Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NG.TO ·

NOVAGOLD’s 2025 DONLIN GOLD DRILL PROGRAM RETURNS HIGH-GRADE GOLD INTERCEPTS, STRENGTHENS RESOURCE CONVERSION, AND SUPPORTS BANKABLE FEASIBILITY STUDY PROGRESSION  Exceptional Drill Results: Drill results confirm consistent mineralization across multiple zones,

Drill Results Economic Studies

NEWS RELEASE

 www.novagold.com

Page | 1

NOVAGOLD’s 2025 DONLIN GOLD DRILL PROGRAM RETURNS

HIGH-GRADE GOLD INTERCEPTS,

STRENGTHENS RESOURCE CONVERSION, AND SUPPORTS

BANKABLE FEASIBILITY STUDY PROGRESSION

 Exceptional Drill Results: Drill results confirm consistent mineralization across multiple zones,

including standout intervals up to 23.49 g/t gold, reinforcing Donlin Gold’s position as one of the

most significant gold development projects globally.

 Strategic Resource Conversion: Following the landmark $1 billion transaction with Paulson Advisers

LLC (“Paulson”), the 2025 drill program pivoted to focus on conversion of resources and geotechnical

work to support the Bankable Feasibility Study (BFS) — bringing new scale and momentum to the

project.

 Donlin Gold BFS Bids: The Request for Proposal (RFP) for the BFS was issued to top-tier qualified

engineering firms, with selection expected in the fourth quarter of 2025.

September 8, 2025 – Vancouver, British Columbia – NOVAGOLD RESOURCES INC. (“NOVAGOLD” or

the “Company”) (NYSE American, TSX: NG) is pleased to report that with a focus on resource conversion as

well as growth, the 2025 Donlin Gold drill program has returned multiple high-grade gold intercepts that

achieve both objectives. The program supports the next phase of technical work, reinforcing the renewal

of momentum toward a BFS of what would be, at present estimates of scale and grade, one of America’s

largest gold mines — offering shareholders exposure to an outstanding gold asset in one of the world’s

most stable and mining-friendly jurisdictions.

With a dedicated team of up to 80 locally hired personnel and contractors operating on-site, the 2025 drill

program has successfully intersected high-grade gold mineralization across multiple zones. These results

provide critical data for engineering, mine planning, and resource modelling, marking a pivotal milestone

in the Company’s path toward delivering a BFS.

The top five intervals from the in-pit exploration drilling include:

 DC25-2252 intersected 51.90 m grading 3.77 g/t gold starting at 305.60 m drilled depth. The true

width of mineralization across this interval is estimated to be 47 m.

 DC25-2258 intersected 7.35 m grading 23.49 g/t gold starting at 525.34 m drilled depth. The true

width of mineralization across this interval is estimated to be 45 m.

 DC25-2253 intersected 16.33 m grading 6.57 g/t gold starting at 330.91 m drilled depth, including a

sub-interval of 4.52 m grading 14.02 g/t starting at 340.19 m drilled depth. The true widths of

mineralization across this interval and sub-interval are estimated to be 14 m and 4 m, respectively.

 DC25-2257 intersected 9.12 m grading 8.32 g/t gold starting at 393.34 m drilled depth. The true width

of mineralization across this interval is estimated to be 7 m.

 DC25-2253 intersected 6.37 m grading 10.29 g/t gold starting at 315.01 m drilled depth. The true

width of mineralization across this interval is estimated to be 6 m.

“It is most rewarding to see what we believe are such great returns on our investment to date in the 2025

Donlin Gold drill program”, said Greg Lang, NOVAGOLD’s President and CEO. “The consistency and

strength of the high-grade gold intercepts continue to validate the exceptional quality of this asset. These

results not only reinforce Donlin Gold’s standing as one of the most responsible and significant

development-stage gold projects in the world, but also provide critical data needed to advance our

 www.novagold.com

Page | 2

geological modelling and engineering work. We look forward to receiving the BFS bids from top

engineering firms and announcing the selected lead for the BFS work in the coming months — an

essential milestone in unlocking the full value of the project for our shareholders and the communities in

which we serve.”

