Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NEXM.V ·

NexMetals Reports 11.05 Metres of 7.31% CuEq in SMD-25-205 Located 130 Metres Down-Dip from the Selebi Main Resource Within the Emerging Selebi Main Flexure Zone

Drill Results

NexMetals Reports 11.05 Metres of 7.31%

CuEq in SMD-25-205 Located 130 Metres

Down-Dip from the Selebi Main Resource

Within the Emerging Selebi Main Flexure Zone

Vancouver, British Columbia--(Newsfile Corp. - February 26, 2026) -

NexMetals Mining Corp. (TSXV:

NEXM) (NASDAQ: NEXM)

("

NEXM

" or the "

Company

") reports additional high-grade drill results from

its ongoing surface drilling program targeting the emerging Selebi Main Flexure Zone. Recent drilling

has intersected significant copper-nickel mineralization beyond the current Selebi Main Mineral

Resource Estimate ("

MRE

"), confirming the presence of a newly interpreted flexure in the mineralized

system and demonstrating strong potential for additional high-grade resource expansion adjacent to the

existing Selebi Main deposit.

Assay results reported in this news release are for drill holes SMD-25-204 and SMD-25-205. All other

drill holes referenced herein intersected visual sulphide mineralization, with assay results currently

pending. Drill core photos for all holes referenced in this release are available on the Company's website

at

https://nexmetalsmining.com/selebi-core-samples/

.

HIGHLIGHTS:

Drill hole SMD-25-205 intersected two zones of mineralization 215 metres up dip from

SMD-25-201.

Main Zone – 11.05 metres of 7.31% CuEq

(3.00% Cu and 2.09% Ni) including 5.75

metres of 8.73% CuEq (3.98% Cu and 2.31% Ni)

Lower Zone - 1.05 metres of 7.84% CuEq

Drill hole SMD-25-203 intersected two zones of mineralization 685 metres beyond the

current Selebi Main MRE:

Main Zone – 18.30 metre mineralized zone that includes multiple intervals of

massive, semi-massive, and disseminated sulphides

Lower Zone – two zones of massive sulphides within a 4.55 metre interval

Drill hole SMD-26-208 intersected three zones of massive and disseminated sulphides

located 230 metres up plunge of SMD-25-205

Upper Zone – 2.15 metre interval of massive sulphides

Main Zone – 3.05 metre interval of massive and disseminated sulphides

Lower Zone – 10.5 metre interval of massive and disseminated sulphides

Drill Hole SMD-25-204 intersected multiple, narrow massive sulphide intervals including

0.85 metres of 6.24% CuEq at a distance of 1,000 metres beyond the Selebi North MRE

Interpretation and Resource Expansion Potential

All 2025 drill holes reported to date have intersected mineralization significant distances outside

the current MRE. SMD-25-203 is located 685 metres northwest of the 2024 Selebi Main MRE.

Results confirm the presence of an

emerging Flexure Zone where the mineralized system

changes orientation

, extending both down-dip and down-plunge from the existing Selebi Main

resource.

This Flexure Zone encompasses the recently identified

700 metre x 700 metre Super

Conductor BHEM plate

(see news release dated

January 20, 2026

), as well as additional strong

conductive responses extending beyond SMD-25-203.

These results confirm that the Selebi Main mineralized system remains open well beyond

current resource boundaries

, highlighting strong potential to add significant tonnes in future

MRE updates.

Figure 1

– Selebi Mine Long Section

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/7759/285533_1e46b88744c739f0_002full.jpg

Figure 2

– Selebi Main drill hole locations, and borehole electromagnetic plate geometry highlighting

new mineralized horizons

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/7759/285533_1e46b88744c739f0_003full.jpg

Figure 3

– SMD-25-203 and SMD-26-208 core photos/sulphide intersections

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/7759/285533_1e46b88744c739f0_004full.jpg

Sean Whiteford, CEO of the Company, commented:

"The Selebi camp continues to deliver both

scale and grade. The identification of a Flexure Zone at Selebi Main, supported by strong BHEM

conductors, provides a clear target for resource expansion. With step out holes over 685m from the

current Selebi Main resource and wide intercepts of high-grade massive sulphides (up to 11.05m of

7.31% CuEq), the 2026 resource expansion program is off to a tremendous start."

To date, the Company has completed 15,540 metres across seven completed holes, one hole

extension, one abandoned hole, and three holes currently in progress as part of the Selebi Main surface

drilling program. This drilling continues to target extensions of the Selebi Main mineralized system

associated with high-priority BHEM conductors.

