Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NEXM.V ·

2017 Maniitsoq Exploration Program Underway

Exploration Programs

NORTH AMERICAN NICKEL INC.

2200-1055 W. Hastings Street

Vancouver, BC

V6E 2E9

Tel: (604) 770-4334

Toll Free: 1-866-816-0118

2017 MANIITSOQ EXPLORATION PROGRAM UNDERWAY

Vancouver, British Columbia, June 20, 2017 – North American Nickel Inc. (TSX VENTURE: NAN)

(OTCBB: WSCRF) (CUSIP: 65704T 108) (the " Company") is pleased to announce that the 2017

exploration program has commenced at its 100% ow ned Maniitsoq nickel-copper-cobalt-PGM project in

Southwest Greenland.

The Company is undertaking the third year of a focu ssed three-year strategy to advance the Maniitsoq

Project. The primary exploration objective in 2017 is to carry out step-out drilling at three key locations,

the Imiak Hill Complex (IHC), Fossilik and P-013SE, in order to advance one or more areas to delineation

drilling stage for 2018 (Figure 1). Concurrently, the Company will be carrying out infrastructure-related

and environmental baseline studies and advancing the project’s social license through on-going corporate

social responsibility initiatives.

NAN CEO, Keith Morrison, commented: “The results from the 2016 drilling campaign were successful in

allowing NAN to progress to this next stage of fo llow-up drilling to continue to evaluate size potential at

Maniitsoq. The goal of the 2017 work program is to advance the project to a delineation and resource

estimate stage by 2018 and to continue to lay the gro und work for critical infrastructure needed for future

resource development.”

The 2017 exploration program will comprise approximately 11,000 metres of diamond drilling, borehole

electromagnetic (BHEM) surveys, surface Induced Polarization (“I P”) geophysical surveys, mapping,

prospecting, sampling, structural geological studies and 3D modeling. A key component of program

implementation will be the 3D integration and modeling of all exploration data in order to optimize drill

hole targeting and develop new drilling targets within prospective norite stratigraphy.

The three areas selected for drilling in 2017 are a culmi nation of the exploration work carried out in 2015

and 2016. Fossilik and the IHC each represent areas where one or more discrete and open sulphide

lenses and multiple untested exploration tar gets have been defined. P- 013 SE represents a new

discovery of high grade nickel sulphide mineralizat ion which has only been tested with one drill hole to

date. In particular, step-o ut drilling will be carried out to follow- up significant sulphide mineralization

intersected in 2016 at the following zones (see News Releases dated October 12, 2016; October 26,

2016; October 31, 2016; and November 16, 2016):

P-058 (Fossilik)

MQ-16-105: 10.20 metres of 3.41% Ni, 0. 28% Cu, 0.10% Co and 0.13 g/t Pt+Pd+Au

P-013 SE

MQ-16-109: 13.35 metres of 2.88% Ni, 0. 80% Cu, 0.06% Co and 0.46 g/t Pt+Pd+Au

Mikissoq (IHC)

MQ-16-117: 74.05 metres of 1.08% Ni, 0. 54% Cu, 0.03% Co and 0.11 g/t Pt+Pd+Au

Spotty Hill (IHC)

MQ-16-121: 4.75 metres of 1.59% Ni, 0.30% Cu, 0.04% Co and 0.66 g/t Pt+Pd+Au

The Company’s exploration base camp on Puiattoq Bay was re-opened in late May and early June.

Equipment and work crews have mobilized to site an d drilling is now underway with two drill rigs. A third

drill rig was also mobilized to site and is expected to begin operation in late July. The field program is

estimated to extend to mid-September.

Surveys in support of an Environmental and Social Impact Assessment are ongoing and a requirement

for an Exploitation Licence for the Maniitsoq proper ty, will commence in June in the areas of active

exploration. This will include the recently acqui red watershed 06.H current ly being assessed for the

potential to develop a hydropower resource consistent with the emphasis by the Greenland Government

on securing environmentally friendly energy sources for any industrial development, including mining (see

News Release dated March 29, 2017).

About North American Nickel

North American Nickel is a mineral exploration co mpany with 100% owned properties in Maniitsoq,

Greenland and Sudbury, Ontario.

