fire assay with gravimetric finish on a 30g sample (Au -GRA21). Copper and silver were

assayed by atomic absorption following a 4 -acid digestion. Samples were also analyzed for a suite of 48

elements with ME-MS61 plus mercury and a sequential copper leach analysis was completed on each

sample with copper greater than 500ppm (0.05%) . Sequential copper analysis involves the sequential

leaching of the sample by acid, followed by a cyanide solution. It can be used to differentiate copper

speciation, with copper oxide minerals leachable with acid and secondary copper minerals (enargite,

chalcocite, covellite) leachable by cyanide. The residual copper remaining following the sequential leaches

is typically contained in chalcopyrite and bornite. Copper and gold standards as well as blanks and

duplicates (field, preparation , and analysis) were randomly inserted into the sampling sequence for

Quality Control. On average, 10% of the submitted samples are Quality Control samples. No data quality

problems were indicated by the QA/QC program.

About NGEx Minerals

NGEx Minerals is a copper and gold exploration company based in Canada, focused on exploration of the

Lunahuasi copper-gold-silver project in San Juan Province, Argentina, and the nearby Los Helados copper-

gold project located approximately nine kilometres to the northeast in Chile’s Region III. Both projects are

located within the Vicuña District, which includes the Caserones mine, and the Josemaria and Filo del Sol

deposits.

NGEx owns 100% of Lunahuasi and is the majority partner and operator for the Los Helados project,

subject to a Joint Exploration Agreement with Nippon Caserones Resources LLC, which is the indirect 30%

owner of the operating Caserones open pit copper mine located approximately 17 kilometres north of Los

Helados. Lundin Mining Corporation holds the remaining 70% stake in Caserones.

The Company’s common shares are listed on the TSX under the symbol "NGEX" and also trade on the

OTCQX under the symbol “NGXXF”. NGEx is part of the Lundin Group of Companies.

Additional information relating to NGEx may be obtained or viewed on SEDAR+ at www.sedarplus.ca.

For further information, please contact:

Finlay Heppenstall

VP, Corporate Development & Investor Relations

Tel: +1 (604) 806-3089

[email protected]

Additional Information

Neither the TSX nor its Regulation Services Provider (as that term is defined in the policies of the TSX )

accepts responsibility for the adequacy or accuracy of this news release.

The information contained in this news release was accurate at the time of dissemination but may be

superseded by subsequent news release(s). The Company is under no obligation, nor does it intend to

update or revise the forward-looking information, whether as a result of new information, future events

or otherwise, except as may be required by applicable securities laws.

Cautionary Note Regarding Forward-Looking Statements

Certain statements made and information contained herein in the news release constitutes “forward -looking

information” and “forward-looking statements” within the meaning of applicable securities legislation (collectively,

“forward-looking information”). All statements other than statements of historical facts included in this document

constitute forward -looking information including , but not limited to, statements regarding: the geological

interpretation of the Lunahuasi system including apparent correlations between drill holes and its ultimate size,

strength, and grade distribution ; the nature and timing of the work to be undertaken to advance the Lunahuasi

project, including the timing of larger step-outs and testing of new exploration targets; the timing of drill results; and

the Company’s ability to use information gathered from drilling to date to effectively target and drill in future

campaigns. Generally, this forward -looking information can frequently, but not always, be identified by use of

forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled",

"estimates", "forecasts", "intends", “projects”, “budgets”, “assumes”, “strategy”, “objectives”, “potential”,

“possible”, "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or

statements that certain actions, events, conditions or results “will”, "may", "could", "would", “should”, "might" or

"will be taken", "will occur" or "will be achieved" or the negative connotations thereof .

Forward-looking information is necessarily based upon various estimates and assumptions including, without

limitation, the expectations and beliefs of management with respect to the nature, scope and timing of the work to

be undertaken to advance the Lunahuasi Project. Although the Company believes that these factors and expectations

are reasonable as at the date of this document , in light of management’s experience and perception of current

conditions and expected developments, these statements are inherently subject to significant business, economic and

competitive uncertainties and contingencies. Known and unknown risks, uncertainties and other factors may cause

actual results or events to differ materially from those anticipated in such forward -looking statements and undue

reliance should not be placed on such statements and information. Such factors include, without limitation: the

emergence or intensification of infectious diseases, such as COVID 19, and the risk that such an occurrence globally,

or in the Company’s operating jurisdictions and/or at its project sites in particular, could impact the Company’s ability

to carry out the program and could cause the program to be shut down ; estimations of costs, and permitting time

lines; ability to obtain environmental permits, surface rights and property interests in a timely manner; currency

exchange rate fluctuations; requirements for additional capital; changes in the Company’s share pr ice; changes to

government regulation of mining activities; environmental risks; unanticipated reclamation or remediation expenses;

title disputes or claims; limitations on insurance coverage, fluctuations in the current price of and demand for

commodities, particularly gold prices, as they are fluctuating currently due to market volatility ; material adverse

changes in general business, government and economic conditions in the Company’s operating jurisdictions,

particularly Argentina; the availability of financing if and when needed on reasonable terms; risks related to material

labour disputes, accidents, or failure of plant or equipment; there may be other factors that cause results not to be

as anticipated, estimated, or intended, including those set out in the Company’s annual information form and annual

management discussion and analysis for the year ended December 31, 202 4, which are available on the Company’s

website and SEDAR+ at www.sedarplus.ca under the Company’s profile.

The forward-looking information contained in this news release is based on information available to the Company as

at the date of this news release. Except as required under applicable securities legislation, the Company does not

undertake any obligation to publicly update and/or revise any of the forward-looking information included, whether

as a result of additional information, future events and/or otherwise. Forward -looking information is provided for

the purpose of providing information about managemen t's current expectations and plans and allowing investors

and others to get a better understanding of the Company's operating environment. Although the Company has

attempted to identify important factors that would cause actual results to differ materially from those contained in

forward-looking information, there may be other factors that cause results not to be as anticipated, estimated, or

intended. There can be no assurance that such statements will prove to be accurate, as actual results and future

events could differ materially from those anticipated in such statements. All the forward -looking information

contained in this document is qualified by these cautionary statements. Readers are cautioned not to place undue

reliance on forward-looking information due to the inherent uncertainty thereof.

Cautionary Note to U.S. Readers

Information concerning the mineral properties of the Company contained in this news release has been prepared in

accordance with the requirements of Canadian securities laws, which differ in material respects from the

requirements of securities laws of the United States applicable to U.S. companies subject to the reporting and

disclosure requirements of the United States Securities and Exchange Commission.

FEBRUARY 2026

Lunahuasi Project

Plan View

Overburden

Alluvial

Colluvial

Lithology

Silicified structural zone

Volcaniclasc sequence (rhyolite tuff, breccia)

Volcaniclasc sequence (andesite, sandstone, conglomerate)

Quartz diorite porphyry

Access track

Length m @ CuEq %

Cu % / Au gpt / Ag gpt

NORTH

Phase 1, 2, 3 Holes

Phase 4 Holes

0 1000m

DPDH049

DPDH055

DPDH057

DPDH060

437500E

6856000N

2.0 - 4.0 %

4.0 - 10.0 %

> 10.0 %

CuEq %

1.0 - 2.0 %

Jupiter

Mars

Saturn

32.3m @ 4.95

3.13/2.18/26.5

131.0m @ 5.09

3.10/2.03/58.2

61.1m @ 2.54

1.94/0.70/11.1

60.4m @ 2.05

0.69/1.61/21.1