Table 1: 2025 Surface Drilling Results

Hole-ID

From

(m)

To

(m)

Length

(m)

Est. True

Thickness

1

Cu

(%)

Ni

(%)

Co

(%)

2

Zone

CuEq

(%)

3

SMD-25-204

1852.60

1852.95

0.35

unknown

0.63

1.80

0.10

Main Zone

4.34

SMD-25-204

1853.95

1854.30

0.35

unknown

0.46

2.53

0.13

Main Zone

5.67

SMD-25-204

1855.65

1856.50

0.85

unknown

4.29

0.95

0.05

Main Zone

6.24

SMD-25-204

1858.00

1858.35

0.35

unknown

2.47

0.14

0.01

Main Zone

2.76

SMD-25-205

1686.70

1697.75

11.05

10.7

3.00

2.09

0.09

Main Zone

7.31

Incl.

1692.00

1697.75

5.75

5.6

3.98

2.31

0.10

Main Zone

8.73

SMD-25-205

1708.30

1709.35

1.05

1.0

3.16

2.27

0.10

Lower Zone

7.84

1

Length refers to drillhole length in metres and not true width. True widths are estimated where density of drilling is sufficient for an estimation.

Some true widths cannot be estimated due to insufficient drill density.

2

Co is not included in the MRE as cobalt analyses are not consistently available throughout the deposit.

3

CuEq was calculated using the formula CuEq=Cu+2.06*Ni assuming long-term prices of US$10.50/lb Ni and US$4.75/lb Cu, and nickel and copper

recoveries of 72.0% and 92.4%, respectively, derived from metallurgical studies which consider a conceptual bulk concentrate scenario.

Table 2: 2025-2026 Surface Drill Collar Information

HOLE ID

UTM East

UTM North

Elevation

Dip

True North

Azimuth

Hole Length

Comment

SMD-25-203

582550.8

7564012.8

905.8

-78.2

109.9

2,010.4

SMD-25-204

583002.8

7564891.7

893.8

-78.4

114.8

2,146.9

SMD-25-205

582693.6

7563648.3

903.9

-77.7

117.4

1,799.5

SMD-25-206

582643.8

7563224.1

905.2

-81.1

108.2

13.1

Abandoned due to

excessive deviation

SMD-25-207

582644.0

7563223.9

905.4

-81.2

108.2

1,737.6

SMD-26-208

582752.1

7563358.1

903.6

-77.0

111.5

1678.2

SMD-26-209

582465.3

7563469.4

908.0

-74.1

101.9

1,880

Planned Depth

Drilling in progress

SMD-26-210

582807.4

7563850.3

901.2

-75.1

114.7

1,825

Planned Depth

Drilling in progress

SMD-26-211

582519.8

7563779.5

906.5

-75.0

111.3

2,100

Planned Depth

Drilling in progress

HOLE ID

UTM East

UTM North

Elevation

Dip

True North

Azimuth

Hole Length

Comment

Qualified Person

All scientific and technical information in this news release has been reviewed and approved by Sharon

Taylor, VP Exploration of the Company, MSc, P.Geo, and a "qualified person" for the purposes of

National Instrument 43-101 and Subpart 1300 of Regulation S-K.

Quality Control

The program is being executed using two company-owned underground Zinex U5 drills which were

converted into surface A5 drills, and a new Marcotte HTM2500 drill purchased by the Company capable

of drilling to depths of 2,550 metres (NQ core) which arrived on site in July 2025.

Drill core samples are either NQ (47.75 mm diameter) or BQ (36.40 mm diameter).

All samples are ½

core samples cut by a diamond saw on site and the remaining half of the core is retained for reference

purposes. Samples are generally 1.0 to 1.5 metre intervals or less at the discretion of the site geologists.

Sample preparation and lab analysis was completed at ALS Geochemistry in Johannesburg, South

Africa. Commercially prepared Blank samples and certified Cu/Ni sulphide analytical control standards

with a range of grades are inserted in every batch of 20 samples or a minimum of one set per sample

batch. Analyses for Ni, Cu and Co are completed using a peroxide fusion preparation and ICP-AES

finish (ME-ICP81). Analyses for Pt, Pd, and Au are by fire assay (30 grams nominal sample weight) with

an ICP-AES finish (PGM-ICP23).

Holes are numbered as follows: SMD (Selebi Main Deposit) + year + hole number starting at 201.

BHEM Surveys

The BHEM surveys at Selebi utilize the Crone PEM system operated by local Batswana staff. Survey

data is collected using a 3-component fluxgate probe collecting full waveform data. Surveys have been

collected using timebases between 50 and 1000ms (0.25 Hz to 5 Hz). The data has been processed to

a calculated residual step response to better quantify the conductive sources. This added processing

has proven to be invaluable because of the size of the highly conductive mineralized system.

