Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NEXM.V ·

Premium Nickel Reports 102.80 Metres of 2.23% NiEq at Selebi North Underground

Drill Results

Premium Nickel Reports 102.80 Metres of

2.23% NiEq at Selebi North Underground

Toronto, Ontario--(Newsfile Corp. - February 13, 2024) -

Premium Nickel Resources Ltd. (TSXV:

PNRL) (OTCQX: PNRLF) ("PNRL" or the "Company")

is pleased to report additional assay results

from drilling at its past-producing nickel-copper-cobalt sulphide ("

Ni-Cu-Co

") Selebi North underground

("

SNUG

") mine in Botswana. Previous results for 26 holes were released in 2023 on November 14,

November 27 and December 19, 2023 and in 2024 on January 18 and January 30. Results for a further

eight holes are released herein. To date a total of 34 holes have been released representing an

aggregate of approximately 12,038 metres including the holes and metres released herein. Details of

the assay results are shown below along with accompanying visuals via Figure 1, Figure 2 and Figure 3.

Drill core photos for all holes released to date, including the holes reported herein, are accessible by

Clicking Here

and can also be found on the Company's website at

www.premiumnickelresources.com

.

Highlights include:

SNUG-23-060 (South Limb-north): 36.35 metres of 1.64% NiEq (1.01% Ni; 1.00% Cu;

0.05% Co)

including 15.40 metres of 2.00% NiEq (1.14% Ni; 1.42% Cu; 0.06% Co)

and

4.10 metres of 2.11% NiEq (1.44% Ni; 1.00% Cu; 0.08% Co)

and

5.60 metres of 2.76% NiEq (1.84% Ni; 1.41% Cu; 0.10% Co)

SNUG-23-060 (South Limb-south/N2): 38.20 metres of 1.67% NiEq (1.06% Ni; 0.97% Cu;

0.06% Co)

including 25.05 metres of 2.03% NiEq (1.27% Ni; 1.20% Cu; 0.07% Co)

including

8.30 metres of 3.07% NiEq (1.98% Ni; 1.72% Cu; 0.10% Co)

SNUG-23-062 (N2 Limb): 20.85 metres of 1.64% NiEq (0.85% Ni; 1.35% Cu; 0.04% Co)

including 10.85 metres of 2.10% NiEq (1.06% Ni; 1.79% Cu; 0.05% Co)

SNUG-23-064 (South Limb/N2): 102.80 metres of 2.23% NiEq (1.41% Ni; 1.30% Cu; 0.08%

Co)

including 86.75 metres of 2.64% NiEq (1.66% Ni; 1.55% Cu; 0.09% Co)

including 12.95 metres of 2.89% NiEq (1.92% Ni; 1.49% Cu; 0.10% Co)

and 14.70 metres of 3.26% NiEq (1.91% Ni; 2.23% Cu; 0.10% Co)

and 19.70 metres of 2.93% NiEq (1.99% Ni; 1.43% Cu; 0.11% Co)

and 12.25 metres of 2.71% NiEq (1.69% Ni; 1.62% Cu; 0.09% Co)

Keith Morrison, CEO of PNRL, commented:

"These assays continue to demonstrate notable nickel,

copper and cobalt grades associated with the conductive massive sulphide mineralization contained in

the Selebi North fold structures. These folds have complex shapes related to the formation of these

deposits. The South Limb is convex, like a bowl, and joins with the N2 limb in places. SNUG-23-060

drills through both sides of this South Limb bowl and identifies them as South Limb north and South Limb

south/N2. These results can be visualized in the VRIFY model. Given the restricted locations of the drill

bays, the intersection of multiple complex folds and the nature of resource drilling, true widths are difficult

to estimate accurately for some intercepts.

Our underground drilling and additional borehole electromagnetic ("

BHEM

") results are allowing larger

step-out down plunge intervals, with one hole currently in progress testing 140 metres below the historic

resource model and a second hole testing a further 100 metres down-plunge of that. In addition, our

results continue to outline additional mineralization between the N2 and N3 folds that is not captured in

the historic resource."

The purpose of this drill program is to define mineralization down plunge of the existing workings that will

be used to complete a Mineral Resource Estimation ("

MRE

") prepared in accordance with National

Instrument 43-101 -

Standards of Disclosure for Mineral Projects

("

NI 43-101

"). Assay results are given

below in Table 1 and hole collar details are given in Table 2. Figures 1, 2 and 3 show the location of

holes relative to the historic resource and underground infrastructure.

