Treasury Metals Announces New Discoveries on Goliath Gold Complex
Treasury Metals Announces New Discoveries
on Goliath Gold Complex
TSX: TML OTCQX: TSRMF
New gold discovery at Ocelot target, as well as positive gold results from Fold Nose and Far
East.
Highlights:
Far East hole TL21-568 with 6.95 g/t Au over 1.0 metre from 86.0 to 87.0 metres
downhole and 0.51 g/t Au over 13.5 metres from 172.5 to 186.0 metres downhole.
Fold Nose hole TL21-578 with 0.54 g/t Au over 7.5 metres including 1.24 g/t Au over 1.5
metres from 170.0 to 177.5 metres downhole.
Fold Nose hole TL21-576 with 0.23 g/t Au over 28.0 metres from 100.0 to 128.0 metres
downhole.
Ocelot hole OC-21-003 with 0.92 g/t Au over 2.0 metres from 79.0 to 81.0 metres
downhole on a new target identified by Treasury Metals Geology team.
TORONTO
,
Feb. 17, 2022
/CNW/ -
Treasury Metals Inc.
(TSX: TML) (OTCQX: TSRMF)
("
Treasury
" or the "
Company
") is pleased to announce results on three exploration targets tested
during the 2021 drill campaign. Gold was discovered at the Ocelot target for the first time, and
positive gold results were encountered in new drillholes at the previously identified Far East and Fold
Nose mineralizations. These successes are part of Treasury's 2021/2022 discovery program,
supporting the development of the Goliath, Goldlund and Miller resources, and confirm our belief that
Treasury's land position will continue to deliver new discoveries.
The targets have assays pending, and all three are open at depth. The Ocelot discovery is one of a
series of geophysical anomalies on the Goldlund structural trend northeast of the Goldlund deposit,
undrilled prior to the 2021 campaign.
Jeremy Wyeth
, President and CEO of Treasury Metals, commented: "I am very pleased to see
positive results coming back on all of these three exploration targets. In 2021, we re-established a
discovery drilling program focusing on identifying new targets for the first time since 2012 on Goliath
and 2018 on Goldlund. Today's discovery at Ocelot, with a number of new targets being drilled in
early 2022, coupled with more gold results from Fold Nose and Far East, show the first-class
exploration potential on Treasury's large land position, close to the planned processing facilities,
which will be described in the Pre- Feasibility Study slated for later in the year."
Ocelot
During the 2021 drill campaign, the Company tested two Wild Cat targets on the Goldlund structural
trend northeast of the Goldlund deposit. These targets were based on a series of geophysical
anomalies with similar footprints to the Goldlund and Miller Deposits and sit located between the two
deposits (Figure 1). Results released today are from four holes (897 metres) testing the Ocelot
target over a strike length of 800 metres. From the logging and assay results, the Company believes
this area hosts geology and mineralization similar to Zone 4 at Goldlund where a network of
porphyry dykes creates a competency contrast allowing mineralizing fluids to penetrate in and
adjacent to these dykes (Figure 2). Initial results are promising, showing mineralizing fluids two
kilometres away from the Goldlund Deposit. Additional work is needed to determine the potential for
more significant width or grade of mineralization. Results are pending on the second target, Caracal,
but logging for that target showed geology more similar to Zone 1, Zone 7 and Zone 2/3 at
Goldlund.
Figure 1: Location of Wild Cat Exploration Targets (CNW Group/Treasury Metals Inc.)
Figure 2:
Map of Ocelot Exploration Target Results (CNW Group/Treasury Metals Inc.)
