Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NEXM.V ·

NexMetals Drills 201.30 metres of 0.91% CuEq, including 158.75 metres of 1.00% CuEq Near Surface Emphasizing Consistent Mineralization and Expansion Potential at Selkirk

Drill Results

NexMetals Drills 201.30 metres of 0.91% CuEq,

including 158.75 metres of 1.00% CuEq Near

Surface Emphasizing Consistent

Mineralization and Expansion Potential at

Selkirk

Vancouver, British Columbia--(Newsfile Corp. - September 18, 2025) -

NexMetals Mining Corp.

(TSXV: NEXM) (NASDAQ: NEXM)

(the "

Company

") announces assay results from 2 holes of the 12

hole metallurgical drilling program completed at the past-producing Copper, Nickel, Cobalt and Platinum

Group Elements ("

Cu-Ni-Co-PGE

") Selkirk Mine in Botswana. Drill core from eleven of these holes will

be used in support of ongoing metallurgical testwork while further highlighting the scale and consistency

of the Selkirk deposit.

Why This Matters: Scale, Grade, Expansion

Results demonstrate the scale and consistency of mineralization.

SMET-25-003: wide interval of continuous mineralization

201.30 metres of 0.91% CuEq

(0.33% Cu, 0.30% Ni, 0.55 ppm Pd, 0.13 ppm Pt)

Incl. 158.75 metres of 1.00% CuEq

(0.36% Cu, 0.33% Ni, 0.60 ppm Pd, 0.13 ppm

Pt)

SMET-25-002: wide interval of continuous mineralization

85.00 metres of 0.98% CuEq

(0.34% Cu, 0.31% Ni, 0.65 ppm Pd, 0.14 ppm Pt)

Mineralization outside the Mineral Resource Estimate ("MRE")

and within the current

conceptual pit shell, demonstrating the potential for expansion of the deposit toward the

surface.

SMET-25-002: starting at 26.10 metres from surface

19.90 metres of 0.58% CuEq (0.18% Cu, 0.19% Ni, 0.43 ppm Pd, 0.09 ppm Pt)

Large widths of near-surface mineralization support open-pit development potential with a low strip

ratio (see technical report).

Current cut-off of US$25.00 per tonne net smelter return defined in the MRE translates to 0.46%

CuEq. Any material above this cut-off grade could be potentially mined.

Selected samples from this drilling program are at Blue Coast Research labs in British Columbia

for variability testing and flowsheet optimization testwork.

This marks the first 2 metallurgical drill holes from the 2025 program, with assays to be released

on an ongoing basis.

Figure 1:

Location of 2025 metallurgical drill holes, resampled drillholes and Mineral Resource

Estimate.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/7759/266919_e43e732344a5c9b9_002full.jpg

Morgan Lekstrom, CEO of the Company, commented:

"These new drill results have delivered

above and beyond what we have anticipated including large, continuous zones of mineralization that

confirm the scale of just how big the Selkirk deposit could be. By collecting both base metal and PGE

assays throughout the entirety of each hole, we have identified wide intervals of mineralization both

above the current MRE, yet still within the conceptual pit shell and also immediately below the conceptual

pit.

Combined with the ongoing resampling and metallurgical programs, these results not only provide

essential material for processing studies but also indicate meaningful opportunities to improve the strip

ratio. Selkirk continues to demonstrate substantial upside, and with our dual focus on metallurgical

optimization and resource growth, we are increasingly defining the full scale and potential of this

deposit."

Assay results are reported below in Table 1 and drill hole collar details are provided in Table 2.