Table 1: Significant Assay Results Selebi North Deposit

Hole-ID

From

(m)

To

(m)

*Length

(m)

Ni

(%)

Cu

(%)

Co

(%)

Limb

**NiEq

(%)

SNUG-23-059

230.25

237.15

6.90

0.80

1.22

0.04

N3

1.52

including

230.25

236.00

5.75

0.71

1.29

0.04

N3

1.46

SNUG-23-060

173.90

210.25

36.35

1.01

1.00

0.05

South

1.64

including

173.90

189.30

15.40

1.14

1.42

0.06

South

2.00

*including*

173.90

178.95

5.05

0.72

3.88

0.04

South

2.83

and

180.65

186.50

5.85

2.02

0.29

0.10

South

2.36

SNUG-23-060

195.20

199.30

4.10

1.44

1.00

0.08

South

2.11

SNUG-23-060

204.65

210.25

5.60

1.84

1.41

0.10

South

2.76

SNUG-23-060

283.15

321.35

38.20

1.06

0.97

0.06

South/N2

1.67

including

283.15

285.35

2.20

1.32

0.70

0.07

South

1.81

and

289.50

293.75

4.25

1.03

1.08

0.06

South

1.71

and

296.30

321.35

25.05

1.27

1.20

0.07

South/N2

2.03

*including*

299.00

307.30

8.30

1.98

1.72

0.10

South/N2

3.07

and

317.35

321.35

4.00

1.76

0.41

0.09

N2

2.14

SNUG-23-060

348.50

350.65

2.15

1.94

1.09

0.10

N2

2.70

SNUG-23-061

57.20

59.10

1.90

1.31

2.50

0.11

N2

2.83

SNUG-23-062

168.90

189.75

20.85

0.85

1.35

0.04

N2

1.64

Including

172.30

183.15

10.85

1.06

1.79

0.05

N2

2.10

SNUG-23-064

73.00

175.80

102.8

1.41

1.30

0.08

South/N2

2.23

including

91.20

177.95

86.75

1.66

1.55

0.09

South/N2

2.64

*including*

94.50

107.45

12.95

1.92

1.49

0.10

South

2.89

and

116.60

131.30

14.70

1.90

2.23

0.10

South

3.26

and

139.00

158.70

19.70

1.99

1.43

0.11

South

2.93

and

163.55

175.80

12.25

1.69

1.62

0.09

N2

2.71

*Length refers to drillhole length and not true width. True widths of the South Limb are unknown but interpreted to be between 5 and 20 metres.

**NiEq was calculated assuming a price of $US 7.25/lb for Ni, $US 3.82/lb for Cu and $US 13.22/lb for cobalt with no adjustments for recoveries

and payabilities.

Table 2: Drill Collar Information Selebi North Deposit

HOLE ID

Mine East

Mine North

Elevation

Dip

Mine

Azimuth

Hole Length

Comment

SNUG-23-059

35081.6

84844.0

-7.7

-10.3

264.6

410.7

Rig #2 880mL

SNUG-23-060

35094.2

84759.2

-51.7

-28.4

163.9

373.7

Rig #1 935mL

SNUG-23-061

34917.5

84909.8

-7.9

-5.3

265.2

279.5

Rig #3 895mL

SNUG-23-062

35081.7

84844.1

-7.9

-20.6

268.1

455.4

Rig #2 880mL

SNUG-23-063

34917.0

84910.9

-7.9

-6.6

280.0

326.1

Rig #3 895mL

SNUG-23-064

35094.0

84759.1

-50.7

-1.6

175.1

239.2

Rig #1 935mL

SNUG-23-065

34917.2

84910.9

-8.3

-18.4

280.2

321.5

Rig #3 895mL

SNUG-23-066

35082.4

84843.4

-9.1

-40.7

247.3

538.4

Rig #2 880mL

The various mineralized zones have been historically mined and subsequently named N2 Limb, N3 Limb

and South Limb to demarcate their location on the folded mineralized horizon. Additional drilling is

needed to properly determine true width of mineralization on each limb and define the folded

mineralization.

The highlighted results from SNUG-23-060 and SNUG-23-064 returned multiple mineralized intervals

over a significant length. The South and N2 Limbs are extremely close and merge, and because of the

complex folding and location of available drill bays, this resulted in wide intervals of mineralization. The

target of these holes was the down plunge extension of N2. To test these extensions of N2, the holes first

passed through the South Limb sulphide horizon at a low angle (Figure 3). The South Limb is concave in

shape, with true thickness varying from 5 metres at the edge to 20 metres in the center. The true width of

these intersections will be determined by drilling from a new drill bay currently under development on the

810 Exploration drift.

Drilling and BHEM Continues

Three drills are currently active, two on the 810mL Exploration Drift and one on the 935mL Exploration

Drift. The two drills on the 810mL Exploration Drift allow for testing of areas further down plunge of the

three mineralized zones with the aim to demonstrate upside potential that will support a future NI 43-101

compliant MRE.