Far East
Located approximately 8km to East of the Goliath Deposit, the Far East target was based on
geophysical trends that were first identified in 2011. The Company completed a four-hole test
program on the target in 2012, with the last hole intersecting Goliath-style host rock, alteration and
mineralization. With a renewed focus on growth through exploration the Company completed a six-
hole (1,998 metres) initial program to test the continuity and get a better understanding of the
geology in the area. The mineralization was found within felsic to intermediate volcanic rocks and
associated with disseminated pyrite and trace sphalerite, both of which are characteristic of the
Goliath deposit. Elevated results also correspond near and along the boundary of felsic porphyry
intrusions. While not directly associated with Goliath mineralization, deformed porphyries are
commonly identified in the hanging wall sediments above the deposit and could have played a role in
fluid movement and the original emplacement of gold. Results are pending for the final two drillholes
of the initial program. Once received, the program results will be analyzed and additional drillholes
will be designed to further develop our understanding of this prospective target.
Figure 3: General Location of Far East and Fold Nose (CNW Group/Treasury Metals Inc.)
Figure 4: Map with Goliath Exploration Targets, Mineralization Wireframes and Geophysics (CNW
Group/Treasury Metals Inc.)
Figure 5: Far East Results (CNW Group/Treasury Metals Inc.)
Highlights from the Far East include hole TL21-568, which intersected 1.0 metre grading 6.95 g/t Au
and 13.5 metres grading 0.51 g/t Au (Figure 5). The porphyry dykes noted in logging of this Far East
drill program may indicate that this mineralization is related to the hanging wall mineralization at
Goliath and therefore the geology team will review the positions for follow up drilling to expand the
potential for Goliath Main Zone type of mineralization to the northwest of these results.
Fold Nose
The Company completed a ten-hole (2,868 metre) drill program on the Fold Nose exploration area in
2021. This program was designed to aid in the geological understanding of the area. The geology
team has been working to develop a geological model for the area and work is underway to
constrain the controls on the higher-grade mineralization. The geology team sees that the host
stratigraphy for the Goliath Deposit continues to the east and into the Fold Nose target area. The
primary low-grade VMS stratigraphically-contained mineralization appears to be continuous from the
Goliath Deposit to the east into the Fold Nose. The team has been able to model the fold geometry
using structural measurements from surface mapping and host lithology marker horizons (Figure 4).
Treasury is pleased to see the continuity of the primary low-grade VMS stratigraphically-contained
mineralization, hole TL21-576 intercepted several wide lower-grade zones including 28.0 metres
grading 0.23 g/t Au. Also, hole TL21-578 also intersected wide lower-grade zones including 7.5
metres grading 0.54 g/t Au and 33.1 metres grading 0.13 g/t Au.
The 2021 and 2022 drill campaigns are focused on unlocking the control of the higher-grade
mineralization in the area. Our current theory for the control of the higher-grade mineralization is that
it is related to stacked vein sets noted by geologists on surface and in core. Results from the 2021
drill program at the Fold Nose will help to increase the understanding of the controls on
mineralization in this area. The company also plans to do detailed geological mapping in the Fold
Nose to confirm the orientation of the quartz veins in the summer of 2022.
Figure 6:
Fold Nose Results (CNW Group/Treasury Metals Inc.)
Table
1
: New Significant Gold Intercepts from Recent Drilling
Far East
Drill Hole
Target
From (m)
To (m)
Sample Length (m)
Grade g/t Au
TL21-568
Far East
86.00
87.00
1.00
6.95
TL21-568
Far East
172.50
186.00
13.50
0.51
TL21-569
Far East
271.80
278.00
6.20
0.72
TL21-571
Far East
158.00
159.00
1.00
2.08
TL21-572
Far East
132.00
140.00
8.00
0.38
Including
132.00
133.00
1.00
2.33
Fold Nose
Drill Hole
Target
From (m)
To (m)
Sample Length (m)
Grade g/t Au
TL21-576
Fold Nose
53.00
66.00
12.00
0.21
Including
53.00
58.00
5.00
0.37
And including
53.00
54.00
1.00
1.35
TL21-576
Fold Nose
81.00
84.00
3.00
0.66
TL21-576
Fold Nose
100.00
128.00
28.00
0.23
Including
100.00
105.80
5.80
0.39
TL21-576
Fold Nose
160.00
169.00
9.00
0.21
Including
164.00
168.00
4.00
0.36
TL21-578
Fold Nose
58.00
62.60
4.60
0.17
TL21-578
Fold Nose
170.00
177.50
7.50
0.54
Including
173.00
174.50
1.50
1.24
TL21-578
Fold Nose
211.00
220.00
9.00
0.34
TL21-578
Fold Nose
241.00
247.00
6.00
0.33
TL21-578
Fold Nose
301.50
334.60
33.10
0.13
Including
325.50
334.60
9.10
0.22
Ocelot
Drill Hole
Target
From (m)
To (m)
Sample Length (m)
Grade g/t Au
OC-21-001
Ocelot
71.00
72.00
1.00
1.08
OC-21-002
Ocelot
57.00
58.00
1.00
0.24
OC-21-003
Ocelot
79.00
81.00
2.00
0.92
OC-21-004
Ocelot
137.00
140.00
3.00
0.49
OC-21-004
Ocelot
219.00
220.00
1.00
1.27
Note: Reported intervals are drilled core lengths and do not indicate true widths. For duplicate samples, the original sample assays are used to calculate the intersection grade. All
grades are un-capped.
