Nevada Sunrise Announces Completion of Drilling at the Kinsley Mountain Gold Project, Nevada
Nevada Sunrise Announces Completion of
Drilling at the Kinsley Mountain Gold Project,
Nevada
VANCOUVER, BC
,
Sept. 8, 2023
/CNW/ -
Nevada Sunrise Metals Corp. ("Nevada Sunrise",
or
the "
Company
") (TSXV: NEV) (OTC: NVSGF) announced today that its joint venture partner,
CopAur Minerals Inc. ("CopAur"), (TSXV: CPAU) has reported the completion of the 2023 reverse
circulation ("RC") and diamond drilling program at the Kinsley Mountain Gold Project ("Kinsley
Mountain", or the "Project") located in
Elko County, Nevada
, USA.
A total of seven (7) RC drill holes and three (3) diamond drill holes comprising 2,285 metres (7,495
feet) were completed at the high-grade Western Flank Zone, Main Pit North, and the new
Kinsley
Ridge
target (see Figure 1 below). All samples, including QA/QC samples, were shipped to ALS
Global in
North Vancouver, British Columbia
, Canada for multi-element analysis and gold fire-assay.
Results will be released following their receipt and interpretation by CopAur, operator of the Project.
Figure 1.
2023 Kinsley Mountain RC and Diamond Drilling Target Areas (CNW Group/Nevada
Sunrise Metals Corporation)
About Kinsley Mountain
Kinsley Mountain hosts current indicated mineral resources comprising a National Instrument 43-101
compliant gold resource consisting of 418,000 indicated ounces of gold grading 2.63 g/t Au (4.95
million tonnes), and 117,000 inferred ounces of gold averaging 1.51 g/t Au (2.44 million tonnes), at
cut-off grades ranging from 0.2 to 2.0 g/t Au
1
.
Indicated resources are inclusive of 302,000 ounces averaging 6.11 g/t gold hosted within the Secret
Canyon Shale at the Western Flank Zone. The Kinsley Mountain property hosts a historical past-
producing mine that yielded 138,000 ounces of near-surface, open-pit oxide gold mined by Alta Gold
Company between 1995-1999 (Figure 1).
1
Technical Report on the Kinsley Project, Elko County, Nevada, U.S.A., dated June 21, 2021, with an effective date of May 5, 2021, and prepared by Michael M. Gustin and
Gary L. Simmons, and filed under New Placer Dome Gold Corp.'s issuer profile on SEDAR (
www.sedar.com
).
Qualified Person
The scientific and technical information contained in this news release has been reviewed and
approved by
Robert M. Allender, Jr.
, CPG, RG, SME and a Qualified Person for Nevada Sunrise as
defined in National Instrument 43-101 –
Standards of Disclosure
for Mineral Projects
.
About Nevada Sunrise
Nevada Sunrise is a junior mineral exploration company with a strong technical team based in
Vancouver, BC
,
Canada
, that holds interests in lithium, gold, and copper exploration projects located
in the
State of Nevada, USA
.
Nevada Sunrise owns 100% interests in the Gemini,
Jackson Wash
and Badlands lithium projects, all
of which are located in the Lida Valley in
Esmeralda County, NV.
The Company owns Nevada water
right Permit 86863, also located in the Lida Valley basin, near Lida, NV.
The Company's key gold asset is a 20.01% interest in a joint venture at the Kinsley Mountain Gold
Project near
Wendover, NV
with CopAur Minerals Inc. The Company has elected not to contribute to
the 2023 exploration program at Kinsley Mountain and expects to incur dilution of its participating
interest in the joint venture to an approximate 19.0% interest.
Nevada Sunrise has the right to earn a 100% interest in the Coronado VMS Project, located
approximately 48 kilometers (30 miles) southeast of
Winnemucca, NV.
FORWARD LOOKING STATEMENTS
This release may contain forward
–
looking statements. Forward looking statements are statements
that are not historical facts and are generally, but not always, identified by the words "expects",
"plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar
expressions, or that events or conditions "will", "would", "may", "could" or "should" occur and
include disclosure of anticipated exploration activities. Although the Company believes the
expectations expressed in such forward
–
looking statements are based on reasonable
assumptions, such statements are not guarantees of future performance and actual results may
differ materially from those in forward looking statements. Forward
–
looking statements are based
on the beliefs, estimates and opinions of the Company's management on the date such statements
were made. The Company expressly disclaims any intention or obligation to update or revise any
forward
–
looking statements whether as a result of new information, future events or otherwise.
Such factors include, among others, risks related to the interpretation and actual results of
historical production at Kinsley Mountain, reliance on technical information provided by third
parties on any of our exploration properties, including access to historical information on the
Kinsley Mountain property as well as specific historical data associated with drill results from the
property, information received from CopAur Minerals Inc., current exploration and development
activities; changes in project parameters as plans continue to be refined; current economic
conditions; future prices of commodities; possible variations in grade or recovery rates; failure of
equipment or processes to operate as anticipated; the failure of contracted parties to perform;
failure of CopAur Minerals Inc. to complete anticipated work programs; labor disputes and other
risks of the mining industry; delays in obtaining governmental approvals, financing or in the
completion of exploration, as well as those factors discussed in the section entitled "Risk Factors"
in the Company's Management Discussion and Analysis for the Nine Months ended
June 30, 2023
,
which is available under Company's SEDAR profile at
www.sedar.com
.
Although Nevada Sunrise has attempted to identify important factors that could cause actual
actions, events or results to differ materially from those described in forward-looking information,
there may be other factors that cause actions, events or results not to be as anticipated, estimated
or intended. There can be no assurance that such information will prove to be accurate as actual
results and future events could differ materially from those anticipated in such statements. Nevada
Sunrise disclaims any intention or obligation to update or revise any forward-looking information,
whether as a result of new information, future events or otherwise. Accordingly, readers should not
place undue reliance on forward-looking information.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined
in the policies of TSX Venture Exchange) accepts responsibility for the adequacy or
accuracy of this release.
SOURCE
Nevada Sunrise Metals Corporation
View original content to download multimedia:
http://www.newswire.ca/en/releases/archive/September2023/08/c1919.html
%SEDAR: 00026824E
For further information:
Warren Stanyer, President and Chief Executive Officer, email:
[email protected], Telephone: (604) 428-8028 or Jason Powell, Corporate
Communications, email: [email protected], Telephone: (604) 779-6497
CO: Nevada Sunrise Metals Corporation
CNW 07:30e 08-SEP-23