Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NEXM.V ·

Premium Nickel Reports Assays from Selebi North Underground Drilling 22.00 metres of 1.74% NiEq (1.22% Ni; 0.89% Cu; 0.06% Co)

Drill Results

Premium Nickel Reports Assays from Selebi

North Underground Drilling

22.00 metres of 1.74% NiEq (1.22% Ni; 0.89% Cu; 0.06% Co)

Toronto, Ontario--(Newsfile Corp. - November 27, 2023) -

Premium Nickel Resources Ltd. (TSXV:

PNRL) (OTCQX: PNRLF) ("PNRL" or the "Company")

is pleased to report additional assay results

from drilling at its past-producing nickel-copper-cobalt sulphide ("

Ni-Cu-Co

") Selebi North underground

("

SNUG

") mine in Botswana. Results have been previously released for six holes (see news release

dated November 14, 2023 and entitled

"Premium Nickel Resources Ltd. Reports Initial Assays from

Selebi North Underground Drilling in Botswana"

), and results for a further six holes are released herein.

Highlights and details of the assay results are shown below along with accompanying visuals via

Figure

1, Figure 2, Figure 3

. Drill core photos for recent holes drilled with assays pending that are not included

in the six holes reported herein are accessible by

Clicking Here

. All drill core photos released to date

can be found on the website at

https://premiumnickelresources.com

. To view the 3D modeling, please

visit the following link

https://vrify.com/decks/14741

.

Highlights include:

SNUG-23-028 (South Limb): 10.75 metres of 1.90% NiEq (1.15% Ni; 1.40% Cu; 0.06% Co)

and 13.50 metres of 1.86% NiEq (1.34% Ni; 0.84% Cu; 0.07% Co)

SNUG-23-032 (N2 Limb): 22.00 metres of 1.74% NiEq (1.22% Ni; 0.89% Cu; 0.06% Co)

including 13.45 metres of 2.19% NiEq (1.52% Ni; 1.17% Cu; 0.07% Co)

Keith Morrison, CEO of PNRL, commented:

"Our underground drilling at Selebi North continues at

higher productivity rates than anticipated. Recent drilling results confirm that the legacy fold pattern

identified in the mine (South Limb, N2 Limb and N3 Limb) continues beyond the historic South

African Mineral Resource Committee ("

SAMREC

") resource block model. We have intercepts of

thicker remobilized conductive massive sulphide mineralization associated with these folds. The

combination of fold/fault structures and high electrical conductivity will provide effective targeting for

following this higher-grade mineralization both inside and outside the legacy SAMREC resource."

The objective of these holes is to define mineralization down plunge of the existing workings that will be

used to complete a Mineral Resource Estimation ("

MRE

") prepared in accordance with National

Instrument 43-101 -

Standards of Disclosure for Mineral Projects

("

NI 43-101

"). Assay results are given

below in Table 1 and hole collar details are given in Table 2. Figures 1 and 2 show the location of holes

relative to the historic resource and underground infrastructure.

Table 1: Assay Results Selebi North Deposit

Hole-ID

From

(m)

To

(m)

*Length

(m)

Ni

(%)

Cu

(%)

Co

(%)

Limb

**NiEq

(%)

SNUG-23-015

141.60

152.05

10.45

0.69

0.58

0.04

N2

1.03

incl.

141.60

142.15

0.55

1.38

0.57

0.07

N2

1.78

and

144.90

148.20

3.30

1.44

0.46

0.08

N2

1.79

and

149.00

152.05

3.05

0.35

1.30

0.02

N2

0.98

SNUG-23-015

309.55

317.20

7.65

0.53

0.30

0.04

N3

0.74

incl.

309.55

310.80

1.25

2.09

0.30

0.10

N3

2.42

and

316.25

317.20

0.95

0.90

1.13

0.12

N3

1.64

SNUG-23-015

401.40

404.25

2.85

0.53

0.35

0.03

N3

0.76

SNUG-23-026

176.75

184.60

7.85

0.85

0.53

0.05

N2

1.18

incl.