QA / QC
The Company has implemented a quality assurance and quality control (QA/QC) program to ensure
sampling and analysis of all exploration work is conducted in accordance with the CIM Exploration
Best Practices Guidelines. The drill core is sawn in half with one-half of the core sample dispatched
to Activation Laboratories Ltd. facility located in
Dryden, Ontario
. The other half of the core is
retained for future assay verification and/or metallurgical testing. Other QA/QC procedures include
the insertion of blanks and Canadian Reference Standards for every tenth sample in the sample
stream. A quarter core duplicate is assayed every 20
th
sample. The laboratory has its own QA/QC
protocols running standards and blanks with duplicate samples in each batch stream. Additional
checks are routinely run on anomalous values including gravimetric analysis and pulp metallic screen
fire assays. Gold analysis is conducted by lead collection, fire assay with atomic absorption and/or
gravimetric finish on a 50-gram sample. Check assays are conducted at a secondary ISO certified
laboratory (in this case AGAT Laboratories located in
Mississauga, Ontario
) following the completion
of a program.
Qualified
Persons
Maura Kolb
, M.Sc., P.Geo., Director of Exploration and
Adam Larsen
, P. Geo., Exploration
Manager, are both considered as a "Qualified Person" for the purposes of National Instrument 43-
101 Standards of Disclosure for Mineral Projects ("
NI 43-101
"), and have reviewed and approved
the scientific and technical disclosure contained in this news release on behalf of Treasury.
About Treasury Metals Inc.
Treasury Metals Inc. is a gold focused company with assets in
Canada
. Treasury's Goliath Gold
Complex, which includes the Goliath, Goldlund and Miller deposits, is located in
Northwestern
Ontario
. The deposits benefit substantially from excellent access to the Trans-Canada Highway,
related power and rail infrastructure, and close proximity to several communities including
Dryden,
Ontario
. The Company also owns several other projects throughout
Canada
, including the Lara
Polymetallic Project, Weebigee-Sandy Lake Gold Project JV, and grassroots gold exploration
property Gold Rock. Treasury Metals is committed to inclusive, informed and meaningful dialogue
with regional communities and Indigenous Nations throughout the life of all our Projects and on all
aspects, including: creating sustainable economic opportunities, providing safe workplaces,
enhancing of social value, and promoting community well-being.
For information on the Goliath Gold Complex, please refer to the preliminary economic assessment,
prepared in accordance with NI43–101, entitled "NI 43–101 Technical Report & Preliminary
Economic Assessment of the Goliath Gold Complex: and dated
March 10, 2021
with an effective
date of
January 28, 2021
, led by independent consultants Ausenco Engineering Canada Inc. The
technical report is available on SEDAR at
www.sedar.com
, on the OTCQX at
www.otcmarkets.com
and on the Company website at
www.treasurymetals.com
.
To view further details about Treasury, please visit the Company's website at
www.treasurymetals.com
.
