Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NEV.V ·

Nevada Sunrise Engages McClelland Laboratories Inc. for the Gemini Lithium Project

Corporate Updates

Nevada Sunrise Engages McClelland

Laboratories Inc. for the Gemini Lithium

Project

VANCOUVER, BC

,

Jan. 30, 2023

/CNW/ -

Nevada Sunrise Metals Corp.

("Nevada Sunrise", or the

"Company", formerly Nevada Sunrise Gold Corp.) (TSXV: NEV) (OTC: NVSGF) is pleased to

announce that it has contracted McClelland Laboratories Inc. of

Sparks, NV

("MLI") to perform

metallurgical leach tests on samples of lithium mineralization intersected by the Company at the

Gemini Lithium Project ("Gemini", or the "Project") in

Esmeralda County

, Nevada. Gemini is located

in the Lida Valley, approximately 25 miles (38 kilometres) southwest of the only producing lithium

mine in

the United States

at Silver Peak,

Nevada

.

"Nevada Sunrise looks forward to the ongoing collaboration between MLI and our

Nevada

-based

metallurgical consultant, Mr.

Willem Duyvesteyn

", said

Warren Stanyer

, President and CEO of

Nevada Sunrise. "We anticipate that the work of MLI's technical team will provide critical information

about the lithium mineralization and extractability from sample material generated during our

2022 drilling campaign, to help guide future exploration and development at Gemini."

MLI has offered metallurgical, environmental, analytical testing and consulting services to the mineral

exploration industry since 1987 and operates an ISO 17025 accredited facility that provides quality

laboratory services during all phases of project development and operation. Willem Duyvesteyn,

M.Sc., is renowned as an innovator in his field of and is the primary inventor and author of over 100

patents for mineral and hydrocarbon extractive technologies, including numerous applications for the

extraction and leaching of metals and minerals from ores, brines, and solutions (see Nevada Sunrise

news release dated

November 15, 2022

).

About Gemini

Gemini consists of 582 unpatented placer and lode claims (covering about nine square miles)

located in the western Lida Valley,

Esmeralda County

, approximately 6 miles (10 kilometres) east of

the town of Lida,

Nevada

. The Lida Valley is a flat, arid basin with a similar geological setting to the

better-known

Clayton Valley

basin where Albermarle Corporation operates the Silver Peak lithium

brine mine, which has operated continuously since 1966.

Gemini is situated adjacent to the Gold Point Solar Energy Zone, a Bureau of Land Management

land reserve set aside for solar and wind power generation projects until 2033. Exploration at

Gemini is complemented by the Company's 80.09 acre/feet/year water right, a pre-requisite for the

exploration and development of lithium brine projects in

Nevada

. Under the laws of

Nevada

, water

cannot be pumped from a subterranean source without a valid water permit.

In

March 2022

, Nevada Sunrise began drilling geophysical targets at Gemini and intersected

significant zones of lithium mineralization in sediment and groundwater in the first two holes (see

Nevada Sunrise news release dated

June 6, 2022

). Drilling continues in 2023 with a Phase 2 drilling

program of up to six additional holes. Final geochemical analyses for lithium-in-sediments and

groundwater are pending for hole GEM23-03, which was completed in

mid-December 2022

.

The scientific and technical information contained in this news release has been reviewed and

approved by

Robert M. Allender, Jr.

, CPG, RG, SME and a Qualified Person for Nevada Sunrise as

defined in National Instrument 43-101 –

Standards of Disclosure

for Mineral Projects

.

About Nevada Sunrise

Nevada Sunrise is a junior mineral exploration company with a strong technical team based in

Vancouver, BC

,

Canada

, that holds interests in lithium, gold, copper and cobalt exploration projects

located in the

State of Nevada, USA

.

Nevada Sunrise owns 100% interests in the Gemini and

Jackson Wash

lithium projects, both of

which are located in

Esmeralda County, NV.

The Company owns Nevada water right Permit 86863,

located in the Lida Valley basin, near Lida, NV.

