Nevada Sunrise Receives Additional Lithium Analyses - GEM23-04 Mineralization Improves to 1,412 ppm Lithium in Sediments over 1,440 Feet and up to 490 mg/L Lithium in Groundwater at the Gemini Lithium Project, Nevada
Nevada Sunrise Receives Additional Lithium
Analyses - GEM23-04 Mineralization Improves
to 1,412 ppm Lithium in Sediments over 1,440
Feet and up to 490 mg/L Lithium in
Groundwater at the Gemini Lithium Project,
Nevada
VANCOUVER, BC
,
March 28, 2023
/CNW/ -
Nevada Sunrise Metals Corp.
("Nevada Sunrise", or
the "Company") (TSXV: NEV) (OTC: NVSGF) is pleased to announce that the Company has
received final geochemical analyses for lithium mineralization in sediment and groundwater samples
collected from borehole GEM23-04, drilled at its 100%-owned Gemini Lithium Project ("Gemini")
located in the Lida Valley basin in
Esmeralda County, Nevada
. Drilling of borehole GEM23-04 was
completed to a depth of 1,950 feet (594.51 metres), which represents the deepest hole drilled to
date at Gemini.
Highlights of GEM23-04
Borehole
GEM23-04
intersected
1,412.38 parts per million ("ppm") lithium-in-sediment over
1,440 feet
(439.02 metres) from 510 feet (155.49 metres) to 1,950 feet (594.51 metres),
including
3,556.82 ppm lithium over 110 feet
(33.54 metres) and
4,329.60 ppm lithium over
30 feet
(9.15 metres) (see Table 1 below);
Water sample analyses showed additional concentrations of lithium in groundwater flows,
notably a 20 foot (6.1 metre) interval grading
490
milligrams/litre ("mg/L") lithium
(see Table
2 below);
Table 1. Final Results of Lithium-in-Sediment Samples for Borehole GEM23-04
Gemini Lithium Project - GEM23-04
Sediment Sample Results
Interval
Thickness
Lithium
(Weighted
average:
ppm)
From
To
From
To
Feet
Metres
(feet)
(feet)
(metres)
(metres)
510
1950
155.49
594.51
1440
439.02
1,412.38
including:
1270
1380
387.20
420.73
110
33.54
3,556.82
including:
1350
1380
411.59
420.73
30
9.15
4,329.60
and:
1,500
1,950
457.32
585.37
450
137.20
1,665.45
including:
1,520
1,650
463.41
503.05
130
39.63
3,004.58
including:
1,550
1,590
472.56
484.76
40
12.20
3,453.98
Note:
Sediment samples are a composite of material collected from the rotary splitter in
the
reverse circulation ("RC")
drilling rig, which produces a continuous, representative 3
to 5 kilogram sample for each sample interval.
All depth measurements reported, including sample and interval widths are down-hole. As holes
at Gemini
are oriented vertical
and geologic stratigraphy is primarily horizontal to sub-horizontal, downhole measurements are assumed to be close to true thickness.
Table 2: Final Results of Lithium-in-Water Samples for Borehole GEM23-04
Gemini Lithium Project -
GEM23-04 Water Sample Results
Interval
Thickness
Average
From (ft.)
To
(ft.)
From (m)
To (m)
Feet
Metres
Lithium
(mg/L)
1,200
1,340
365.85
408.54
140
42.68
116.43
including:
1,200
1,220
365.85
371.95
20
6.1
180
and:
1,260
1,280
384.15
390.24
20
6.1
230
and:
1,320
1,340
402.44
408.54
20
6.1
200
AND:
1,520
1,540
463.41
469.51
20
6.1
250
AND:
1,620
1,680
493.90
512.20
60
18.29
180.67
including:
1,660
1,680
506.10
512.20
20
6.1
320
AND:
1,780
1,880
542.68
573.17
100
30.49
199.64
including:
1,780
1,800
542.68
548.78
20
6.1
340
and:
1,820
1,840
554.88
560.98
20
6.1
340
and:
1,860
1,880
567.07
573.17
20
6.1
310
AND:
1920
1940
585.37
591.46
20
6.1
490
GEM23-04
was completed at a location approximately 0.73 miles (1.17 kilometres) southwest of
GEM22-01 and 0.65 miles (1.04 kilometres) northwest of GEM22-02, thereby successfully
extending the lithium mineralized zone at Gemini to the west. The Phase 2 drilling program at Gemini
continues with borehole GEM23-05, currently at a depth of approximately 1,510 feet (460.37
metres) as of
March 27, 2023
, collared approximately 1.04 miles (1.67 kilometres) southeast of
borehole GEM23-04, and 0.52 miles (0.83 kilometres) south of borehole GEM22-02.
