January  29,  2013  Vancouver,  BC  –  Northcliff  Resources  Ltd.  (“Northcliff”  or  the  “Company”)  (TSX:  NCF)  announces completion of a positive Feasibility Study for its 100%‐owned Sisson Project (“Sisson”) located in New Brunswick (“NB”), Canada, confirming the long‐life open pit tungsten and molybdenum development as a technically and economically robust project.

Undertaken  by  Samuel  Engineering,  Inc.  of  Denver,  Colorado,  the  Sisson  Project  Feasibility  Study  reports  a  pre‐tax  net present value (“NPV”) of $714 million at an 8% discount rate, an internal rate of return (“IRR”) of 20.4% and a 4.1‐year payback  on  initial  capital  expenditures  of  $579  million  at  long  term  metal  prices  of  US$350/mtu  for  ammonium paratungstate (“APT”) and US$15/lb for molybdenum. On a post‐tax basis, Sisson has a $418 million NPV (equal to $5.40 per outstanding Northcliff share based on 77,399,245 current issued and outstanding shares), a 16.3% IRR and a 4.5 year payback on initial capital. All values are expressed in Canadian dollars unless otherwise noted.

“In just two years, Northcliff has advanced Sisson from an exploration and early‐stage development project to achieve this  important project milestone. We have significantly de‐risked the project and now have one of the largest tungsten reserves  outside  China,”  said  Northcliff  President  &  CEO  Chris  Zahovskis.  “We  are  confident  that  Sisson  is  on  track  to  earn  the  necessary environmental and construction permits from federal and provincial regulators in 2014, and Northcliff will be  pursuing partnerships with global companies interested in the Sisson Project  or tungsten off‐take agreements, positioning  Northcliff to achieve the financing necessary to initiate project construction in 2014 and commissioning by 2016.”  

Feasibility Study Highlights 

  • Located 100  km  by  road northwest  of  Fredericton,  NB, the  Sisson  property hosts  a 334  million  tonne  proven  and probable mineral reserve containing 22.2 million metric tonne units (“mtu”) of tungsten trioxide (“WO3“) and 154.8 million pounds of molybdenum (“Mo”) at an $8.83/t Net Smelter Return (“NSR”) cut‐off. The life‐of‐mine (“LOM”) plan, based on this mineral reserve, has an average NSR value of $26.24/t and an average NSR value over the first five years of production of $30.75/t processed.
  • Sisson will be developed as an efficient bulk tonnage operation with mine‐site facilities to include: an open pit; ore processing plants; tailings storage facility; and ancillary buildings including offices, shops and warehouses.
  • Northcliff  will  undertake  value‐added processing  of  tungsten  concentrates  produced  at  Sisson by constructing  and operating an APT plant at the project site which adds significant economic value to the Sisson Project.
  • Access  to  the  Sisson  Project  site  will  be  facilitated  via  existing  highways  and  roads.  Power  will  be  provided  by provincial power utility NB Power via a new 138 kiloVolt (“kV”) transmission line alongside an existing 345 kV line at an expected cost of $0.066 per kilowatt‐hour (“kWh”).
  • The Sisson Project will directly employ 300 people in New Brunswick and up to 500 during the construction phase. The project workforce will be drawn from surrounding towns and cities; no permanent work camp will be required.
  • Initial capital expenditures to construct the Sisson mine, processing facilities, primary and secondary infrastructure are estimated at $579 million (including a 15% contingency). Construction of the Sisson Project facilities is expected to take 24 months to complete.
  • Mill throughput at Sisson is expected to average 30,000 tonnes per day (or 10.5 Mt per year) for a total of 281 Mt of ore processed over 27 years of operation. Average effective strip ratio is low at 1:1.
  • The  average  LOM  head  grade  is  estimated  to  be  0.073%  WO3  and  220  ppm  Mo.   Average  LOM  recoveries  are estimated  to  be  77%  for  tungsten  and  82%  for  molybdenum.   Average  head  grade  over  the  first  five  years  of

production is estimated to be 0.093% WO3 and 240 ppm Mo.  Concentrator recoveries for this five year period are estimated to be 81% for tungsten and 82% for molybdenum after ramp‐up of the facility.

