Northisle Announces Significant Improvement in Gold and Copper Recoveries at Red Dog TSX Venture Exchange Symbol: NCX
Northisle Announces Significant Improvement
in Gold and Copper Recoveries at Red Dog
TSX Venture Exchange Symbol: NCX
HIGHLIGHTS
The recently completed metallurgical tests improved the copper and gold recovery rates
at the Red Dog Deposit by an average of 5% and 65% respectively, compared to the
tests forming the bases for estimates used in the previously published PEA
Metallurgical tests also demonstrate potential to recover silver and rhenium metal
content, which was previously excluded from the PEA economics
The previously published PEA is being updated to include upside potential related to
higher gold and copper recovery rates, higher metal prices, and the inclusion of silver
and rhenium metal recovery
VANCOUVER, BC, Oct. 2, 2020 /CNW/ -
Northisle Copper and Gold Inc
. (TSXV: NCX)
("Northisle" or the "Company") is pleased to report that preliminary metallurgical test results
demonstrate a significant improvement in recoveries of copper and gold for the Red Dog Deposit at
its 100%-owned North Island Project located in
British Columbia, Canada
.
The test work was designed to investigate alternative flotation parameters to improve the recovery
rates of copper and gold in the Red Dog Deposit mineralization. The results demonstrate that the
average copper and gold recovery rates improved by 5% and 65% respectively, compared to tests
used for the Preliminary Economic Assessment ("PEA") published in
September 2017
.
In addition, the metallurgical test work included assaying and evaluating the recoveries of rhenium
and silver which were not included in earlier test work and in the PEA economics. Results
demonstrate rhenium recoveries of 69.4% and silver content in the concentrate of 15.1 g/t.
Following the previously announced successful metallurgical results obtained for the Hushamu
Deposit, Northisle expects to update the PEA to incorporate upside potential related to the expected
higher gold and copper recovery rates, inclusion of silver and rhenium metal recovery at Red Dog
and Hushamu deposits as well as the higher metal prices.
John McClintock
, President and CEO stated: "These results are very positive as they are expected
to significantly improve the economics of our North Island Project. Given this success, we are eager
to update our PEA to reflect the upside potential of higher copper and gold recovery rates, inclusion
of silver and rhenium metal recovery, and higher metal prices."
TEST PROGRAM DETAILS
The metallurgical test program was completed by SGS Canada Inc. (SGS) at their laboratory facility
in
Burnaby, BC
. The test work was done on an approximately 50 kg composite sample of core from
drill holes RD16-01, RD16-02 and RD16-06. The samples comprising the composite represent a
range of high and lower grade mineralization. The results of the lock cycle test are presented in the
table below. For comparison, the results of the cleaner tests used for the PEA are presented in
Table 2. The composites for the earlier metallurgical work were prepared from core samples from
H14-05.
Detailed test work included: sample preparation, sample characterization, batch rougher batch
cleaner and lock cycle test work. Modifications to the original flotation conditions of the 2016 work
included, a regrind of the rougher concentrate to 20um, new reagent scheme and a three stage
cleaner circuit.
The results of the metallurgical tests demonstrated that the copper recoveries improved to 89.8%
from 85.7%. Gold recoveries improved to 53.0% from 33%.
Table
1: SGS
Labs
Results
Lockcycle
Tests
Calculated
Feed
grade
(% or gpt)
PG
(um)
Concentrate
grade
(% or gpt)
Recovery
%
Cu
Au
Mo
Ag
Re
Cu
Au
Mo
Ag
Re
Cu
Au
Mo
Ag
Re
Red Dog
0.33
0.51
0.005
0.47
0.32
98
26.5
24.5
0.30
15.1
20.2
89.8
53.0
73.5
35.5
69.4
Table
2:
2016
Base
Met
Cleaner
Tes
Calculated
Feed grade
(% or gpt)
PG
(um)
Concentrate
grade
(% or gpt)
Recovery
%
Cu
Au
Mo
Ag
Re
Cu
Au
Mo
Ag
Re
Cu
Au
Mo
Ag
Re
Red Dog
0.34
0.53
.007
na
na
100
24.2
14.3
na
na
na
85.7
32.2
na
na
na
ABOUT THE NORTH ISLAND PROJECT
The 100%-owned North Island Project consists of the Hushamu and nearby Red Dog deposits, with
Mineral Resources summarized in the below table.
