Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NEV.V ·

Nevada Sunrise Begins 2023 Drilling at the Gemini Lithium Project, Nevada

Exploration Programs

Nevada Sunrise Begins 2023 Drilling at the

Gemini Lithium Project, Nevada

VANCOUVER, BC

,

Jan. 17, 2023

/CNW/ -

Nevada Sunrise Metals Corp.

("Nevada Sunrise", or the

"Company", formerly Nevada Sunrise Gold Corp.) (TSXV: NEV) (OTC: NVSGF) is pleased to

announce that the Phase 2 drilling program has re-commenced at its 100%-owned Gemini Lithium

Project ("Gemini") located in the Lida Valley basin in

Esmeralda County, Nevada

. The first hole of

the Phase 2 program,

GEM22-03

, was completed in

December 2022

and drilling of the second

Phase 2 hole began in the second week of

January 2023

. Borehole

GEM23-04

is targeting a strong

conductive anomaly approximately 0.73 miles (1.17 kilometres) northwest of hole GEM22-02 and is

planned to test the deepest part of the Gemini basin to an estimated depth of 2,000 feet (609.75

metres).

Gemini Lithium Project:

Phase 2 Drilling Locations (CNW Group/Nevada Sunrise Metals Corporation)

Borehole

GEM22-03

was completed at a location approximately 0.47 miles (0.76 kilometres) north

of GEM22-01 and 1.14 miles (1.83 kilometres) north of GEM22-02. Basement rock was intersected

at 1,565 feet (477.3 metres) and the hole was stopped at 1,620 feet (494 metres) in a sedimentary

rock unit interpreted as the Emigrant Formation. This is the first known contact to basement in the

Gemini sedimentary basin, which greatly assists in the geological understanding of the Project.

Sampling of the lithium-bearing green clay layer began at 285 feet (86.89 metres) after the drill

passed through the surficial alluvium (sand and gravel) layer and a total of 186 sediment samples

were collected to the end of hole. An initial geochemical assessment of the green clay layer

consisting of 22 sediment samples to a depth of 810 feet (246.95 metres) was submitted on a rush

basis in late

November 2022

to American Assay Laboratories in

Sparks, Nevada

(see Nevada

Sunrise news release dated

December 6, 2022

), which produced results ranging from 615 parts per

million ("ppm") lithium to 1,450 ppm lithium. The remainder of the sediment samples from hole

GEM22-03 were submitted to ALS Group

USA

in

Reno, Nevada

. Thirty-nine groundwater samples

were also submitted to Western Environmental Laboratories in

Reno, Nevada

for analysis. The final

results of the sediment and water analyses to the end of hole GEM22-03 will be released following

their receipt, compilation and interpretation.

GEM23-04 Drilling in Progress, January 2023 (CNW Group/Nevada Sunrise Metals Corporation)

About the 2022-2023 Gemini Phase 2 Drilling Program

Nevada Sunrise drilled two reverse circulation ("RC") boreholes for a total of 2,020 feet (615.85

metres) in its Phase 1 program at Gemini in March and

April 2022

. The drill sites were located within

a defined gravity low that hosts conductive layers detected by historical ground time domain

electromagnetic ("TDEM") surveys. The results from the first two holes at Gemini represented a new

discovery of lithium-bearing sediments and a lithium-bearing brine in the western Lida Valley, which

has not been historically drill tested for lithium mineralization (see Nevada Sunrise news release

dated

June 6, 2022

).

The Company's Phase 2 drilling program began in the fall of 2022 and is designed to expand the

footprint of the lithium mineralization encountered to date. High-grade lithium-bearing sediments have

been intersected over a strike length of 1.14 miles (1.83 kilometres) and the current geophysical

model suggests the presence of many highly-prospective drill targets at Gemini. Drill pads and

access roads are in place at Gemini with an active drilling permit for up to 12 holes, good until

July

2024

.

For further information on Gemini, including location maps and photos

click here.

About Gemini

Gemini consists of 582 unpatented placer and lode claims (covering about nine square miles)

located in the western Lida Valley,

Esmeralda County

, approximately 6 miles (10 kilometres) east of

the town of Lida,

Nevada

. The Lida Valley is a flat, arid basin with a similar geological setting to the

better-known

Clayton Valley

basin where Albermarle Corporation operates the Silver Peak lithium

brine mine, which has operated continuously since 1966.

Gemini is situated adjacent to the Gold Point Solar Energy Zone, a Bureau of Land Management

land reserve set aside for solar and wind power generation projects until 2033. Exploration at

Gemini is complemented by the Company's 80.09 acre/feet/year water right, a pre-requisite for the

exploration and development of lithium brine projects in

Nevada

. Under the laws of

Nevada

, water

cannot be pumped from a subterranean source without a valid water permit.