  • Based  on  the  Feasibility  Study  mine  plan,  Sisson  will  produce  an  estimated  annual  average  of  557,000  mtu  WO3 contained in APT and 4.1 million pounds Mo contained in concentrates or a total of  15.0 million mtu WO3 and 111.3 million pounds Mo over 27 years of operation. Average annual production in the first five years is forecast at 689,000 mtu WO3 and 4.4 million pounds Mo.
  • Average  cash  costs  of  APT  production  are  forecast  at  $8.18  per  tonne  milled  or  $153/mtu  (net  of  molybdenum credits).

Feasibility Study – Key Measures 

Metal Price Assumptions ($US dollars)
Tungsten ( APT)$ 350 / mtu
Molybdenum$ 15 / lb
Financial Results*Pre‐TaxPost‐Tax
Net Present Value (8%)$ 714 M$ 418 M
Internal Rate of Return (IRR)20.4 %16.3%
Payback4.1 years4.5 years
Total Capital Costs$ 579 M
Production ResultsAmount
Milling Rate (tonnes/day) ‐ nominal30,000
Strip Ratio1 : 1
Life of Mine27 years
Annual AverageLife of MineYears 1 to 5
Tonnes Milled10.5 M / a281 M10.2 M /a
Tungsten (WO ) Production 3557,000 mtu / a15.0 M mtu689,000 mtu / a
Mo Production4.1 M lbs / a111.3 M lbs4.4 M lbs / a
Avg. WO Grade / Recovery 30.073% / 77%0.073% / 77%0.093% / 81%**
Avg. Mo Grade / Recovery220 ppm / 82%220 ppm / 82%240 ppm / 82%

*financial results are as at commencement of construction.  Exchange rate assumptions for US$:C$ are:

Capital cost 1.0:1; Years 1‐4 0.98‐0.92:1; Years 5+ 0.90:1 **after ramp‐up of the concentrator facility

3 3
Average Annual Operating Costs$ / tonne$ / mtu
Mining (per tonne milled)4.15**77.7
Milling7.11133.2
Waste Management0.5911.1
G&A0.478.8
Total Operating Costs to Concentration12.32230.8
Moly By‐Product Credits(5.76)(107.8)
Total Operating Costs6.56123.0
APT Costs (including offsite costs)1.6230.3
Total APT Cash Costs8.18153.3

**Mining cost per tonne mined is $2.09/t

Capital Cost Summary$ M
Mine34.1
Concentrator & APT Plant247.9
Site Infrastructure & Ancillary55.4
Owner’s Costs & Indirects168.4
Contingency ( 15% )73.0
Total578.8

Mineral Resource and Reserve Information 

The Sisson deposit is one of the largest undeveloped tungsten reserves in the world, containing 22.2 million mtu of WO3 and 154.8 million lbs of Mo. The LOM plan based on this mineral reserve has an average NSR (net smelter return) value of $26.24/t milled and an average NSR value over the first five years of production of $30.75/t milled.

Mineral reserves cited in the Sisson Project Feasibility Study are summarized in the table below.

Cut‐off GradeTonnes AboveAverage Grade Above CoGContained Metal above CoG
("CoG")CoG
NSRTonnes x 1000NSRWO3MoTungstenMolybdenum
Categories($/t)($/t)(%)(%)(M mtu)(M lbs)
Proven8.83105,41525.480.0690.0237.353.0
Probable8.83228,94823.540.0650.02014.9101.7
Total8.83334,36324.150.0660.02122.2154.8

Contained within Ultimate Pit Limit Metal Prices: WO3 – US$350/mtu, Mo – US$15/lb; Assumed Concentrator Recoveries: WO3 – variable with feed grade, Mo – 82%;

APT Plant Recovery of WO3 – 97%; US$:C$0.9:1;  NSR = (WO3% * NSP WO3*Recovery WO3*22.046) + (Mo%*NSP Mo Recovery Mo*22.046);

Net Smelter Price (NSP) WO3 = CDN$17.46/lb; Mo = C$14.50/lb.