Figure 1 Donlin Gold Drill Hole Collar Locations

The figure shows the 2025 program grid and in-pit exploration drilling, highlighting those for which assays

are reported per the tables in the Appendix, and the assays that remain pending. Additionally, the planned

drill holes highlighted in orange represent the in -pit geotechnical drilling that will be completed in the

coming weeks. The completed drill holes, drill hole orientations, depths and significant intervals are shown

at the end of this release in Tables 1 and 2 of the Appendix.

Following the transformative $1 billion transaction with Paulson to acquire 50% of the Donlin Gold Project

which closed on June 3 (see the news release titled, “NOVAGOLD and Paulson Advisers Complete $1

Billion Acquisition of Barrick Mining's 50% Interest in Donlin Gold - NOVAGOLD RESOURCES INC.”),

NOVAGOLD and Paulson (the “Owners”) pivoted and expanded the drill program to focus on resource

conversion and growth, in-pit geotechnical drilling to improve modelling for long-term stability and mine

design, and material sites for construction of the access road from the upriver port to Donlin Gold.

Drill Program Contributes to Advancing the Donlin Gold Project

The 2025 Donlin Gold drill program was expanded to support a new resource model and the advancement

of the BFS, reinforcing the project’s long-term development strategy. This year’s program primarily focused

on three activities: 1. grid drilling to further develop the modifying factors and input parameters and

assumptions for future mine planning ; 2. in-pit exploration drilling focused on enhancing geological

modelling and supporting resource conversion; and 3. in-pit geotechnical drilling to improve modelling for

NEWS RELEASE

 www.novagold.com

Page | 3

long-term stability and mine design, and material sites for construction of the access road from the upriver

port to Donlin Gold — workstreams required for the BFS.

To date, the program has included the completion of 19 grid infill holes in the East American Creek Magnetic

Anomaly ( ACMA) grid deposit totaling 5,079 meters, aimed at verifying short scale continuity of

mineralization and improving resource confidence and key inputs for mine planning.

In-pit exploration drilling comprised 24 holes totaling 10,370 meters, targeting areas of the pit containing

Inferred Resources with the potential to be converted to Indicated Resources.

An additional 30 holes totaling 3,000 meters of geotechnical drilling was added to the program this year

contributing to pit wall stability analysis and mine design, including drilling on the material sites for

construction of the access road from the Jungjuk port on the Kuskokwim River to Donlin Gold. All drilling

was conducted using core methods to ensure precision and high-quality geological data. This expansion

occurred to enhance geotechnical modelling and infrastructure planning, further strengthening the

project’s foundation.

NOVAGOLD anticipates releasing additional drill results in the coming months, which will provide further

insight into the deposit’s potential and further support the development of Donlin Gold as a premier gold

asset in Alaska. Select activities originally scheduled for 2025 were redirected to support the BFS, with no

material impact anticipated on Donlin Gold’s budgeted expenditures.

Community Engagement

The 2025 drill program at Donlin Gold and other ongoing project activities continue to reflect NOVAGOLD’s

deep commitment to responsible development and meaningful collaboration with Alaska Native

communities. As part of this year’s expanded operations, locals from 1 9 Yukon-Kuskokwim (Y-K) villages

were hired to support drilling activities, logistics, and environmental monitoring — underscoring the

project’s role as a central economic driver. Engagement efforts extended across the Y-K region, with Donlin

Gold maintaining active engagement with village corporations, tribal councils, and regional organizations

to ensure transparent communication and shared benefits. These initiatives align with NOVAGOLD’s broader

sustainability goals, which prioritize environmental responsibility and the preservation of traditional ways

of life.

Donlin Gold’s engagement efforts span over 60 communities in the Y -K region, with outreach in

collaboration with Calista Corporation and The Kuskokwim Corporation. Activities and interactions include

direct engagements with stakeholders, supporting and participating in cultural events, forming partnerships

and creating regional programs in the key focus areas of health and safety, environment, education, and

cultural preservation . Guided by tr ansparency, respect, and long -term partnership , the Company is

committed to advancing responsible development that creates long-lasting value for all stakeholders.

By integrating traditional knowledge, respecting subsistence practices, and maintaining open lines of

communication, Donlin Gold is setting a benchmark for responsible resource development in Alaska. These

efforts strengthen trust while sharing the project’s benefits broadly.

QA/QC Procedures

The QA/QC procedures for the 2025 Donlin Gold project drill program and sampling protocol were

developed and managed by Donlin Gold and overseen by NOVAGOLD. The chain of custody from the drill

 www.novagold.com

Page | 4

site to the sample preparation facility was continuously monitored. All samples are HQ -diameter core.