Table
3:
North
Island
Project
Resources
as
at
December
31,
2018
Tonnes,
'000
Grade
Contained
Metal
Cu,
%
Au,
g/t
Mo,
%
Re,
ppm
Cu Eq, %
Cu,
B lb
Au,
Moz
Mo,
M lb
Re,
Kg x 1000
Cu eq, B lb
Au
eq,
Moz
Red
Dog
Indicated
36,568
0.27
0.38
0.005
0.52
0.22
0.45
4.0
0.42
0.99
Inferred
1,774
0.20
0.30
0.003
0.39
0.01
0.02
0.1
0.02
0.04
Hushamu
Indicated
305,180
0.24
0.28
0.008
0.54
0.43
1.62
2.75
53.8
165
2.92
6.97
Inferred
189,640
0.19
0.24
0.007
0.35
0.36
0.79
1.46
29.3
66
1.49
3.56
Total
Indicated
341,743
0.24
0.29
0.008
0.48
0.44
1.83
3.2
57.8
165
3.34
7.96
Inferred
190,788
0.19
0.24
0.007
0.35
0.36
0.80
1.48
29.4
66
1.51
3.60
Mineral Resource estimates follow the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") definitions standards for Mineral Resources and Reserves and have been
completed in accordance with the Standards of Disclosure for Mineral Projects as defined by National Instrument 43-101. The NI 43-101 reports co-authored by P Burt PGeo and B
Game PGeo documenting the resource estimate available on the company's website and filed on SEDAR. Reported tonnage and grade figures have been rounded from raw
estimates to reflect the relative accuracy of the estimate. Minor variations may occur during the addition of rounded numbers. Mineral Resources that are not Mineral Reserves do
not have demonstrated economic viability. Copper and gold equivalent calculated using US$3.10/lb Cu, US$1300/oz Au and US$9.00/lb Mo and is not adjusted for mining and
metallurgical recoveries as these remain uncertain. The formula used is as follows: CuEQ =
(Cu% x 22.0462 x 3.10)
+ (Au g/t x 1300.00/ 31.1035) + (Mo% x 22.0462 x
9.00)/22.046x3.1. AuEQ =(Cu% x 22.0462 x 3.10) + (Au g/t x 1300.00/ 31.1035) + (Mo% x 22.0462 x 9.00)/(1300/31.1035).
Rhenium values have not been used in the cut-off
grade or Cu or gold Equivalent calculations.
In
September 2017
, Northisle published the results of a PEA which demonstrated the potential
technical and economic viability of the project constructed as an open-pit mine, with a concentrator
processing nominally 75,000 tonnes/day (27Mtpa) with the results summarized in the below table.
This PEA is expected to be updated to reflect the results from the metallurgical tests described in
the sections above.
Table
4:
North
Island
Project
PEA
Summary
LIFE
OF MINE PHYSICALS
Mine life, years
22 years
Strip ratio, w:o
0.72
Throughput
27.4Mtpa
Mineralization inventory
600Mt
Copper grade
0.18%
Gold grade
0.24g/t
Molybdenum grade
0.01%
Pyrite grade
9%
LOM production
Copper
1.9B lb
Gold
1.8Moz
Molybdenum
55M lb
Pyrite
17B lb
Copper
equivalent,
M lb pa
3.1B lb
Gold equivalent, koz
7.4Moz
AVERAGE
ANNUAL
PRODUCTION
Copper, M lb
82M lb
Gold, koz
79koz
Molybdenum, M lb
3M lb
Pyrite, kt
0.64Kt
Copper
equivalent,
M lb
141M lb
Gold equivalent, koz
335koz
AVERAGE
ANNUAL
PRODUCTION
COSTS
Copper C1 Cash Costs net of by-products, US$/lb
$0.88/lb
Copper AISC net of by-products, US$/lb
$1.22/lb
Copper equivalent AISC, US$/lb Cu eq
$2.00/lb
ld equivalent AISC, US$/oz Au eq
$840/oz
ECONOMICS
After-tax NPV5%, US$m
$757m
After-tax NPV8%, US$m
$413m
After-tax IRR, %
14%
The commodity prices used are as follows: US$ 3.10/lb Cu, US$ 1,300/oz Au, US$ 9.00/lb Mo, US$ 9/t Py with a CAD/USD of 0.75. For more information, please consult the 2017
PEA available on SEDAR under the Company's profile or on Northisle's website.
For more information on Northisle please visit the Company's website at
www.Northisle.ca
.
John McClintock
, P. Eng is the Qualified Person who reviewed and approved the scientific and
technical disclosure in this news release.
On behalf of Northisle Copper and Gold Inc.
John McClintock, P. Eng
President, CEO and Director
www.northisle.ca
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in
the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of
this news release.
This news release contains forward-looking statements. These forward-looking statements are
based upon the reasonable beliefs of Northisle and its management as of the date of this news
release; however, forward-looking statements involve risks and uncertainties and are based upon
factors that may change and assumptions that may prove, with the passage of time, to be incorrect
as a result of exploration and other risk factors associated with mineral exploration and development
that are beyond the control of Northisle. Accordingly, undue reliance should not be placed upon such
statements. If factors materially change or assumptions are materially incorrect, the actual results,
performance or achievements of Northisle may be materially different from any future results,
performances or achievements expressed or implied by such forward-looking statements. Northisle
does not undertake any obligation to update or revise any forward-looking statements to reflect new
information, future events or otherwise, except as required by applicable law.
SOURCE
NorthIsle Copper and Gold Inc.
View original content to download multimedia:
http://www.newswire.ca/en/releases/archive/October2020/02/c9569.html
%SEDAR: 00032328E
For further information:
John McClintock, P. Eng, President, CEO and Director, www.northisle.ca
CO: NorthIsle Copper and Gold Inc.
CNW 16:15e 02-OCT-20