Note that the mine plan employs a variable cut‐off grade strategy to maximize financial returns. Of the 334 Mt in reserves, 281 Mt are in the feasibility study LOM plan.

Long‐term Metal Prices 

The Sisson Project Feasibility Study utilizes average long‐term metal prices of $350/mtu for APT and $15/lb for Mo, and concludes  that  Sisson  will  be  a  stable  and  profitable  producer  of  tungsten  and  molybdenum  concentrate,  as  well  as ammonium paratungstate, at both current and long‐term forecast metal prices. The selected tungsten price falls in the low‐ to‐medium range of estimates provided in a marketing study completed for Northcliff by the Roskill Consulting Group of London, U.K. (“Roskill”).

According to Roskill, “based on forecasts for demand, the tungsten market should fluctuate around an equilibrium level in  both the base‐case and pessimistic demand scenarios assuming that the majority of planned projects reach production and  current output at existing operations is maintained. Long‐term, tungsten prices are expected to increase irrespective of the  supply/demand balance. Tungsten production costs have been rising globally and Chinese producers are now more sensitive  to tungsten prices than in the past because of rising energy, labour, equipment and reagent costs. In real price terms, APT  prices are forecast to average $383/mtu in the period 2012 to 2025, reaching $433/mtu in 2025.”

Mine Operations and Facilities 

Infrastructure  and  facilities  at  the  Sisson  mine  site  will  include  an  open  pit,  crushing,  conveying,  ore  stockpile,  ore concentrator, APT plant, tailings storage facility, and ancillary buildings including offices, shops and warehouses.

Conventional, modern mining equipment will be used, including 16.5 m3 electric‐hydraulic shovels, 136 tonne capacity haul trucks and 165 mm diameter hydraulic drills. The mine will deliver 10.5 Mt of mill feed annually to the primary crusher located adjacent to the pit, which will then be conveyed approximately 1 km to the concentrator. Lower grade and non‐ mineralized material will be stored within the tailings storage facility. The low strip ratio, bulk‐tonnage style mining and consolidated footprint of the mine design all contribute to low unit operating costs for the Sisson Project.

Metallurgy and Processing 

Mineral processing will consist of crushing and grinding for the liberation of the molybdenum and tungsten rich minerals, followed  by  industry  standard  flotation  to  recover  the  metals  into  their  respective  concentrates.  The  crushing  circuit includes a primary gyratory crusher, secondary cone crushing and tertiary high pressure grinding rolls (HPGR), followed by single stage two‐line ball mill grinding. Ground ore will feed the molybdenum and tungsten flotation circuits. The respective flotation concentrates for molybdenum and tungsten will be dewatered. The molybdenum concentrate will be sold to other parties  for  further  processing,  while  the  tungsten  concentrate  will  be  further  processed  on  site  into  ammonium paratungstate (see APT Plant below).

All processing steps described are conventional processes widely used in the global mining industry. Process design is based on  an  extensive  testing  program  undertaken  by  SGS  Mineral  Services  Canada,  at  their  well‐known  and  highly  regarded Lakefield, Ontario facility using representative core samples obtained from a metallurgical drill program.

APT Plant 

The Sisson Project will include construction and operation of a value‐added processing plant to produce APT. The APT plant will be the first of its kind in Canada, and will substantially enhance local employment and economic activity associated with operation of the Sisson Project.

“We believe that investing in value‐added tungsten processing in New Brunswick is not only a net economic gain for the  Sisson Project and the regional and provincial economy, but it also has the potential to generate value well beyond the  Sisson  mine’s  operating  life  and  encourage  further  private  sector  investment  in  exploration  and  development  of  New  Brunswick’s tungsten resources,” Zahovskis added. 