Gemini Lithium Project Borehole Locations, February-March 2023 (CNW Group/Nevada Sunrise
Metals Corporation)
To date, the Company has intersected significant intervals of lithium mineralization both in sediments
and groundwater in all four holes completed since the inception of drilling, and continues to intersect
the clay layers and groundwater flows that could host additional lithium mineralization. Nevada
Sunrise believes that the southern and western parts of the Gemini basin are highly prospective for
lithium mineralization and that further drilling could eventually define a large lithium resource. The
Company is enacting its exploration plan to drill deeper holes at Gemini with the goal of: (1)
intersecting wide intervals of lithium-bearing sediments and (2) locating higher concentrations of
lithium-in-water coincident with significant groundwater flow rates.
About the 2022-2023 Gemini Drilling Program
In March and
April 2022
, Nevada Sunrise drilled two RC boreholes for a total of 2,020 feet (615.85
metres) in its maiden drilling program at Gemini. The drill sites were located within a defined gravity
low that hosts conductive layers detected by historical ground electromagnetic surveys. The results
from the first two holes at Gemini represented a new discovery of lithium-bearing sediments and
lithium-in-water in the western Lida Valley, which was not historically drill tested for lithium
mineralization (see Nevada Sunrise news releases dated
May 18, 2022
and
June 6, 2022
).
Borehole GEM22-03, drilled to 1,620 feet (493.9 metres) intersected the same sequence of volcanic
ash sediments as was found in GEM22-01 and GEM22-02, and similar geologic formations are
observed in borehole GEM23-04, and GEM23-05, still in progress.
In
July 2022
, Nevada Sunrise received a permit for an expanded drilling area from the Bureau of
Land Management (the "BLM") good until
July 2024
and began Phase 2 drilling at Gemini in October
2022.
For further information on Gemini, including drill hole location maps and photos
click here
.
About Gemini
Gemini consists of 582 unpatented placer and lode claims located in the western Lida Valley,
Esmeralda County
, approximately 6 miles (10 kilometres) east of the town of Lida,
Nevada
. The
Lida Valley is a flat, arid basin with a similar geological setting to the better-known
Clayton Valley
basin where Albemarle Corporation operates the Silver Peak lithium brine mine, which has operated
continuously since 1966.
Gemini is situated adjacent to the Gold Point Solar Energy Zone, a Bureau of Land Management
land reserve set aside for solar and wind power generation projects until 2033. Exploration at
Gemini is complemented by the Company's 80.09 acre/feet/year water right, a pre-requisite for the
exploration and development of lithium brine projects in
Nevada
.
Sampling and Analytical QA/QC and Statement of Qualified Person
Sediment Sample Collection and Analysis
Sediment samples described in this new release are a composite of material collected from the
rotary splitter in the RC drilling rig, which produces a continuous, representative 3 to 5 kilogram
sample for each sample interval. Samples were submitted to American Assay and ALS Global
USA
in
Reno, NV
and were analyzed utilizing a multi-element ICP-AES method. Specifically, the analytical
method involves aqua regia digestion of the sample followed by the inductively coupled plasma (ICP)
technique to ionize the sample, and atomic emission spectrometry (AES) to determine elemental
concentrations. Duplicates, field blanks, and certified reference standards were inserted at regular
intervals in the sample stream to ensure accuracy of the analytical method.
Water Sample Collection and Analysis
Water parameters including TDS, conductivity, temperature, and pH values were obtained in the field
by direct measurement with a handheld YSI556 Multi-parameter water meter, which meets Good
Laboratory Practice (as proscribed by the Organization for Economic Cooperation and
Development) for calibration and measurement.
Groundwater samples were collected at 20-foot (6.1-metre) intervals and sent to Western
Environmental Testing Laboratory in
Reno
, Nevada under project chain-of-custody protocols for
analysis. Industry standard methods for examination of water are employed by the laboratory.
General chemistry testing may include analysis for specific gravity, total hardness, total alkalinity,
bicarbonate, carbonate, hydroxide, total dissolved solids (TDS) and electrical conductivity. Lithium is
analyzed by inductively coupled plasma-optical emission spectroscopy (ICP-OES) methods.
The scientific and technical information contained in this news release has been reviewed and
approved by
Robert M. Allender, Jr.