Sampling and Analytical QA/QC and Statement of Qualified Person

The analytical results of sediment samples described in this new release were submitted to

American Assay Laboratories in

Sparks, Nevada

, and analyzed utilizing a multi-element ICP-AES

method. Specifically, the analytical method involves aqua regia digestion of the sample followed by

the inductively coupled plasma (ICP) technique to ionize the sample, and atomic emission

spectrometry (AES) to determine elemental concentrations. Duplicates, field blanks, and certified

reference standards were inserted at regular intervals in the sample stream to ensure accuracy of

the analytical method.

The scientific and technical information contained in this news release has been reviewed and

approved by

Robert M. Allender, Jr.

, CPG, RG, SME and a Qualified Person for Nevada Sunrise as

defined in National Instrument 43-101 –

Standards of Disclosure

for Mineral Projects

.

About Nevada Sunrise

Nevada Sunrise is a junior mineral exploration company with a strong technical team based in

Vancouver, BC

,

Canada

, that holds interests in lithium, gold, copper, and cobalt exploration projects

located in the

State of Nevada, USA

.

Nevada Sunrise owns 100% interests in the Gemini and

Jackson Wash

lithium projects, both of

which are located in the Lida Valley in

Esmeralda County, NV.

The Company owns Nevada water

right Permit 86863, also located in the Lida Valley basin, near Lida, NV.

The Company's key gold asset is a 20.01% interest in a joint venture with Copaur Minerals Inc. at

the Kinsley Mountain Gold Project near

Wendover, NV.

Kinsley Mountain

is a Carlin-style gold

project hosting a National Instrument 43-101 compliant gold resource consisting of

418,000

indicated ounces of gold grading 2.63 g/t Au (4.95 million tonnes), and 117,000 inferred

ounces of gold averaging 1.51 g/t gold (2.44 million tonnes), at

cut-off grades ranging from 0.2 to 2.0 g/t gold

1

.

1

Technical Report on the Kinsley Project, Elko County, Nevada, U.S.A., dated June 21, 2021 with an effective date of May 5, 2021 and prepared by Michael M. Gustin, Ph.D., and

Gary L. Simmons, MMSA and filed under New Placer Dome Gold Corp.'s Issuer Profile on SEDAR (

www.sedar.com

).

Nevada Sunrise has right to earn a 100% interest in the Coronado VMS Project, located

approximately 48 kilometers (30 miles) southeast of

Winnemucca, NV.

The Company owns a 15%

interest in the historic Lovelock Cobalt Mine and the Treasure Box copper properties, each located

approximately 150 kilometers (100 miles) east of

Reno, NV

, with Global Energy Metals Corp.

holding an 85% participating interest.

FORWARD LOOKING STATEMENTS

This release may contain forward

–

looking statements. Forward looking statements are statements

that are not historical facts and are generally, but not always, identified by the words "expects",

"plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar

expressions, or that events or conditions "will", "would", "may", "could" or "should" occur and

include disclosure of anticipated exploration activities. Although the Company believes the

expectations expressed in such forward

–

looking statements are based on reasonable

assumptions, such statements are not guarantees of future performance and actual results may

differ materially from those in forward looking statements. Forward

–

looking statements are based

on the beliefs, estimates and opinions of the Company's management on the date such statements

were made. The Company expressly disclaims any intention or obligation to update or revise any

forward

–

looking statements whether as a result of new information, future events or otherwise.

Such factors include, among others, risks related to the Company's 2023 exploration plans and

results at the Gemini Lithium Project; reliance on technical information provided by third parties on

any of our exploration properties; changes in project parameters as plans continue to be refined;

current economic conditions; future prices of commodities; possible variations in grade or recovery

rates; failure of equipment or processes to operate as anticipated; the failure of contracted parties

to perform; labor disputes and other risks of the mining industry; delays due to pandemic; delays

in obtaining governmental approvals, financing or in the completion of exploration, as well as those

factors discussed in the section entitled "Risk Factors" in the Company's Management Discussion

and Analysis for the Nine Months Ended

June 30

, 2022, which is available under Company's

SEDAR profile at

www.sedar.com

.

Although Nevada Sunrise has attempted to identify important factors that could cause actual

actions, events or results to differ materially from those described in forward-looking information,

there may be other factors that cause actions, events or results not to be as anticipated, estimated

or intended. There can be no assurance that such information will prove to be accurate as actual

results and future events could differ materially from those anticipated in such statements. Nevada

Sunrise disclaims any intention or obligation to update or revise any forward-looking information,

whether as a result of new information, future events or otherwise. Accordingly, readers should not

place undue reliance on forward-looking information.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined

in the policies of TSX Venture Exchange) accepts responsibility for the adequacy or

accuracy of this release.

SOURCE

Nevada Sunrise Metals Corporation

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/January2023/17/c7849.html

%SEDAR: 00026824E

For further information:

Warren Stanyer, President and Chief Executive Officer, Telephone: (604)

428-8028, email: [email protected]; Jason Powell, Corporate Communications,

Telephone: (604) 779-6497, email: [email protected]

CO: Nevada Sunrise Metals Corporation

CNW 07:30e 17-JAN-23