Secondary Infrastructure 

Located 100 km by road northwest of the City of Fredericton in the Canadian province of New Brunswick, the Sisson Project enjoys ready access to modern transportation and power infrastructure and a skilled labour force. Situated in an area of rolling  topography,  the  site  is  readily  accessible  by  road  from  Fredericton,  with  local  access  provided  by  numerous secondary and forestry roads. Power lines from the provincial grid cross the property. A rail line is located 15 km east of the deposit and connects to deep‐sea ports at Saint John and Belledune. Road access to these ports is also readily available.

The Project’s power requirements will be satisfied by tying into the existing New Brunswick electrical grid. Although an existing 345 kV line crosses the Sisson claim block, a new 42 km, 138 kV transmission line will be constructed by NB Power alongside the existing line. NB Power will own the line and switchgear but Northcliff will own the mine site terminal station. Power costs are estimated at $0.066 per kWh in the Feasibility Study.

“Northcliff has been working with a broad range of government, public, First Nation and institutional stakeholders in New  Brunswick  over  the  past  two  years,  including  power  and  transportation  interests,  in  order  to  forge  the  support  and  partnerships necessary to successfully execute the Sisson Project,” Zahovskis said. “We’re pleased with the progress made to  date,  and  are  confident  that  the  business,  social  and  political  support  necessary  to  move  this  project  forward  will  be  achieved in the year ahead.”

Environmental Assessment and Permitting 

In addition to completion of a positive Feasibility Study for the Sisson Project, Northcliff is working toward the completion of an Environmental Impact Assessment (“EIA”) to facilitate regulatory/public review and permitting. The Company expects to submit an EIA Report to federal and provincial regulatory agencies in early 2013. Following regulatory and public review of  the  Sisson  Project  EIA  report,  Northcliff  will  apply  for  the  broad  range  of  construction  and  environmental  permits necessary to take the Sisson Project into production.

“Since  finalizing  the  ‘Terms  of  Reference’  for  the  Sisson  Project  EIA  report  last  year,  Northcliff’s  engineering  and  environmental teams have worked closely together to optimize the project design in order to minimize the mine footprint,  enhance environmental safeguards and ensure that we meet or exceed regulatory standards and permitting requirements in  New Brunswick,” Zahovskis said. “We’ve also consulted broadly to understand communities’ and First Nations’ interests in  the Sisson Project area, and worked hard to propose a project that we believe respects the natural resources, land uses and  traditional ways of life in the region.”

As an example of project design improvements achieved in recent months, Zahovskis noted that Northcliff succeeded in consolidating the Sisson Project’s footprint by constraining the tailings storage facility and by storing barren rock within it. He said the change will further enhance water quality protection and simplify an environmentally sustainable closure of the project.

Zahovskis added: “We look forward to continued engagement with government, local communities and First Nations to  discuss  the  environmental  and  social  dimensions  of  our  project.  Ultimately,  we  are  confident  that  Sisson  will  deliver  substantive benefits to the people of the region and the province, while protecting water quality, fisheries, wildlife and other  key environmental and social values.”

Closure and Bonding 

A detailed assessment of closure costs for the Sisson mine has been undertaken as part of the Feasibility Study. These costs have been used to estimate the bond amount that is required to be set aside at the onset of mine operations for closure of the project. This assessment includes careful consideration of long‐term costs associated with managing water quality at the project site post‐closure. The estimated closure costs and the associated bond contributions have been included in the assessment of the project.

“I’m extremely proud of the work our project engineers and environmental team have done to refine the Sisson Project  design to ensure that we not only meet or exceed the high environmental standards and permitting requirements enforced  by  federal  and  provincial  regulatory  agencies,  but  that  we  protect  the  values  most  important  to  New  Brunswickers,” Zahovskis said. “In particular, we are very confident that the Sisson Project will protect regional water quality and the fish  and wildlife resources of central New Brunswick.” 