Approximately 97% core recovery has been achieved during the 2025 drill program. Core was logged, cut,

and sampled at site by Donlin Gold employees. Sampl es were primarily collected on one - to two-meter

lengths. Sampled half-core was crushed and pulverized in Bureau Veritas’ sample preparation facilities in

Fairbanks, Alaska. Pulps were sent to Bureau Veritas’ lab in Vancouver, British Columbia for gold assays and

multi-element analysis. The pulps were then sent to an ALS Limited lab in Vancouver, British Columbia for

CNL/LECO analysis. Quality control samples were inserted (standards at 5% of primary samples, blanks at

5% of primary samples and duplicates at 2.5% of primary samples) into each batch of sampl es. The review

of the quality control samples did not indicate any bias or error. Out of bounds quality control samples were

handled with appropriate reruns and investigations. There are no known factors that would materially affect

the accuracy or reliability of the drill program data referred to in this release.

Downhole directional surveys were completed on all reported completed holes by Boart Longyear drill

operators, and collar surveys were completed by Donlin Gold staff under the supervision of Professional

Licensed Surveyors from Brice Engineering LLC.

Each of Bureau Veritas, ALS Limited, Boart Longyear, and Brice Engineering LLC are independent of Donlin

Gold and NOVAGOLD.

Scientific and Technical Information

NOVAGOLD is a registrant with the SEC and is reporting its Mineral Resources and Mineral Reserves in

accordance with Subpart 229.1300 of Regulation S -K – Disclosure by Registrants Engaged in Mining

Operations (“S -K 1300”) as of November 30, 2021. While the S -K 1300 rules are similar to National

Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) rules in Canada, they are not

identical and therefore two reports have been produced for the Donlin Gold project.

In 2020, NOVAGOLD engaged Wood Canada Limited (“Wood”) to update the Second Updated Feasibility

Study on Donlin Gold completed in 2011 (the “2011 Technical Report”). Th is update resulted in a report

titled “NI 43-101 Technical Report on the Donlin Gold Project, Alaska, USA” with an effective date of June 1,

2021 (the “2021 Technical Report”). In 2021, NOVAGOLD also engaged Wood to prepare a Donlin Gold

technical report summary in accordance with S-K 1300. The resulting report is titled “S -K 1300 Technical

Report Summary on the Donlin Gold Project, Alaska, USA” (“S -K 1300 Technical Report Summary”), dated

November 30, 2021. Wood incorporated 2020 costs and gold price guidance to meet NOVAGOLD’s

reporting requirements. The resultant 2021 Technical Report and S -K 1300 Technical Report Summary

showed no material change to the previously reported mineral resources or mineral reserves.

Certain scientific and technical information contained herein with respect to the Donlin Gold project is

derived from the 2021 Technical Report and the S -K 1300 Technical Report Summary. Henry Kim, P.Geo.,

Senior Resource Geologist, Wood Canada Limited; Mike Woloschuk, P.Eng., VP Global Business

Development & Consulting, Wood Group USA, Inc.; and Kirk Hanson, MBA, P.E., Technical Director, Open

Pit Mining, Wood Group USA, Inc. are the Qu alified Persons responsible for the preparation of the 2021

Technical Report, and each is an independent Qualified Person as defined by NI 43-101 and S-K 1300.

Paul Chilson, P.E., Manager of Mine Engineering for NOVAGOLD and a Qualified Person under NI 43 -101

and S-K 1300, has approved and verified the scientific and technical information related to the 2025 Donlin

Gold project drill programs, the 2021 Technical Report and the S -K 1300 Technical Report Summary

contained in this media release. To verify the information related to the drilling programs, he has visited the

property in the past year; discussed logging, sampling, and sample shipping processes with responsible site

NEWS RELEASE

 www.novagold.com

Page | 5

staff; discussed and reviewed assay and QA/QC results with responsible personnel; and reviewed supporting

documentation, including drill hole location and orientation and significant assay interval calculations.