, CPG, RG, SME and a Qualified Person for Nevada Sunrise as
defined in National Instrument 43-101 –
Standards of Disclosure
for Mineral Projects
.
About Nevada Sunrise
Nevada Sunrise is a junior mineral exploration company with a strong technical team based in
Vancouver, BC
,
Canada
, that holds interests in gold, copper, cobalt and lithium exploration projects
located in the
State of Nevada, USA
.
Nevada Sunrise owns 100% interests in the Gemini,
Jackson Wash
and Badlands lithium projects, all
of which are located in the Lida Valley in
Esmeralda County, NV.
The Company owns Nevada water
right Permit 86863, also located in the Lida Valley basin, near Lida, NV.
The Company's key gold asset is a 20.01% interest in a joint venture at the Kinsley Mountain Gold
Project near
Wendover, NV
with Copaur Minerals Inc.
Kinsley Mountain
is a Carlin-style gold project
hosting a National Instrument 43-101 compliant gold resource consisting of
418,000 indicated
ounces of gold grading 2.63 g/t Au (4.95 million tonnes), and 117,000 inferred ounces of gold
averaging 1.51 g/t Au (2.44 million tonnes), at cut-off grades ranging from 0.2 to 2.0 g/t Au
1
.
1
Technical Report on the Kinsley Project, Elko County, Nevada, U.S.A., dated June 21, 2021 with an effective date of May 5, 2021 and prepared by Michael M. Gustin, Ph.D., and
Gary L. Simmons, MMSA and filed under New Placer Dome Gold Corp.'s Issuer Profile on SEDAR (
www.sedar.com
).
Nevada Sunrise has the right to earn a 100% interest in the Coronado VMS Project, located
approximately 48 kilometers (30 miles) southeast of
Winnemucca, NV.
The Company owns a 15%
interest in the historic Lovelock Cobalt Mine and the Treasure Box copper properties, each located
approximately 150 kilometers (100 miles) east of
Reno, NV
, with Global Energy Metals Corp.
holding an 85% participating interest.
FORWARD LOOKING STATEMENTS
This release may contain forward-
looking statements. Forward looking statements are statements
that are not historical facts and are generally, but not always, identified by the words "expects",
"plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar
expressions, or that events or conditions "will", "would", "may", "could" or "should" occur and
include disclosure of anticipated exploration activities. Although the Company believes the
expectations expressed in such forward-
looking statements are based on reasonable assumptions,
such statements are not guarantees of future performance and actual results may differ materially
from those in forward looking statements. Forward-
looking statements are based on the beliefs,
estimates and opinions of the Company's management on the date such statements were made.
The Company expressly disclaims any intention or obligation to update or revise any
forward-
looking statements whether as a result of new information, future events or otherwise.
Such factors include, among others, risks related to the results and outcomes of the Company's
2022-2023 exploration plans at the Gemini Lithium Project; reliance on technical information
provided by third parties on any of our exploration properties; changes in project parameters as
plans continue to be refined; current economic conditions; future prices of commodities; possible
variations in grade or recovery rates; failure of equipment or processes to operate as anticipated;
the failure of contracted parties to perform; labor disputes and other risks of the mining industry;
delays due to pandemic; delays in obtaining governmental approvals, financing or in the
completion of exploration, as well as those factors discussed in the section entitled "Risk Factors"
in the Company's Management Discussion and Analysis for the Three Months ending
December
31, 2022
, which is available under Company's SEDAR profile at
www.sedar.com
.
Although Nevada Sunrise has attempted to identify important factors that could cause actual
actions, events or results to differ materially from those described in forward-looking information,
there may be other factors that cause actions, events or results not to be as anticipated, estimated
or intended. There can be no assurance that such information will prove to be accurate as actual
results and future events could differ materially from those anticipated in such statements. Nevada
Sunrise disclaims any intention or obligation to update or revise any forward-looking information,
whether as a result of new information, future events or otherwise. Accordingly, readers should not
place undue reliance on forward-looking information.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined
in the policies of TSX Venture Exchange) accepts responsibility for the adequacy or
accuracy of this release.
SOURCE
Nevada Sunrise Metals Corporation
View original content to download multimedia:
http://www.newswire.ca/en/releases/archive/March2023/28/c7256.html
%SEDAR: 00026824E
For further information:
Warren Stanyer, President and Chief Executive Officer, email:
[email protected], Telephone: (604) 428-8028 or Jason Powell, Corporate
Communications, email: [email protected], Telephone: (604) 779-6497
CO: Nevada Sunrise Metals Corporation
CNW 07:30e 28-MAR-23