Feasibility Project Management and Contributions 

The Sisson Project Feasibility Study was prepared under the direction of Mr. Ivor Alexander of Samuel Engineering, Inc., with  contributions  from  the  following  Northcliff  independent  consultants  and  “Qualified  Persons”  for  the  purposes  of National Instrument 43‐101, who have reviewed and approved this release.

ConsultantContributionQualified Person
Roscoe Postle Associates, Inc.Resource EstimateDavid W. Rennie, PEng
Moose Mountain Technical ServicesMine Design and Production PlanningJim Gray, PEng
Knight Piésold ConsultingGeotechnical, Water and Waste ManagementDaniel Friedman, PEng
Bolu Consulting Engineering, Inc.Concentrator Design including: Metallurgy, Process, Layout and Mechanical DesignMatt Bolu, M.Sc., PEng
Gene GreskovichAPT Design including: Metallurgy, Process, Layout and Mechanical DesignGene Greskovich, PE
Samuel Engineering, Inc.Infrastructure, Civil and Electrical Design, Mechanical Costing and, Financial AnalysisSteven Pozder, PE

Mr. Terrence Smith, PEng. is a Qualified Person and has approved the content of the news release that summarizes the results of the feasibility study.

To fully understand the summary information above, the associated NI 43‐101 technical report, which will be filed on Sedar within 45 days, should be read in its entirety.

About the Sisson Project 

The Sisson Project has excellent potential for near‐term production of tungsten and molybdenum. It is well‐located near roads,  rail  and  tidewater  on  the  eastern  seaboard  of  North  America,  which  provides  the  project  with  key  logistical advantages over other greenfield tungsten projects. New Brunswick is a stable jurisdiction with a long tradition of mineral and resource development, and a well‐established regulatory system. By advancing Sisson, Northcliff will become one of North America's major tungsten producers, greatly increasing supply for the large North American, Asian and European markets where demand is forecast to  outstrip  supply.

Northcliff  has  completed  a  positive  Feasibility  Study  for  the  Sisson  Project  and  is  advancing  toward  completion  of  an Environmental  Impact  Assessment  (EIA),  to  be  submitted  to  federal  and  provincial  regulatory  agencies  in  early  2013. Following  regulatory  and  public  review  of  the  Sisson  Project  EIA  report,  Northcliff  will  apply  for  the  broad  range  of operating and environmental permits necessary to take the Sisson Project into production.

Northcliff  expects  to  achieve  EIA  approvals  for  the  Sisson  Project  in  2014  and  shortly  thereafter  initiate  a  two  year construction phase subject to securing sufficient financing on acceptable terms. Full commissioning is currently expected to commence in 2016.

About Northcliff 

Northcliff  is  a  mineral  resource  company  associated  with  Hunter  Dickinson  Inc.  (HDI),  and  focused  on  progressing  the feasibility‐stage Sisson Tungsten‐Molybdenum Project located in New Brunswick, Canada, to production.

For  further  details  on  Northcliff  and  the  Sisson  Project,  please  visit  www.northcliffresources.com  or  contact  Investor Services at (604) 684‐6365 or within North America at 1‐800‐667‐2114

Christopher Zahovskis President & CEO

No regulatory authority accepts responsibility for the adequacy or accuracy of this release.

CAUTION REGARDING FORWARD‐LOOKING INFORMATION

This document contains “forward‐looking statements” that are based on Northcliff’s expectations, estimates and projections as of the dates as of which those statements were made. Generally, these forward‐looking statements can be identified by the use of forward‐looking terminology such as “outlook”, “anticipate”, “project”, “target”, “believe”, “estimate”, “expect”, “intend”, “should” and similar expressions.