Table 1: Assay Results Selkirk Deposit

HOLE ID

FROM

(m)

TO

(m)

1

LENGTH

(m)

Cu

(%)

NI

(%)

Co

(%)

Pd

(ppm)

Pt

(ppm)

Au

(ppm)

2

CuEq

(%)

SMET-25-002

26.10

207.00

180.90

0.26

0.25

0.01

0.52

0.11

0.04

0.77

incl

53.00

78.00

25.00

0.21

0.22

0.01

0.43

0.09

0.03

0.65

and

122.00

207.00

85.00

0.34

0.31

0.02

0.65

0.14

0.05

0.98

incl

195.00

207.00

12.00

0.48

0.35

0.02

0.87

0.16

0.10

1.26

SMET-25-003

12.70

214.00

201.30

0.33

0.30

0.02

0.55

0.13

0.05

0.91

incl.

44.25

203.00

158.75

0.36

0.33

0.02

0.60

0.13

0.06

1.00

incl.

73.00

195.00

122.00

0.39

0.36

0.02

0.63

0.14

0.07

1.07

OUTSIDE MRE AND INSIDE CONCEPTUAL PIT

SMET-25-002

26.10

46.00

19.90

0.18

0.19

0.01

0.43

0.09

0.04

0.58

SMET-25-003

12.70

25.00

12.30

0.21

0.19

0.01

0.37

0.08

0.03

0.59

OUTSIDE MRE AND BENEATH CONCEPTUAL PIT

SMET-25-003

200.00

214.00

14.00

0.27

0.24

0.02

0.48

0.11

0.04

0.76

1

Length refers to drillhole length and not true width.

2

CuEq% calculated using the formula Cu% + Ni%*(55.605/53.913) + Pd g/t*(22.948/53.913) + Pt g/t*(14.891/53.913) using metal prices and recoveries

listed in the 2025 Technical Report.

3

Interval is outside MRE but inside the conceptualized open pit shell.

HOLE ID

FROM

(m)

TO

(m)

1

LENGTH

(m)

Cu

(%)

NI

(%)

Co

(%)

Pd

(ppm)

Pt

(ppm)

Au

(ppm)

2

CuEq

(%)

Table 2: Drill Collar Information Selkirk Deposit

HOLE ID

1

Easting

1

Northing

1

Elevation

Dip

Azimuth

Hole Length

(m)

SMET-25-002

575370.9

7642476.5

986.8

-72.1

30.5

401.20

SMET-25-003

575450.8

7642666.4

996.9

-69.0

27.2

295.85

1

Coordinates are WGS84z35S with geoidal elevations

Technical Report

The MRE on the Selkirk Mine is supported by the Technical Report entitled "NI 43-101 Technical Report

Selkirk Nickel Project, North East District, Republic of Botswana", dated January 8, 2025 (with an

effective date of November 1, 2024). Reference should be made to the full text of the Technical Report

for the assumptions, qualifications and limitations set forth therein, which was prepared in accordance

with NI 43-101 and Subpart 1300 of Regulation S-K and is available on SEDAR+ (

www.sedarplus.ca

)

and EDGAR (

www.sec.gov

), in each case, under NEXM's issuer profile.

Quality Control

The Selkirk metallurgical drill program was completed by Discovery Drilling using a Boyles 56 machine.

Drill core samples are HQ (63.5 mm diameter) that were sawn in half with one half sawn in half again to

produce quartered core. Selected portions of the remaining core were sent to Blue Coast Research for

metallurgical flotation studies with the reminder retained for reference purposes. The quartered core

samples submitted to the lab were generally 1 metre in length. Sample preparation and lab analysis was

completed at ALS Chemex in Johannesburg, South Africa. Commercially prepared blank samples and

certified Cu/Ni sulphide analytical control standards with a range of grades are inserted in every batch of

20 samples or a minimum of one set per sample batch. Analyses for Ni, Cu and Co are completed using

a peroxide fusion preparation and ICP-AES finish (ME-ICP81). Analyses for Pt, Pd, and Au are by fire

assay (30 grams nominal sample weight) with an ICP-AES finish (PGM-ICP23).