The Company's key gold asset is a 20.01% interest at the Kinsley Mountain Gold Project ("Kinsley

Mountain") near

Wendover, NV.

Kinsley Mountain

is a joint venture with Copaur Minerals Inc.

("Copaur"), following the completion of a plan of arrangement between Copaur and the Company's

former joint venture partner, New Placer Dome Gold Corp. Kinsley Mountain is a Carlin-style gold

project hosting a National Instrument 43-101 compliant gold resource consisting of

418,000

indicated ounces of gold grading 2.63 g/t Au (4.95 million tonnes), and 117,000 inferred

ounces of gold averaging 1.51 g/t Au (2.44 million tonnes), at cut-off grades ranging from 0.2

to 2.0 g/t Au

1

.

1

Technical Report on the Kinsley Project,

Elko County, Nevada

, U.S.A., dated

June 21, 2021

with

an effective date of

May 5, 2021

and prepared by

Michael M. Gustin

, Ph.D., and

Gary L.

Simmons

, MMSA and filed under New Placer Dome Gold Corp.'s Issuer Profile on SEDAR (

www.sedar.com

).

Nevada Sunrise has the right to earn a 100% interest in the Coronado VMS Project, located

approximately 48 kilometers (30 miles) southeast of

Winnemucca, NV.

The Company owns a 15%

interest in the historic Lovelock Cobalt Mine and the Treasure Box copper properties, each located

approximately 150 kilometers (100 miles) east of

Reno, NV

, with Global Energy Metals Corp.

holding an 85% participating interest.

FORWARD LOOKING STATEMENTS

This news release may contain forward

–

looking statements. Forward looking statements are

statements that are not historical facts and are generally, but not always, identified by the words

"expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar

expressions, or that events or conditions "will", "would", "may", "could" or "should" occur and

include disclosure of anticipated exploration activities. Although the Company believes the

expectations expressed in such forward

–

looking statements are based on reasonable

assumptions, such statements are not guarantees of future performance and actual results may

differ materially from those in forward looking statements. Forward

–

looking statements are based

on the beliefs, estimates and opinions of the Company's management on the date such statements

were made. The Company expressly disclaims any intention or obligation to update or revise any

forward

–

looking statements whether as a result of new information, future events or otherwise.

Such factors include, among others, risks related to the exploration plans at our

Nevada

lithium

projects; reliance on technical information provided by third parties on any of our exploration

properties; changes in project parameters as plans continue to be refined; current economic

conditions; future prices of commodities; possible variations in grade or recovery rates; failure of

equipment or processes to operate as anticipated; the failure of contracted parties to perform;

labor disputes and other risks of the mining industry; delays encountered due to pandemic; delays

in obtaining governmental approvals, financing, or in the completion of exploration, as well as

those factors discussed in the section entitled "Risk Factors" in the Company's Management

Discussion and Analysis for the Year Ended

September 30, 2022

, which is available under

Company's SEDAR profile at

www.sedar.com

.

Although Nevada Sunrise has attempted to identify important factors that could cause actual

actions, events or results to differ materially from those described in forward-looking information,

there may be other factors that cause actions, events or results not to be as anticipated, estimated

or intended. There can be no assurance that such information will prove to be accurate as actual

results and future events could differ materially from those anticipated in such statements. Nevada

Sunrise disclaims any intention or obligation to update or revise any forward-looking information,

whether as a result of new information, future events or otherwise. Accordingly, readers should not

place undue reliance on forward-looking information.

Neither TSX Venture Exc

hange nor its Regulation Services Provider (as that term is defined

in the policies of TSX Venture Exchange) accepts responsibility for the adequacy or

accuracy of this release.

SOURCE

Nevada Sunrise Gold Corporation

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/January2023/30/c5961.html

%SEDAR: 00026824E

For further information:

Warren Stanyer, President and Chief Executive Officer, Telephone: (604)

428-8028, email: [email protected]; Jason Powell, Corporate Communications,

Telephone: (604) 779-6497, email: [email protected]

CO: Nevada Sunrise Gold Corporation

CNW 07:30e 30-JAN-23