Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NEXM.V ·

NexMetals Metallurgical Assay Results Confirm Clean Copper & Nickel-Cobalt Concentrates from Selebi Mines

Drill Results Metallurgy & Processing

NexMetals Metallurgical Assay Results

Confirm Clean Copper & Nickel-Cobalt

Concentrates from Selebi Mines

Vancouver, British Columbia--(Newsfile Corp. - October 22, 2025) -

NexMetals Mining Corp. (TSXV:

NEXM) (NASDAQ: NEXM)

(the "

Company

" or "

NEXM

") is pleased to announce that final concentrate

assay results from its bulk sample-based metallurgical test program (

see news release dated

September 3, 2025

) at the past-producing

Selebi Mines

in Botswana have confirmed the potential to

produce

clean, high-grade, saleable copper and nickel-cobalt concentrates

.

Clean Concentrates Confirmed

Commercial Specifications:

Assays confirm both concentrates potentially meet

industry-

standard smelter acceptance criteria

, establishing a potential pathway to commercial sales.

Clean Concentrate:

Both the copper and nickel concentrates show very low levels of deleterious

elements, including magnesium, cadmium, mercury, fluorine, lead, silica, and arsenic, all are below

industry-standard penalty thresholds.

This

clean profile is highly compelling and could

enhance marketability and offtake terms.

Low-Capital Restart Pathway:

Validates the option for the Company to

restart operations

without the need for an on-site smelter or hydrometallurgical plant

, reducing capital intensity

and execution risk.

Next Steps

Based on findings from mineralogical studies, investigate opportunity to reduce nickel losses of

liberated nickel sulphide fines in nickel rougher tails by minimizing overgrinding and fines

generation.

Variability testing on additional Selebi samples.

Use results to optimize the flowsheet and mining sequence to drive higher overall recoveries.

Morgan Lekstrom, CEO of the Company, commented:

"These results confirm the success of our

flowsheet process testing which demonstrated our ability to produce two separate, high-grade saleable

copper and nickel concentrates. The final assays now show that both concentrates are

very clean

,

containing

low levels of deleterious elements

and potentially meet

commercial smelter

specifications

.

Another exciting step in our accelerated work program, this further de-risks

the

project

and enhances the marketability of Selebi's concentrates."

Technical Details

The geochemical analyses were carried out by Activation Laboratories Ltd. ("

Actlabs

"), Ancaster,

Ontario, Canada, to provide quality assessment of the Copper and Nickel concentrates produced from

Selebi Locked Cycle Test 1 carried out at Blue Coast Research labs (see news release dated

September 3, 2025).

For brevity, only the analyses of potentially payable metals and deleterious

elements are given in Table 1. Deleterious elements that can attract penalties in copper concentrate

include arsenic, antimony, bismuth, lead, zinc, mercury, fluorine/chlorine, cadmium, selenium, tellurium,

silica (SiO

2

), alumina (AL

2

O

3

), and magnesia (MgO). Deleterious elements in nickel concentrate include

arsenic, antimony, bismuth, lead, mercury, zinc, chlorine/fluorine, phosphorous, magnesium, aluminum,

silica, and carbon.

For both the copper and nickel concentrates, all deleterious elements are well below the

industry standard smelter penalty threshold.

Table 1.

Lock Cycle Test -1 Copper and Nickel Concentrate Quality Assessment

Analyte

Analytical Method

Unit

Copper Concentrate

Nickel Concentrate

Potentially Payable Metals

Ni

4AD-ICP

%

0.744

10.593

Cu

4AD-ICP

%

27.772

2.491

Co

4AD-ICP

%

0.023

0.546

Ag

4AD-ICP

g/t

47.5

20.2

Au

FA-ICP

g/t

0.75

0.27

Pd

FA-ICP

g/t

0.57

0.64

Pt

FA-ICP

g/t

0.36

0.84

Other Elements

As

4AD-ICP

ppm

4

2

Al

2

O

3

FUS-XRF/FUS-ICP

%

0.71

0.23

Sb

4AD-ICP

ppm

51

20

Bi

4AD-ICP

ppm

10

34

Cd

4AD-ICP

ppm

33.9

9.7

Cl

INAA

%

0.01

< 0.01

C

tot

Eltra

%

0.26

0.05

F

FUS-ISE

%

< 0.01

< 0.01

Fe

4AD-ICP

%

36.21

50.15

Pb

4AD-ICP

ppm

44

29

MgO

FUS-XRF

%

0.26

< 0.01

Hg

1G

ppb

19

11

Mo

4AD-ICP

ppm

<1

3

Se

4AD-ICP

ppm

25

<10

SiO

2

FUS-XRF/FUS-ICP

%

0.04

0.57

Al

2

O

3

FUS-XRF/FUS-ICP

%

0.71

0.23

S

tot

Eltra

%

34.88

35.73

Te

4AD-ICP

ppm

58

48

Zn

4AD-ICP

ppm

670

358

Quality Control

Analyses were performed at Blue Coast Research ("

BCR

") in Parksville, British Columbia and Actlabs.

BCR used a four acid digestion analyzed by ICP-OES (4AD-ICP) and Combustion-IR by Eltra for Sulfur

(S(tot)-ELTRA).

Actlabs carried out the remaining analyses using Hg-Cold Vapour AA, Whole rock

Analysis-XRF, Short Lived (INAA), Fusion Specific Ion Electrode-ISE and Major Elements Fusion (ICP-

OES).

Actlabs is an independent laboratory and accredited by the Standards Council of Canada to the ISO/IEC

17025 standard.