177.00

180.90

3.90

1.13

0.71

0.06

N2

1.57

SNUG-23-026

325.10

329.20

4.10

1.52

3.65

0.07

N3

3.31

incl.

325.10

327.95

2.85

0.89

5.09

0.05

N3

3.31

SNUG-23-026

397.80

399.45

1.65

0.29

0.14

0.04

N3

0.43

SNUG-23-026

415.00

417.30

2.30

1.59

1.55

0.07

N3

2.43

SNUG-23-028

168.05

178.00

9.95

0.62

1.47

0.03

SL

1.34

incl.

168.05

171.20

3.15

0.64

2.54

0.03

SL

1.85

and

175.35

178.00

2.65

1.04

1.54

0.05

SL

1.82

SNUG-23-028

184.25

187.80

3.55

1.40

0.54

0.07

SL

1.77

SNUG-23-028

194.60

205.35

10.75

1.15

1.40

0.06

SL

1.90

SNUG-23-028

210.70

211.75

1.05

2.07

3.76

0.11

SL

3.99

SNUG-23-028

215.00

228.50

13.50

1.34

0.84

0.07

SL

1.86

incl.

222.20

228.50

6.30

1.89

0.48

0.10

SL

2.30

SNUG-23-030

287.80

289.35

1.55

2.05

2.03

0.11

N3

3.18

SNUG-23-031

131.25

132.15

0.90

1.19

0.72

0.06

SL

1.64

SNUG-23-031

148.45

154.85

6.40

0.64

0.79

0.03

SL

1.07

incl.

151.30

154.85

3.55

0.97

1.34

0.05

SL

1.68

SNUG-23-032

170.90

171.30

0.40

1.65

0.42

0.08

N2

1.99

SNUG-23-032

180.85

182.10

1.25

2.30

0.19

0.11

N2

2.59

SNUG-23-032

186.00

208.00

22.00

1.22

0.89

0.06

N2

1.74

incl.

192.55

206.00

13.45

1.52

1.17

0.07

N2

2.19

SNUG-23-032

221.75

222.40

0.65

1.44

1.10

0.07

N2

2.07

SNUG-23-032

443.95

444.20

0.25

1.63

1.39

0.10

N3

2.45

Hole-ID

From

(m)

To

(m)

*Length

(m)

Ni

(%)

Cu

(%)

Co

(%)

Limb

**NiEq

(%)

*Length refers to drillhole length and not true width.

**NiEq was calculated assuming a price of $US 8.05/lb for Ni, $US 3.67/lb for Cu and $US 15.16/lb for cobalt with no adjustments for recoveries and

payabilities.

Table 2: Drill Collar Information Selebi North Deposit

HOLE ID

Mine

East

Mine

North

Elevation

Dip

Mine

Azimuth

Hole

Length

Comment

SNUG-23-015

35089.3

84761.4

-52.4

-37.4

224.4

523.73

Rig #1 935mL

SNUG-23-026

35083.5

84840.7

-7.8

-33.7

223.2

464.19

Rig #2 880mL

SNUG-23-028

35094.4

84759.3

-52.0

-25.4

160.2

425.40

Rig #1 935mL

SNUG-23-030

34918.9

84907.2

-8.2

-32.7

243.1

320.40

Rig #3 895mL

SNUG-23-031

35095.1

84759.6

-51.5

-18.9

148.9

191.70

Rig #1 935mL

SNUG-23-032

35081.5

84843.4

-9.0

-28.4

260.1

479.76

Rig #2 880mL

The various mineralized zones have been historically mined and subsequently named N2 Limb, N3 Limb

and South Limb to demarcate their location on the folded mineralized horizon.

At the South and N2 Limbs, the Selebi North mineralization is hosted in an amphibolite that has been

tightly folded and mineralization is generally thickest in the embayments and noses of the folds. The N3

Limb mineralization has historically been Ni-Cu-Co sulphides contained solely within a gneissic

package.

The underground drill program will be carried out from seven drill bays. Three drill rigs are currently

operating from drill bays on the 880L, 895L and 935L, and targeting the areas nearest existing mine

development. The mineralized envelope is tightly folded and the location of the available drill bays is

limited, meaning that drill holes will not necessarily intersect mineralization perpendicular to the strike

and dip. Additional drilling is needed to estimate true width and define the folded mineralization.