Technical Report

The MRE on the Selebi Mine is supported by the technical report entitled "Technical Report, Selebi

Mines, Central District, Republic of Botswana" and dated September 20, 2024 (with an effective date of

June 30, 2024) (the "

Selebi Technical Report

"), and prepared by SLR Consulting (Canada) Ltd. for

NEXM. Reference should be made to the full text of the Selebi Technical Report, which was prepared in

accordance with NI 43-101 and Subpart 1300 of Regulation S-K and is available on SEDAR+

(

www.sedarplus.ca

) and EDGAR (

www.sec.gov

), in each case, under NEXM's issuer profile.

About NexMetals Mining Corp.

NexMetals Mining Corp. is a TSX.V and NASDAQ listed mineral exploration and development company

focused on redeveloping the past-producing Selebi and Selkirk copper-nickel-cobalt-platinum group

element mines in Botswana.

NexMetals has confirmed the scale of mineralization is larger than historical

estimates, supported by NI 43-101-compliant resource estimates, with ongoing down-hole geophysics,

drilling, and metallurgical programs aimed at expanding resources and supporting future economic

studies. The Company is led by an experienced management and technical team with a proven track

record in global mineral projects, emphasizing disciplined execution, transparent governance, and long-

term stakeholder value creation.

For further information about NexMetals Mining Corp., please contact:

Sean Whiteford

CEO

[email protected]

1-833-770-4334

Neither the TSX Venture Exchange and its Regulation Services Provider (as that term is defined

in the policies of the TSX Venture Exchange) nor the Nasdaq Stock Market LLC accepts

responsibility for the adequacy or accuracy of this news release. No stock exchange, securities

commission or other regulatory authority has approved or disapproved the information

contained herein.

Follow Us

X:

https://x.com/NexMetalsCorp

LinkedIn:

https://www.linkedin.com/company/NexMetalsMiningCorp

Facebook:

https://www.facebook.com/NexMetalsMiningCorp

Cautionary Note Regarding Forward-Looking Statements

This news release contains "forward-looking statements" within the meaning of the United States

federal securities laws and "forward-looking information" within the meaning of applicable Canadian

securities legislation (collectively, "forward-looking information") based on expectations, estimates

and projections as at the date of this news release. Forward-looking information involves risks,

uncertainties and other factors that could cause actual events, results, performance, prospects and

opportunities to differ materially from those expressed or implied by such forward-looking information.

For the purposes of this release, forward looking information includes, but is not limited to, the

potential for additional high-grade resource expansion adjacent to the existing Selebi Main deposit;

the potential to add significant tonnes in future MRE updates. These forward-looking statements, by

their nature, require the Company to make certain assumptions and necessarily involve known and

unknown risks and uncertainties that could cause actual results to differ materially from those

expressed or implied in these forward-looking statements. Such assumptions include, without

limitation: the Company's ability to successfully complete its planned exploration and drilling

programmes; the geological interpretations of the Selebi Main deposit are accurate and additional

mineralization can be identified; the Company will have sufficient funding and resources to carry out

its exploration activities; the regulatory environment will remain favourable and all required permits

and approvals will be obtained in a timely manner; general economic and market conditions will

remain stable; and the Company's ability to retain qualified personnel. Factors that could cause

actual results to differ materially from such forward-looking information include, but are not limited to,

capital and operating costs varying significantly from estimates; the preliminary nature of drilling and

metallurgical test results; the ability of exploration results to predict mineralization; the ability of the

Company to implement its drilling, geoscience and metallurgical work on its properties and work plans

generally; prefeasibility or the feasibility of mine production; delays in obtaining or failures to obtain

required governmental, environmental or other project approvals; uncertainties relating to the

availability and costs of financing needed in the future; changes in equity markets; inflation;

fluctuations in commodity prices; delays in the development of projects; the other risks involved in the

mineral exploration and development industry; and those risks set out in the Company's filings with

the U.S. Securities and Exchange Commission on EDGAR (

www.sec.gov

) and public disclosure

record on SEDAR+ (

www.sedarplus.ca

), in each case, under NEXM's issuer profile. Although the

Company believes that the assumptions and factors used in preparing the forward-looking information

in this news release are reasonable, undue reliance should not be placed on such information, which

only applies as of the date of this news release, and no assurance can be given that such events will

occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to

update or revise any forward-looking information, whether as a result of new information, future events

or otherwise, other than as required by law.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/285533