Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NED.V ·

Treasure Mountain Silver Project Exploration Update

Exploration Programs

1

NEW DESTINY MINING CORP.

Treasure Mountain Silver Project

Exploration Update

TSX-V : NED

Hope BC

Canada

_____________________________________________________________________________________

Vancouver, British Columbia – March 10, 2023 – New Destiny Mining Corp. (TSXV: NED) , (the

“Company” or “NED”) announces that the Company is planning to resume work this season at its

Treasure Mountain project, near Hope, BC.

Photo showing access construction and samples being collected at Railroad occurrence.

2

Exploration field work was restricted over the last two seasons due to damaged roads and bridges

caused by flooding during the winter months of 2021. In 2022, an airborne LIDAR survey was

flown over the entire property. The results will aid in locating historic workings and geological

structures related to mineralization.

Hand sample showing chalcopyrite-pyrite mineralization at the Railroad occurrence.

Field work is being planned for the Railroad, Jim Kelly and Rio Grande mineral occurrences. The

Railroad is a zone of copper-silver mineralization hosted in quartz sericite schist at one of seven

historic adits. A 1.7 metre wide sample across the mineralization in 2019 returned values of 264

grams per tonne silver and 1.06% copper, with elevated arsenic (106 ppm As) and antimony (439

ppm Sb). The weighted average grades for this and two consecutive mineralized samples are

116.0 ppm silver and 0.64% copper over a 4.2 metre width (Assessment Report 38687). Plans are

to test the structure by diamond drilling and to explore for a northern extension using soil

geochemistry.

3

The Jim Kelly Creek area contains gold -quartz veins, where a 2018 grab sample returned a result

of 11.3 grams per tonne gold (Assessment Rep ort 37650) . Plans are to expose the vein by

trenching and then test it by drilling. Geochemical surveys are also being planned.

The Rio Grande was last visited in 2018 when 7 rock grab samples were collected. The results

ranged up to 122 grams per tonne silver, 0.4 % copper, 1.45% zinc and 0.24 grams per tonne gold

(Assessment Report 37650). Plans are to collect representative channel samples and follow -up

by trenching and drilling.

The project is currently fully permitted and ready for drilling and trenching. Archeology studies

were completed in 2019. The field work will entail trenching, rock sampling and drilling , and is

scheduled to take up to 45 days and cost $375,000.

Readers are cautioned that historical records referred to in this News Release have been

examined but not verified by a Qualified Person. Further work is required to verify that historical

records referred to in this News Release are accurate.

Dr. Mathew Ball, P.Geo., a Qualified Person as defined by NI 43-101 and consultant to the

Company, approved the technical information contained in this News Release.

The Company also announces that Mr. Brad Kitchen has resigned as a director but remains as an

advisor to New Destiny.

ON BEHALF OF THE BOARD OF DIRECTORS

“Al Beaton”

Director

604-488-3900

4

Forward Looking Information

This news release includes certain statements that constitute “forward -looking information” within the

meaning of applicable securities law, including without limitation, the Company’s information and

statements regarding or inferring the future business, operations, financial performance, prospects, and other

plans, intentions, expectations, estimates, and beliefs of the Company. Such statements include statements

regarding the completion of the proposed transactions. Forward -looking statements address fut ure events

and conditions and are necessarily based upon a number of estimates and assumptions. These statements

relate to analyses and other information that are based on forecasts of future results, estimates of amounts

not yet determinable and assumptions of management. Any statements that express or involve discussions

with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events

or performance (often, but not always, using words or phrases such as “exp ects” or “does not expect”, “is

expected”, “anticipates” or “does not anticipate”, “plans”, “estimates” or “intends”, or stating that certain

actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved), and

variations of such words, and similar expressions are not statements of historical fact and may be forward -

looking statements. Forward -looking statement are necessarily based upon several factors that, if untrue,

could cause the actual results, performances or achievements of the Company to be materially different from

future results, performances or achievements express or implied by such statements. Such statements and

information are based on numerous assumptions regarding present and future business strategies and the

environment in which the Company will operate in the future, including the price of gold and other metals,

anticipated costs and the ability to achieve goals, and the Company will be able to obtain required licenses

and permits. While such estimat es and assumptions are considered reasonable by the management of the

Company, they are inherently subject to significant business, economic, competitive and regulatory

uncertainties and risks including that resource exploration and development is a specul ative business; that

environmental laws and regulations may become more onerous; that the Company may not be able to raise

additional funds when necessary; fluctuating prices of metals; the possibility that future exploration,

development or mining results will not be consistent with the Company’s expectations; operating hazards

and risks; and competition. There can be no assurance that economic resources will be discovered or

developed. Accordingly, actual results may differ materially from those currently anticipated in such

statements. Factors that could cause actual results to differ materially from those in forward looking

statements include continued availability of capital and financing and general economic, market or business

conditions, the loss of key directors, employees, advisors or consultants, equipment failures, litigation,

competition, fees charged by service providers and failure of counterparties to perform their contractual

obligations. Investors are cautioned that forward -looking statement s are not guarantees of future

performance or events and, accordingly are cautioned not to put undue reliance on forward -looking

statements due to the inherent uncertainty of such statements. The forward -looking statements included in

this news release are made as of the date hereof and the Company disclaims any intention or obligation to

update or revise any forward -looking statements, whether as a result of new information, future events or

otherwise, except as expressly required by applicable securities legislation.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies

of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release