Drilling Continues

As of November 23, 2023, a total of 13,817 metres in 40 drillholes have been completed from the initial

three underground drill bays. During this initial phase, drilling is targeting the area down plunge of mine

infrastructure to characterize the remaining resource. Concurrently, step-out drilling will occur further

down plunge with the aim to demonstrate upside potential which will support a future MRE. Assay results

for completed holes will be released as they are received and confirmed by the Company.

Additional drill holes in the N2 Limb, N3 Limb and South Limb mineralization have been recently

concluded and are now in the process of preparation for shipment to the lab for testing. Core photos

from these holes can be viewed by

Clicking Here

.

Quality Control

The underground drilling program is being carried out through an agreement with Forage Fusion Drilling

Ltd. of Hawkesbury, Québec, Canada, who have provided three Zinex U-5 drills for purchase and training

of local operators. Drill core samples are BQTK (40.7 mm diameter). All samples are ½ core cut by a

diamond saw on site. Half of the core is retained for reference purposes. Samples are generally 1.0 to

1.5 metre intervals or less at the discretion of the site geologists. Sample preparation and lab analysis

was completed at the ALS Chemex in Johannesburg, South Africa. Commercially prepared blank

samples and certified Cu/Ni sulphide analytical control standards with a range of grades are inserted in

every batch of 20 samples or a minimum of one set per sample batch. Analyses for Ni, Cu and Co are

completed using a peroxide fusion preparation and ICP-AES finish (ME-ICP81).

Holes are numbered as follows: SNUG (Selebi North Underground) + year + hole number starting at 013.

Qualified Person

The scientific and technical content of this news release has been reviewed and approved by Sharon

Taylor, Vice President Exploration of the Company, who is a "qualified person" for the purposes of NI

43-101.

Technical Report

Scientific and technical information relating to the Selebi Mine is supported by the technical report titled

"Technical Report on the Selebi Mines, Central District, Republic of Botswana, Report for NI 43-101"

,

dated June 16, 2022 (effective date of March 1, 2022) (the "

Selebi Technical Report

"), and prepared

by SLR Consulting (Canada) Ltd. for PNRL. Reference should be made to the full text of the Selebi

Technical Report, including the assumptions, limitations and data verification therein relating to the

historic data compilation presented in this news release, which was prepared in accordance with NI 43-

101 and is available electronically on SEDAR+ (

www.sedarplus.com

) under PNRL's issuer profile.

Historic Resource Estimate

The historical mineral resource estimate reported herein (the "

Historic Resource

") was calculated for

the Selebi North, Selebi Main, Phikwe South and Southeast Extension deposits in accordance with

SAMREC, in 2016, and does not comply with NI 43-101. To that end, the Historic Resource is

considered to be historical in nature and should not be relied upon as a current mineral resource

estimate. While management believes that the Historic Resource could be indicative of the presence of

mineralization on the deposits, a qualified person for purposes of NI 43-101 has not completed sufficient

work to classify the historical mineral estimates as current mineral resource estimates and PNRL is not

treating the historical mineral estimates as current mineral resource estimates.

About Premium Nickel Resources Ltd.

PNRL is a mineral exploration and development company that is focused on the redevelopment of the

previously producing nickel, copper and cobalt resources mines owned by the Company in the Republic

of Botswana. We are driven by our belief that the demand for these metals will continue to grow in the

medium to long term, as a result of global urbanization and the increasing adoption of electric motors

over internal combustion engines. These metals are vital for achieving a low-carbon future.

PNRL is committed to governance through transparent accountability and open communication within

our team and our stakeholders. Our skilled team has worked over 100 projects collectively, accumulating

over 400 years of resource discoveries, mine development and mine re-engineering experience on

projects like the Company's Selebi and Selkirk mines. PNRL's senior team members have on average

more than 20 years of experience in every single aspect of mine discovery and development, from

geology to operations.

ON BEHALF OF THE BOARD OF DIRECTORS

Keith Morrison

Chairman and Chief Executive Officer

Premium Nickel Resources Ltd.