About NOVAGOLD

NOVAGOLD is a well-financed precious metals company focused on the development of the Donlin Gold

project in Alaska, one of the safest mining jurisdictions in the world. With approximately 39 million

ounces of gold in the Measured and Indicated Mineral Resource categories (541 million tonnes at an

average grade of approximately 2.24 grams per tonne, in the Measured and Indicated Mineral Resource

categories on a 100% basis)1, inclusive of Proven and Probable Mineral Reserves, the Donlin Gold project

is regarded to be one of the largest, highest-grade, and most prospective known open-pit gold deposits

in the world. According to the 2021 Technical Report and the S-K 1300 Technical Report Summary, the

Donlin Gold project is expected to produce an average of more than one million ounces per year over a

27-year mine life on a 100% basis once in production.

NOVAGOLD Contacts:

Mélanie Hennessey

Vice President, Corporate Communications

Frank Gagnon

Manager, Investor Relations

604-669-6227 or 1-866-669-6227

[email protected]

www.novagold.com

Cautionary Note Regarding Forward-Looking Statements

This media release includes certain “forward -looking information” and “forward -looking statements” (collectively “forward-looking statements”) within the

meaning of applicable securities legislation, including the United States Private Securities Litigatio n Reform Act of 1995. Forward- looking statements are

frequently, but not always, identified by words such as “expects”, “continue”, “ongoing”, “anticipates”, “believes”, “intends”, “estimates”, “potential”, “possible”,

and similar expressions, or statements that events, conditions, or results “will”, “may”, “could”, “would” or “should” occur or be achieved. Forward-looking

statements contained in this media release are based on a number of material assumptions, including but not limited to the following, which could prove to

be significantly incorrect: our ability to achieve production at Donlin Gold; the cost estimates and assumptions contained in the 2021 Technical Report and

the S-K 1300 Technical Report Summary; estimated metal pricing, metallurgy, mineability, marketability and operating and capital costs, together with other

assumptions underlying our resource and reserve estimates; our expected ability to develop adequate infrastructure and that t he cost of doi ng so will be

reasonable; assumptions that all necessary permits and governmental approvals will be obtained and the timing of such approvals; assumptions made in the

interpretation of drill results, the geology, grade and continuity of our mineral deposits; our expectations regarding demand for equipment, skilled labor and

services needed for exploration and development of mineral properties; our ability to improve our ESG initiatives an d goals; and that our activities will not

be adversely disrupted or impeded by development, operating or regulatory risks. Forward-looking statements are necessarily based on several opinions,

estimates and assumptions that management of NOVAGOLD considere d appropriate and reasonable as of the date such statements are made, are subject

to known and unknown risks, uncertainties, assumptions, and other factors that may cause the actual results, activity, perfor mance, or achievements to be

materially different from those expressed or implied by such forward -looking statements. All statements, other than statements of historical fact, included

herein are forward-looking statements. These forward -looking statements include statements regarding plans for and the estimated timing of the Donlin

Gold BFS; our goals and planned activities for 2025; ongoing support provided to key stakeholders including Native Corporation landowners; the potential

development and construction of the Donlin Gold project; the timing and ability for the Donlin Gold project to hit critical milestones; the ability for the Donlin

1 Donlin Gold data as per the report titled “NI 43-101 Technical Report on the Donlin Gold project, Alaska, USA” with an effective date of June 1, 2021 (the “2021 Technical Report”)

and the report titled “S-K 1300 Technical Report Summary on the Donlin Gold project, Alaska, USA” (the “S-K 1300 Technical Report Summary”), dated November 30, 2021. Donlin

Gold possesses Measured Resources of approximately 8 Mt grading 2.52 g/t and Indicated Resources of approximately 534 Mt grading 2.24 g/t, each on a 100% basis and inclusive

of Mineral Reserves, of which approximately 5 Mt of Measured Resources and approximately 320 Mt of Indicated Resources inclus ive of Reserves is currently attributable to

NOVAGOLD through its 60% ownership interest in Donlin Gold LLC. Exclusi ve of Mineral Reserves, Donlin Gold possesses Measured Resources of approximately 0.9 Mt grading

2.23 g/t and Indicated Resources of approximately 69 Mt grading 2.44 g/t, of which approximately 0.5 Mt of Measured Resources and approximately 42 Mt of Indicated Resources

exclusive of Mineral Reserves is currently attributable to NOVAGOLD. Donlin Gold possesses Proven Reserves of approximately 8 Mt grading 2.32 g/t and Probable Reserves of

approximately 497 Mt grading 2.08 g/t, each on a 100% basis, of which approximately 5 Mt of Proven Reserves and approximately 298 Mt of Probable Reserves is attributable to