Forward‐looking statements  are subject  to  known  and  unknown  risks,  uncertainties  and  other  factors that  may cause  the  Company’s  actual results,  level  of  activity,  performance  or  achievements  to  be  materially  different  from  those  expressed  or  implied  by  such  forward‐looking statements. These include but are not limited to:

  • uncertainties  and  costs  related  to  the  Company’s  exploration  and  development  activities,  such  as  those  associated  with  determining whether mineral resources or reserves exist on a property;
  • uncertainties related to feasibility studies that provide estimates of expected or anticipated costs, expenditures and economic returns from a mining project; uncertainties related to expected production rates, timing of production and the cash and total costs of production and milling;
  • uncertainties related to the ability to obtain necessary licenses, permits, electricity, surface rights and title for development projects;
  • operating and technical difficulties in connection with mining development activities;
  • uncertainties related to the accuracy of our mineral reserve and mineral resource estimates and our estimates of future production and future cash and total costs of production, and the geotechnical or hydrogeological nature of ore deposits, and diminishing quantities or grades of mineral reserves;
  • uncertainties related to unexpected judicial or regulatory proceedings;
  • changes in, and the effects of, the laws, regulations and government policies affecting our mining operations, particularly laws, regulations and policies relating to
    • mine  expansions,  environmental  protection  and  associated  compliance  costs  arising  from  exploration,  mine  development,  mine operations and mine closures;
    • expected effective future tax rates in jurisdictions in which our operations are located;
    • the protection of the health and safety of mine workers; and
    • mineral rights ownership in countries where our mineral deposits are located;
  • changes in general economic conditions, the financial markets and in the demand and market price for gold, silver and other minerals and commodities,  such  as  diesel  fuel,  coal,  petroleum  coke,  steel,  concrete,  electricity  and  other  forms  of  energy,  mining  equipment,  and fluctuations in exchange rates, particularly with respect to the value of the U.S. dollar and Canadian dollar;
  • unusual  or  unexpected  formation,  cave‐ins,  flooding,  pressures,  and  precious  metals  losses,  or  other  similar  events  (and  the  risk  of inadequate insurance or inability to obtain insurance to cover these risks);
  • changes  in  accounting  policies  and  methods  we  use  to  report  our  financial  condition,  including  uncertainties  associated  with  critical accounting assumptions and estimates;
  • environmental issues and liabilities associated with mining including processing and stock piling ore;
  • geopolitical uncertainty and political and economic instability in countries which we operate; and
  • labour strikes, work stoppages, or other interruptions to, or difficulties in, the employment of labour in markets in which we operate mineral projects or mines, or environmental hazards, industrial accidents or other events or occurrences, including third party interference that interrupt the production of minerals in our mines.

For further information, investors should review the Company’s filings that are available at www.sedar.com.

Cautionary Note to U.S. Investors Concerning Reserve Estimates

The mineral reserves disclosed in this news release have been estimated in accordance with Canadian National Instrument 43‐101 ‐ Standards of Disclosure  for  Mineral  Projects  (“NI  43‐101”),  as  required  by  Canadian  securities  regulatory  authorities.  The  Company  is  not  subject  to  the reporting  requirements  of  section  13(a)  of  section  15(d)  of  the  United  States  Securities  Exchange  Act  of  1934,  as  amended  (the  “Exchange Act”).  However, the Company’s U.S. investors are cautioned that SEC Industry Guide 7 under the Exchange Act, as interpreted by Staff of the SEC, applies different standards in order to classify mineralization as a reserve.  As a result, the definitions of proven and probable reserves used in NI 43‐101 differ from the definitions in the SEC Industry Guide 7.  Under SEC standards, mineralization may not be classified as a “reserve” unless the  determination  has  been  made  that  the  mineralization  could  be  economically  and  legally  produced  or  extracted  at  the  time  the  reserve determination is made.  Among other things, all necessary permits would be required to be in hand or issuance imminent in order to classify mineralized material as reserves under the SEC standards.  Accordingly, mineral reserve estimates contained in this news release may not qualify as “reserves” under SEC standards.  In addition, disclosure of “contained ounces” is permitted disclosure under Canadian regulations; however, the SEC only permits Exchange Act reporting companies to report reserves in ounces, and requires reporting of mineralization that does not qualify as reserves as in place tonnage and grade without reference to unit measures.