BHEM surveys are currently underway, with surveys completed in a total of eleven underground drillholes

including four 2024 holes drilled from the 810mL Exploration Drift testing the South Limb. Results from

these surveys indicate that the mineralized zones continue down plunge of current drilling, permitting

larger step-out intervals. Drillhole SNUG-24-082 is currently in progress testing South Limb 140 metres

down-plunge of the historic resource and a second hole, SNUG-24-083, is testing 100 metres down-

plunge of SNUG-24-082.

As of February 11, 2024, a total of 22,070 metres in fifty-nine (59) drillholes have been completed with

three drillholes in-progress from five underground drill bays. Assay results for completed holes will be

released as they are received and confirmed by the Company.

Quality Control

The underground drilling program is being carried out through an agreement with Forage Fusion Drilling

Ltd. of Hawkesbury, Ontario, Canada, who have provided three Zinex U-5 drills for purchase and training

of local operators. Drill core samples are BQTK (40.7 mm diameter). All samples are ½ core cut by a

diamond saw on site. Half of the core is retained for reference purposes. Samples are generally 1.0 to

1.5 metre intervals or less at the discretion of the site geologists. Sample preparation and lab analysis

was completed at the ALS Chemex in Johannesburg, South Africa. Commercially prepared blank

samples and certified Cu/Ni sulphide analytical control standards with a range of grades are inserted in

every batch of 20 samples or a minimum of one set per sample batch. Analyses for Ni, Cu and Co are

completed using a peroxide fusion preparation and ICP-AES finish (ME-ICP81).

Holes are numbered as follows: SNUG (Selebi North Underground) + year + hole number starting at 013.

BHEM Surveys

The BHEM surveys at Selebi utilize the Crone PEM system operated by local Batswana staff. Survey

data is collected using a 3 component fluxgate probe collecting full waveform data. Surveys have been

collected using timebases between 50 and 1000ms (0.25 Hz to 5Hz). The data has been processed to a

calculated residual step response to better quantify the conductive sources. This added processing has

proven to be invaluable because of the size of the highly conductive mineralized system.

Qualified Person

The scientific and technical content of this news release has been reviewed and approved by Sharon

Taylor, Vice President Exploration of the Company, who is a "qualified person" for the purposes of NI

43-101.

Technical Report

Scientific and technical information relating to the Selebi Mine is supported by the technical report titled

"Technical Report on the Selebi Mines, Central District, Republic of Botswana, Report for NI 43-101"

,

dated June 16, 2022 (effective date of March 1, 2022) (the "

Selebi Technical Report

"), and prepared

by SLR Consulting (Canada) Ltd. for PNRL. Reference should be made to the full text of the Selebi

Technical Report, including the assumptions, limitations and data verification therein relating to the

historic data compilation presented in this news release, which was prepared in accordance with NI 43-

101 and is available electronically on SEDAR+ (

www.sedarplus.com

) under PNRL's issuer profile.

Historic Resource Estimate

The historical mineral resource estimate referenced herein (the "

Historic Resource

") was calculated

for the Selebi North, Selebi Main, Phikwe South and Southeast Extension deposits in accordance with

SAMREC, in 2016, and does not comply with NI 43-101. To that end, the Historic Resource is

considered to be historical in nature and should not be relied upon as a current mineral resource

estimate. While management believes that the Historic Resource could be indicative of the presence of

mineralization on the deposits, a qualified person for purposes of NI 43-101 has not completed sufficient

work to classify the historical mineral estimates as current mineral resource estimates and PNRL is not

treating the historical mineral estimates as current mineral resource estimates.

About Premium Nickel Resources Ltd.

PNRL is a mineral exploration and development company that is focused on the redevelopment of the

previously producing nickel, copper and cobalt resources mines owned by the Company in the Republic

of Botswana. We are driven by our belief that the demand for these metals will continue to grow in the

medium to long term, as a result of global urbanization and the increasing adoption of electric motors

over internal combustion engines. These metals are vital for achieving a low-carbon future.