NOVAGOLD. Mineral Reserves and Resources have been estimated in accordance with NI 43-101 and S-K 1300.

 www.novagold.com

Page | 6

Gold development project to hit the anticipated projections; perceived merit of properties; mineral reserve and mineral resource estimates; plans to continue

to advance the Donlin Gold project safely, responsibly and to sustainably generate value for our stakeholders; continued cooperation between the Owners of

Donlin Gold LLC to advance the project; the Company’s ability to deliver on its strategy with the Donlin Gold project, increasing the value of the project; the

success of the strategic mine plan for the Donlin Gold project; the success of the Donlin Gold community relations plan; the anticipated outcome of exploration

drilling at the Donlin Gold project and the timing thereof; and the completion of test work and modeling and the timing thereof, including expected production

and mine life. In addition, any statement that refers to expectations, intentions, projections or other characterizations of future events or circumstances are

forward-looking statements. Forward -looking statements are not historical facts but instead represent the expectations of NOVAGOLD management’s

estimates and projections regarding future events or circumstances on the date the statements are made. Important factors that cou ld cause actual results

to differ materially from expectations include the need to obtain additional permits and governmental approvals; the timing and likelihood of obtaining and

maintaining permits necessary to construct and operate; the need for additional financing to complete an updated feasibility study and to explore and develop

properties; availability of financing in the debt and capital markets; disease pandemics; uncertainties involved in the interpretation of drill results and

geological tests and the estimation of reserves and resources; changes in mineral production performance, explo itation and exploration successes; changes

in national and local government legislation, taxation, controls or regulations and/or changes in the administration of laws, policies and practices,

expropriation or nationalization of property and political or economic developments in the United Sta tes or Canada; the need for continued cooperation

between the owners of Donlin Gold LLC to advance the project; the need for cooperation of government agencies and Native groups in the development and

operation of properties; risks of construction and mining projects such as accidents, equipment breakdowns, bad weather, disease pandemics, non-compliance

with environmental and permit requirements, unanticipated variation in geological structures, ore grades or recovery rates; unexpected cost increases, which

could include significant increases in estimated capital and operating costs; fluctuations in metal prices and currency excha nge rates; whether or when a

positive construction decision will be made regarding the Donlin Gold project; and other risks and uncertainties disclosed in NOVAGOLD’s most recent reports

on Forms 10 -K and 10 -Q, particularly the “Risk Factors” sections of those reports and other documents filed by NOVAGOLD with applicable securities

regulatory authorities from time to time. Copies of these filings may be obtained by visiting NOVAGOLD’s website at www.novagold.com, or the SEC’s website

at www.sec.gov, or on SEDAR+ at www.sedarplus.ca. The forward-looking statements contained herein reflect the beliefs, opinions and projections of

NOVAGOLD on the date the statements are made. NOVAGOLD assumes no obligation to update the forward -looking statements of beliefs, opinions,

projections, or other factors, should they change, except as required by law.

APPENDIX

TABLE 1

Drill Hole Orientations* and Depths

Hole Azimuth (°) Inclination (°) Depth (m)

DC25-2231 333 62 252.14

DC25-2232 335 60 263.22

DC25-2234 332 62 247.16

DC25-2235 333 62 248.68

DC25-2236 332 61 239.32

DC25-2237 332 61 250.40

DC25-2238 332 59 230.05

DC25-2239 334 56 239.09

DC25-2241 333 59 88.25

DC25-2242 332 61 246.88

DC25-2243 333 60 254.57

DC25-2244 334 60 260.13

DC25-2245 333 61 248.30

DC25-2246 333 62 251.14

DC25-2247 334 59 236.65

DC25-2248 332 61 239.13

DC25-2249 333 61 236.88

DC25-2250 335 56 550.39

DC25-2251 330 62 244.48

DC25-2252 318 62 427.32

DC25-2253 333 71 521.51

DC25-2254 312 60 424.80

DC25-2255 313 70 423.98

NEWS RELEASE

 www.novagold.com

Page | 7

Hole Azimuth (°) Inclination (°) Depth (m)