For further information about Premium Nickel Resources Ltd., please contact:

Jaclyn Ruptash

Vice President, Communications and Government and Investor Relations

+1 (604) 770-4334

Cautionary Note Regarding Forward-Looking Statements:

This news release contains "forward-looking information" within the meaning of applicable Canadian

securities legislation based on expectations, estimates and projections as at the date of this news

release. Forward-looking information involves risks, uncertainties and other factors that could cause

actual events, results, performance, prospects and opportunities to differ materially from those

expressed or implied by such forward-looking information. Forward-looking information in this news

release includes, but is not limited to: the ability of the Company to implement its drilling, geoscience and

metallurgical work on its properties and work plans generally; the implementation of the objectives, goals

and future plans of the Company including the proposed advancement of the Selebi Mines as currently

contemplated; the ability of exploration activities (including drill results) to accurately predict

mineralization; the ability of the Company to define mineral resource estimates on the Selebi Mines in

accordance with NI 43-101 and/or obtain an updated MRE in respect of the Selebi Mines; the

productivity rates for underground drilling at Selebi North; drilling results confirming the legacy fold

pattern continues at depth; the effective targeting activities proposed by the Company; the ability to

identify mineralization down plunge of existing workings and the ability of such findings to be used to

complete a MRE; the ability and timing of advancing the underground drilling program at Selebi North as

contemplated (if at all); the results of the drill program on Selebi North and the timing and disclosures of

the Company regarding same;

the relationships between, and continuity of, the various deposits (if any);

the benefits of the Company's approach to exploration; management's belief that the Historic Resource

could be indicative of the presence of mineralization on the deposits; and the anticipated benefits of the

Company's approach to the resource development plan. These forward-looking statements, by their

nature, require the Company to make certain assumptions and necessarily involve known and unknown

risks and uncertainties that could cause actual results to differ materially from those expressed or

implied in these forward-looking statements. Factors that could cause actual results to differ materially

from such forward-looking information include, but are not limited to, capital and operating costs varying

significantly from estimates; the preliminary nature of metallurgical test results; the ability of exploration

results to predict mineralization or the feasibility of mine production; delays in obtaining or failures to

obtain required governmental, environmental or other project approvals; uncertainties relating to the

availability and costs of financing needed in the future; changes in equity markets; inflation; fluctuations in

commodity prices; delays in the development of projects; the other risks involved in the mineral

exploration and development industry; and those risks set out in the Company's public disclosure record

on SEDAR+ (

www.sedarplus.com

) under PNRL's issuer profile. Although the Company believes that the

assumptions and factors used in preparing the forward-looking information in this news release are

reasonable, undue reliance should not be placed on such information, which only applies as of the date

of this news release, and no assurance can be given that such events will occur in the disclosed time

frames or at all. The Company disclaims any intention or obligation to update or revise any forward-

looking information, whether as a result of new information, future events or otherwise, other than as

required by law.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy

of this news release.

Follow Us

Twitter:

https://twitter.com/PremiumNickel

Linked in:

https://www.linkedin.com/company/premium-nickel-resources

Facebook:

https://www.facebook.com/PremiumNickel

Figure 1: Selebi North: Location of Reported Drill Holes with Underground Infrastructure,

Historic Resources and Exploration Targets

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/7759/188719_d359c985947abae3_002full.jpg

Figure 2: Selebi North Drill Hole Location

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/7759/188719_d359c985947abae3_003full.jpg

Figure 3a.

Selebi North UG Core Photos for New Holes Drilled N2 Limb and South

Limb_Assays Pending

SNUG-23 -064 (Assays Pending)

CLICK HERE FOR FULL INTERSECTION

22 Images Available

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/7759/188719_d359c985947abae3_004full.jpg

Figure 3b.

Selebi North UG Core Photos for New Holes Drilled N2 Limb and South

Limb_Assays Pending

SNUG-23 -067 (Assays Pending)

CLICK HERE FOR FULL INTERSECTION

21 Images Available

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/7759/188719_d359c985947abae3_005full.jpg

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/188719