PNRL is committed to governance through transparent accountability and open communication within

our team and our stakeholders. Our skilled team has worked over 100 projects collectively, accumulating

over 400 years of resource discoveries, mine development and mine re-engineering experience on

projects like the Company's Selebi and Selkirk mines. PNRL's senior team members have on average

more than 20 years of experience in every single aspect of mine discovery and development, from

geology to operations.

ON BEHALF OF THE BOARD OF DIRECTORS

Keith Morrison

Director and Chief Executive Officer

Premium Nickel Resources Ltd.

For further information about Premium Nickel Resources Ltd., please contact:

Jaclyn Ruptash

Vice President, Communications and Government and Investor Relations

+1 (604) 770-4334

Cautionary Note Regarding Forward-Looking Statements:

This news release contains "forward-looking information" within the meaning of applicable Canadian

securities legislation based on expectations, estimates and projections as at the date of this news

release. Forward-looking information involves risks, uncertainties and other factors that could cause

actual events, results, performance, prospects and opportunities to differ materially from those

expressed or implied by such forward-looking information. Forward-looking information in this news

release includes, but is not limited to: the ability of the Company to implement its drilling, geoscience and

metallurgical work on its properties and work plans generally; the implementation of the objectives, goals

and future plans of the Company including the proposed advancement of the Selebi Mines as currently

contemplated; the ability of exploration activities (including drill results) to accurately predict

mineralization; management's belief that the Selebi and Selebi North deposits may be connected at

depth; the timing to release of the remaining assay results; the ability of the Company to implement its

drilling, geoscience and metallurgical work on its properties and work plans generally; the

implementation of the objectives, goals and future plans of the Company including the proposed

advancement of the Selebi Mines as currently contemplated; the ability of the Company to define mineral

resource estimates on the Selebi Mines in accordance with NI 43-101 and/or obtain an updated MRE in

respect of the Selebi Mines; the productivity rates for underground drilling at Selebi North; drilling results

confirming the legacy fold pattern continues at depth; the effective targeting activities proposed by the

Company; the ability to identify mineralization down plunge of existing workings and the ability of such

findings to be used to complete a MRE; the ability and timing of advancing the underground drilling

program at Selebi North as contemplated (if at all); the results of the drill program on Selebi North and

the timing and disclosures of the Company regarding same; the relationships between, and continuity of,

the various deposits (if any); the benefits of the Company's approach to exploration; management's

belief that the Historic Resource could be indicative of the presence of mineralization on the deposits;

and the anticipated benefits of the Company's approach to the resource development plan. These

forward-looking statements, by their nature, require the Company to make certain assumptions and

necessarily involve known and unknown risks and uncertainties that could cause actual results to differ

materially from those expressed or implied in these forward-looking statements. Factors that could

cause actual results to differ materially from such forward-looking information include, but are not limited

to, capital and operating costs varying significantly from estimates; the preliminary nature of metallurgical

test results; the ability of exploration results to predict mineralization or the feasibility of mine production;

delays in obtaining or failures to obtain required governmental, environmental or other project approvals;

uncertainties relating to the availability and costs of financing needed in the future; changes in equity

markets; inflation; fluctuations in commodity prices; delays in the development of projects; the other risks

involved in the mineral exploration and development industry; and those risks set out in the Company's

public disclosure record on SEDAR+ (

www.sedarplus.com

) under PNRL's issuer profile. Although the

Company believes that the assumptions and factors used in preparing the forward-looking information in

this news release are reasonable, undue reliance should not be placed on such information, which only

applies as of the date of this news release, and no assurance can be given that such events will occur in

the disclosed time frames or at all. The Company disclaims any intention or obligation to update or

revise any forward-looking information, whether as a result of new information, future events or otherwise,

other than as required by law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is

defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy

or accuracy of this news release.

Follow Us

X (formally Twitter):

https://twitter.com/PremiumNickel

Linked in:

https://www.linkedin.com/company/premium-nickel-resources

Facebook:

https://www.facebook.com/PremiumNickel

Figure 1: Selebi North: Location of Reported Drill Holes with Underground Infrastructure,

Historic Resources, Exploration Targets and modeled BHEM plates.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/7759/197690_115d7f78541d3af2_002full.jpg

Figure 2: Selebi North: Location of Reported Drill Holes with Underground Infrastructure,

Historic Resources and Exploration Targets

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/7759/197690_115d7f78541d3af2_003full.jpg

Figure 3: Selebi North: Plan view showing location of drillholes reported in this release.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/7759/197690_115d7f78541d3af2_004full.jpg

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/197690