Neither the TSX nor its Regulation Services Provider (as that term is defined in the policies of the
TSX) accepts responsibility for the adequacy or accuracy of this release.
Forward-Looking Statements
This release includes certain statements that may be deemed to be "forward-looking statements".
All statements in this release, other than statements of historical facts, that address events or
developments that management of the Company expect, are forward-looking statements. Forward-
looking statements are frequently, but not always, identified by words such as "expects",
"anticipates", "believes", "plans", "projects", "intends", "estimates", "envisages", "potential",
"possible", "strategy", "goals", "objectives", or variations thereof or stating that certain actions,
events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the
negative of any of these terms and similar expressions. Actual results or developments may differ
materially from those in forward-looking statements. Treasury disclaims any intention or obligation
to update or revise any forward-looking statements, whether as a result of new information, future
events or otherwise, save and except as may be required by applicable securities laws.
Since forward-looking information address future events and conditions, by their very nature they
involve inherent risks and uncertainties. Actual results could differ materially from those currently
anticipated due to a number of factors and risks. These include, but are not limited to, exploration
and production for precious metals; delays or changes in plans with respect to exploration or
development projects or capital expenditures; the uncertainty of resource estimates; health, safety
and environmental risks; worldwide demand for gold and base metals; gold price and other
commodity price and exchange rate fluctuations; environmental risks; competition; incorrect
assessment of the value of acquisitions; ability to access sufficient capital from internal and
external sources; and changes in legislation, including but not limited to tax laws, royalties and
environmental regulations.
Actual results, performance or achievement could differ materially from those expressed in, or
implied by, the forward-looking information and, accordingly, no assurance can be given that any
of the events anticipated by the forward-looking information will transpire or occur, or if any of
them do so, what benefits may be derived therefrom and accordingly, readers are cautioned not to
place undue reliance on the forward-looking information.
Note to United States Investors
All resource estimates included in this press release have been prepared in accordance with
Canadian standards, which differ in some respects from
United States
standards. In particular, and
without limiting the generality of the foregoing, the terms "inferred mineral resources," "indicated
mineral resources," "measured mineral resources" and "mineral resources" that may be used or
referenced are Canadian mining terms as defined in accordance with National Instrument 43 101 –
Standards of Disclosure for Mineral Projects under the guidelines set out in the Canadian Institute
of Mining, Metallurgy and Petroleum (the "CIM") Standards on Mineral Resources and Mineral
Reserves (the "CIM Standards"). The CIM Standards differ significantly from standards in
the
United States
. While the terms "mineral resource," "measured mineral resources," "indicated
mineral resources," and "inferred mineral resources" are recognized and required by Canadian
regulations, they are not defined terms under standards in
the United States
. "Inferred mineral
resources" have a great amount of uncertainty as to their existence, and great uncertainty as to
their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral
resource will ever be upgraded to a higher category. Under Canadian securities laws, estimates of
inferred mineral resources may not form the basis of feasibility or other economic studies.
Readers are cautioned not to assume that all or any part of measured or indicated mineral
resources will ever be converted into reserves. Readers are also cautioned not to assume that all
or any part of an inferred mineral resource exists or is economically or legally mineable.
Disclosure of "contained ounces" in a resource is permitted disclosure under Canadian
regulations; however,
United States
companies are only permitted to report mineralization that
does not constitute "reserves" by standards in
the United States
as in place tonnage and grade
without reference to unit measures. Accordingly, information regarding resources contained or
referenced in this [name of disclosure document] containing descriptions of our mineral deposits
may not be comparable to similar information made public by
United States
companies.
SOURCE
Treasury Metals Inc.
View original content to download multimedia:
http://www.newswire.ca/en/releases/archive/February2022/17/c8394.html
%SEDAR: 00027114E
For further information:
Jeremy Wyeth, President & CEO, T: +1 416 214 4654; Orin Baranowsky,
CFO, T: +1 416 214 4654, Email: [email protected]; Twitter @TreasuryMetals
CO: Treasury Metals Inc.
CNW 07:25e 17-FEB-22