Qualified Person

All scientific and technical information in this news release has been reviewed and approved by Sharon

Taylor, VP Exploration of the Company, MSc, P.Geo, and a "qualified person" for the purposes of

National Instrument 43-101 and Subpart 1300 of Regulation S-K.

About NexMetals Mining Corp.

NexMetals Mining Corp. is a mineral exploration and development company that is focused on the

redevelopment of the previously producing copper, nickel and cobalt resources mines owned by the

Company in the Republic of Botswana.

NexMetals is committed to governance through transparent accountability and open communication

within our team and our stakeholders. NexMetals' team brings extensive experience across the full

spectrum of mine discovery and development. Collectively, the team has contributed to dozens of

projects, including work on the Company's Selebi and Selkirk mines. Senior team members each have

on average, more than 20 years of experience spanning geology, engineering, operations, and project

development.

For further information about NexMetals Mining Corp., please contact:

Morgan Lekstrom

CEO and Director

[email protected]

Jaclyn Ruptash

V.P., Communications and Investor Relations

[email protected]

Follow Us

X:

https://x.com/NexMetalsCorp

LinkedIn:

https://www.linkedin.com/company/NexMetalsMiningCorp

Facebook:

https://www.facebook.com/NexMetalsMiningCorp

Neither the TSX Venture Exchange and its Regulation Services Provider (as that term is defined

in the policies of the TSX Venture Exchange) nor the Nasdaq Stock Market LLC accepts

responsibility for the adequacy or accuracy of this news release. No stock exchange, securities

commission or other regulatory authority has approved or disapproved the information

contained herein.

Cautionary Note Regarding Forward-Looking Statements

This news release contains forward-looking statements" within the meaning of the United States

federal securities laws and "forward-looking information" within the meaning of applicable Canadian

securities legislation (collectively, "forward-looking information") based on expectations, estimates

and projections as at the date of this news release. Forward-looking information involves risks,

uncertainties and other factors that could cause actual events, results, performance, prospects and

opportunities to differ materially from those expressed or implied by such forward-looking information.

For the purposes of this release, forward looking information includes, but is not limited to, the

implementation of the objectives, goals and future plans of the Company including the proposed

advancement of the Selkirk Mine as currently contemplated; the release of metallurgical testing

results and the expected timing thereof; management's belief that historical resources could be

indicative of the presence of mineralization on the deposits; the potential for near surface expansion

of the deposit; the potential for open-pit development with a low strip ratio; the potential for material

above the cut-off grade to be mined; and the anticipated benefits of the Company's approach to its

resource development plan. These forward-looking statements, by their nature, require the Company

to make certain assumptions and necessarily involve known and unknown risks and uncertainties that

could cause actual results to differ materially from those expressed or implied in these forward-looking

statements. Factors that could cause actual results to differ materially from such forward-looking

information include, but are not limited to, capital and operating costs varying significantly from

estimates; the preliminary nature of drilling and metallurgical test results; the ability of exploration

results to predict mineralization; the ability of the Company to implement its drilling, geoscience and

metallurgical work on its properties and work plans generally; prefeasibility or the feasibility of mine

production; delays in obtaining or failures to obtain required governmental, environmental or other

project approvals; uncertainties relating to the availability and costs of financing needed in the future;

changes in equity markets; inflation; fluctuations in commodity prices; delays in the development of

projects; the other risks involved in the mineral exploration and development industry; and those risks

set out in the Company's filings with the U.S. Securities and Exchange Commission on EDGAR

(

www.sec.gov

) and public disclosure record on SEDAR+ (

www.sedarplus.ca

), in each case, under

NEXM's issuer profile. Although the Company believes that the assumptions and factors used in

preparing the forward-looking information in this news release are reasonable, undue reliance should

not be placed on such information, which only applies as of the date of this news release, and no

assurance can be given that such events will occur in the disclosed time frames or at all. The

Company disclaims any intention or obligation to update or revise any forward-looking information,

whether as a result of new information, future events or otherwise, other than as required by law.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/266919