Qualified Persons

All scientific and technical information in this news release has been reviewed and approved by Norman

Lotter, P.Eng., Pr.Eng., C.Eng., FSAIMM, FIMM, Consulting Engineer, and by Sharon Taylor, MSc.,

P.Geo., Vice President Exploration of the Company, each of whom are "qualified persons" for the

purposes of NI 43-101 and Subpart 1300 of Regulation S-K.

Technical Report

The mineral resource estimate on the Selebi Mine is supported by the technical report entitled

"Technical Report, Selebi Mines, Central District, Republic of Botswana" and dated September 20,

2024 (with an effective date of June 30, 2024) (the "

Selebi Technical Report

"), and prepared by SLR

Consulting (Canada) Ltd. for NEXM. Reference should be made to the full text of the Selebi Technical

Report, which was prepared in accordance with NI 43-101 and is available on SEDAR+

(

www.sedarplus.ca

) and "S-K 1300 Technical Report Summary Selebi Mines, Central District, Republic

of Botswana" and dated December 17, 2024, filed in accordance with Subpart 1300 of Regulation S-K

on EDGAR (

www.sec.gov

), and in each case under NEXM's issuer profile.

About NexMetals Mining Corp.

NexMetals Mining Corp. is a mineral exploration and development company that is focused on the

redevelopment of the previously producing copper, nickel and cobalt resources mines owned by the

Company in the Republic of Botswana.

NexMetals is committed to governance through transparent accountability and open communication

within our team and our stakeholders. NexMetals' team brings extensive experience across the full

spectrum of mine discovery and development. Collectively, the team has contributed to dozens of

projects, including work on the Company's Selebi and Selkirk mines. Senior team members each have

on average, more than 20 years of experience spanning geology, engineering, operations, and project

development.

For further information about NexMetals Mining Corp., please contact:

Morgan Lekstrom

CEO and Director

[email protected]

Jaclyn Ruptash

V.P., Communications and Investor Relations

[email protected]

Follow Us

X:

https://x.com/NexMetalsCorp

LinkedIn:

https://www.linkedin.com/company/NexMetalsMiningCorp

Facebook:

https://www.facebook.com/NexMetalsMiningCorp

Neither the TSX Venture Exchange and its Regulation Services Provider (as that term is defined

in the policies of the TSX Venture Exchange) nor the Nasdaq Stock Market LLC accepts

responsibility for the adequacy or accuracy of this news release. No stock exchange, securities

commission or other regulatory authority has approved or disapproved the information

contained herein.

Cautionary Note Regarding Forward-Looking Statements

This news release contains "forward-looking statements" within the meaning of the United States

federal securities laws and "forward-looking information" within the meaning of applicable Canadian

securities legislation (collectively, "forward-looking information") based on expectations, estimates

and projections as at the date of this news release. Forward-looking information involves risks,

uncertainties and other factors that could cause actual events, results, performance, prospects and

opportunities to differ materially from those expressed or implied by such forward-looking information.

For the purposes of this release, forward-looking information includes, but is not limited to: the

expectation that the Selebi Mines have the potential to produce clean, high-grade, saleable copper

and nickel-cobalt concentrates, and the potential commercial sale of such concentrates; the

expectation that the Company will not be required to build a smelter or hydrometallurgical facility on

the Selebi Mines to restart operations; the expectation that the proposed flow sheet design in respect

of the Selebi Mines will result in lower energy requirements and a reduced environmental footprint; the

Company's anticipation of a faster and more efficient potential restart of the Selebi Mines; anticipated

flexibility in future potential offtake negotiations; the implementation of the objectives, goals and future

plans of the Company including the proposed advancement of the Selebi Mines as currently

contemplated, including variability testing on additional Selebi samples and flowsheet optimization;

the expectation that exploration activities will accurately predict mineralization; the Company's

expectation that the mineral resource estimate may be materially improved; the expectation that the

Company will implement its drilling, geoscience and metallurgical work on its properties and work

plans generally; management's belief that the historical resource could be indicative of the presence

of mineralization on the deposits; and the anticipated benefits of the Company's approach to the

resource development plan. These forward-looking statements, by their nature, require the Company

to make certain assumptions and necessarily involve known and unknown risks and uncertainties that

could cause actual results to differ materially from those expressed or implied in these forward-looking

statements. Factors that could cause actual results to differ materially from such forward-looking

information include, but are not limited to, the Selebi Mines may not restart or re-enter production on

the timing anticipated or at all; risks related to the potential commercial sale of concentrates or that

such sales do not occur on the timing anticipated or at all; capital and operating costs varying

significantly from estimates; the derisking and reduced capex and energy requirements of the Selebi

Mines may not be as anticipated; the Company may not enter into future offtake agreements; the

ability of exploration and metallurgical results to predict mineralization, prefeasibility or the feasibility

of mine production; the risk that future assay results will not be as anticipated or received when

anticipated; delays in obtaining or failures to obtain required governmental, environmental or other

project approvals; uncertainties relating to the availability and costs of financing needed in the future;

changes in equity markets; inflation; fluctuations in commodity prices; delays in the development of

projects; the other risks involved in the mineral exploration and development industry; and those risks

set out in the Company's filings with the U.S. Securities and Exchange Commission on EDGAR

(

www.sec.gov

) and public disclosure record on SEDAR+ (

www.sedarplus.com

), in each case, under

NEXM's issuer profile. Although the Company believes that the assumptions and factors used in

preparing the forward-looking information in this news release are reasonable, undue reliance should

not be placed on such information, which only applies as of the date of this news release, and no

assurance can be given that such events will occur in the disclosed time frames or at all. The

Company disclaims any intention or obligation to update or revise any forward-looking information,

whether as a result of new information, future events or otherwise, other than as required by law.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/271407