DC25-2256 332 76 548.84

DC25-2257 315 75 437.13

DC25-2258 308 60 538.04

DC25-2259 318 74 462.47

DC25-2260 313 71 427.84

DC25-2261 307 61 594.56

DC25-2262 316 69 440.75

DC25-2263 304 71 416.34

DC25-2264 317 73 457.77

DC25-2265 310 65 548.35

DC25-2266 314 68 496.09

DC25-2267 312 64 498.46

DC25-2268 300 66 226.99

DC25-2269 318 64 368.20

DC25-2270 304 61 168.76

DC25-2271 305 60 546.62

DC25-2272 314 70 237.38

DC25-2273 316 64 325.20

DC25-2274 303 57 257.70

DC25-2276 314 74 479.13

* Note that azimuth and inclination values vary as each hole progresses. The stated values are hole

averages, rounded to the nearest degree.

TABLE 2

2025 Donlin Gold Significant Assay Intervals

Hole ID Domain

From

(Meters)

To

(Meters)

Length

(Meters)

Au Grade

(Au g/t)

DC25-2231 ACMA 26.06 35.30 9.24 2.12

DC25-2231 97.88 103.99 6.11 5.12

DC25-2231 118.60 145.69 27.09 3.21

DC25-2231 155.87 181.71 25.84 3.88

DC25-2231 197.01 213.07 16.06 3.87

DC25-2231 TOTAL 84.34 3.56

DC25-2232 ACMA 73.52 78.73 5.21 5.63

DC25-2232 138.99 149.70 10.71 4.61

DC25-2232 154.22 164.50 10.28 2.01

DC25-2232 179.90 199.36 19.46 6.80

including 189.62 197.44 7.82 11.62

DC25-2232 203.83 207.46 3.63 1.43

DC25-2232 239.67 243.43 3.76 1.71

DC25-2232 247.70 252.93 5.23 5.91

DC25-2232 TOTAL 58.28 4.70

 www.novagold.com

Page | 8

Hole ID Domain

From

(Meters)

To

(Meters)

Length

(Meters)

Au Grade

(Au g/t)

DC25-2234 ACMA 70.46 77.90 7.44 4.75

DC25-2234 117.13 120.45 3.32 6.05

DC25-2234 132.09 166.60 34.51 5.14

including 144.85 148.93 4.08 10.18

DC25-2234 180.92 184.33 3.41 2.36

DC25-2234 232.05 241.86 9.81 4.15

DC25-2234 TOTAL 58.49 4.82

DC25-2235 ACMA 17.05 21.13 4.08 2.20

DC25-2235 97.47 105.96 8.49 1.60

DC25-2235 116.13 143.05 26.92 3.22

DC25-2235 148.65 162.44 13.79 2.21

DC25-2235 167.23 173.43 6.20 4.78

DC25-2235 192.27 220.88 28.61 2.72

DC25-2235 TOTAL 88.09 2.81

DC25-2236 ACMA 93.34 96.55 3.21 9.19

DC25-2236 108.62 134.57 25.95 2.57

DC25-2236 149.38 153.87 4.49 10.44

DC25-2236 200.95 208.70 7.75 2.62

DC25-2236 TOTAL 41.40 3.95

DC25-2237 ACMA 30.19 55.51 25.32 4.18

DC25-2237 67.95 74.55 6.60 3.31

DC25-2237 105.44 114.30 8.86 3.63

DC25-2237 125.50 153.60 28.10 4.56

DC25-2237 194.66 198.60 3.94 3.74

DC25-2237 218.69 228.12 9.43 1.64

DC25-2237 TOTAL 82.25 3.87

DC25-2238 ACMA 110.07 114.00 3.93 2.85

DC25-2238 123.18 126.98 3.80 2.50

DC25-2238 132.45 139.14 6.69 2.12

DC25-2238 177.32 187.60 10.28 2.77

DC25-2238 TOTAL 24.70 2.56

DC25-2239 ACMA 33.72 44.72 11.00 5.33

DC25-2239 116.38 147.47 31.09 5.05

DC25-2239 158.63 161.83 3.20 1.19

DC25-2239 172.49 179.74 7.25 3.56

DC25-2239 200.04 209.18 9.14 3.84

DC25-2239 215.20 243.54 28.34 1.29

DC25-2239 TOTAL 90.02 3.52

DC25-2241 ACMA 29.67 33.96 4.29 5.22

DC25-2241 114.64 143.70 29.06 6.13

including 136.40 142.39 5.99 21.33