The Maniitsoq property in Greenland is a Camp scale project comprising 2,985 square km covering

numerous high-grade nickel-copper sulphide occu rrences associated with norite and other mafic-

ultramafic intrusions of the Greenland Norite Belt (GNB). The >75km-long belt is situated along, and near,

the southwest coast of Greenland ac cessible from the existing Seqi deep water port (See NAN News

Release dated January 19, 2015) with an all year r ound shipping season and abundant hydro-electric

potential.

The Post Creek/Halcyon property in Sudbury is strategically located adjacent to the past producing

Podolsky copper-nickel-platinum group metal deposit of KGHM International Ltd. The property lies along

the extension of the Whistle Offset dyke structure. Such geological structures host major Ni-Cu-PGM

deposits and producing mines within the Sudbury Camp.

Cautionary Note Regarding Forward-looking Statements

This press release contains certain "forward-looking statements" and "forward-looking information" under

applicable securities laws concerning the business, operations and financial performance and condition of

the Company. Forward-looking statements and forward-looking information include, but are not limited to,

statements with respect to the succ ess of exploration activities; impa ct of mineralogy, estimation of

mineral resources at mineral projects of the Compan y; the future economics of minerals including nickel

and copper; synergies and financial impact facilities; the benefits of the development potential of the

properties of the Company and currency exchange rate fluctuations. Except for statements of historical

fact relating to the Company, certain information contained herein constitutes forward-looking statements.

Forward-looking statements are frequently characterize d by words such as "plan," "expect," "project,"

"intend," "believe," "anticipate", "est imate" and other similar words, or statements that certain events or

conditions "may" or "will" occur. Forward-looking statements are based on the opinions and estimates of

management at the date the statements are made, and are based on a number of assumptions and

subject to a variety of risks and uncertainties and other factors that could cause actual events or results to

differ materially from those projected in the forwar d-looking statements. Many of these assumptions are

based on factors and events that are not within th e control of the Company and there is no assurance

they will prove to be correct.

Factors that could cause actual results to vary materially from results anticipated by such forward-looking

statements include variations in metal grades, changes in market conditions, variations in recovery rates,

risks relating to international operations, fluctuatin g metal prices and currency exchange rates, and other

risks of the mining industry, including but not limited to the failure of plant, equipment or processes to

operate as anticipated. The Company cautions that the foregoing list of important factors is not

exhaustive. Investors and others who base themselves on forwar d-looking statements should carefully

consider the above factors as well as the uncertaint ies they represent and the risk they entail. The

Company believes that the expectations reflected in those forward-looking st atements are reasonable,

but no assurance can be given that these expectations will prove to be correct and such forward-looking

statements included in this press release should not be unduly relied upon. These statements speak only

as of the date of this press release. The Compan y undertakes no obligation to update forward-looking

statements if circumstances or management's estimates or opinions should change except as required by

applicable securities laws.

Although the Company has attempted to identify important factors that could cause actual actions, events

or results to differ materially from those descri bed in forward-looking statements, there may be other

factors that cause action s, events or results not to be anticipat ed, estimated or intended. Statements

concerning mineral reserve and resource estimates may also be deemed to constitute forward-looking

statements to the extent they in volve estimates of the mineralizat ion that will be encountered if the

property is developed.

Statements about the Company's futu re expectations and all other statem ents in this press release other

than historical facts are "forward lo oking statements" within the meaning of Section 27A of the Securities

Act of 1933, Section 21E of the Securities Exchange Act of 1934 and as that term defined in the Private

Litigation Reform Act of 1995. The Company intends t hat such forward-looking statements be subject to

the safe harbours created thereby. Since these statements involve risks and uncertainties and are subject

to change at any time, the Company's actual result s may differ materially from the expected results . For

further information on the project, please see National Instrument 43-101 (NI 43-101) technical report

prepared by SRK Consulting (Canada) In c. (SRK) dated effective March 24 th, 2016, titled “Independent

Technical Report for the Maniitsoq Nickel-Cop per-PGM Project, Greenland”, available under the

Company's profile at www.sedar.com or at www.northamericannickel.com.

ON BEHALF OF THE BOARD OF DIRECTORS

Mark Fedikow

President

North American Nickel Inc.

For more information contact:

North American Nickel Inc.

Jaclyn Ruptash

Corporate Communications

(604) 770-4334

Toll free: 1-866-816-0118

Neither the TSX Venture Exchange nor its Regulation Se rvices Provider (as that term is defined in the

policies of the Exchange) accepts responsibility for the adequacy or accuracy of this release.