Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NCAU.V ·

Newcore Gold Increases Drill Program to 60,000 Metres at the Enchi Gold Project, Ghana

Exploration Programs

NEWS RELEASE

Suite 1560 - 200 Burrard Street www.newcoregold.com

Vancouver, British Columbia V6C 3L6 [email protected]

Newcore Gold Increases Drill Program to 60,000 Metres

at the Enchi Gold Project, Ghana

March 12, 2026 TSX-V: NCAU, OTCQX: NCAUF

Vancouver, BC – Newcore Gold Ltd. ("Newcore" or the "Company") (TSX-V: NCAU,

OTCQX: NCAUF) is pleased to announce that on the back of the success achieved to date with

drilling at the Company’s Enchi Gold Project ("Enchi" or the "Project") in Ghana, and additional

cash proceeds of approximately $10 million from the exercise of warrants that were exercised

prior to expiry on February 27, 2026, the Company has increased its current drill program to

60,000 metres, with three active drill rigs on site.

Luke Alexander, President and CEO of Newcore stated, "We are excited to be in a strong cash

position to continue to advance the development of our Enchi Gold Project while unlocking

the district scale potential through the drill bit. With the Pre-Feasibility Study well underway

and on track for completion by the end of June 2026, our drilling has shifted focus to defining

the longer-term growth potential at Enchi within the high-grade structures that extend at

depth. We have a busy year ahead as we focus on project development alongside exploration

to further realize the potential of our Enchi Gold Project in Ghana."

Greg Smith, Vice President of Exploration of Newcore stated, "We have an active year ahead

as drilling continues at Enchi with a focus on resource growth, with an expanded 60,000 metre

drill program underway and three drill rigs active on site. The first phase of our drill program

delivered strong results targeting shallow gold mineralization, highlighting strong continuity

and wide zones of mineralization within the first 100 vertical metres. With the drill program now

in its second phase at Enchi, targeting mineralization below a vertical depth of 200 metres, we

look forward to building on the exciting first diamond drill results as we prove out the higher-

grade potential at depth."

In addition to drilling, development work in support of advancing the Enchi Gold Project

continues with a Pre-Feasibility Study targeted for completion by the end of June 2026. Further

work is underway to advance the technical merits of the Project, including metallurgical

testwork, hydrogeological testing, geotechnical work, and environmental work.

Enchi Current Drill Program

The 60,000 metre drill program underway at Enchi commenced August 2024, targeting near-

surface oxide and shallow fresh mineralization. The drill program is in its second phase and is

focused on discovery and resource growth, including drilling targeting the potential for

resource growth along strike at existing deposits along with diamond drilling targeting the

higher-grade potential at depth. The primary goal of the completed first phase of the drill

program was Reverse Circulation ("RC") infill drilling for resource conversion to improve the

confidence level of the existing Mineral Resource Estimate, with most of the first phase of the

drill program allocated to the two largest deposits at Enchi, Boin and Sewum. All deposit areas

- 2 -

and pre-resource targets at Enchi remain open along strike and at depth, providing for future

resource growth across the district-scale property.

Newcore Gold Best Practice

Newcore is committed to best practice standards for all exploration, sampling and drilling

activities. Drilling was completed by an independent drilling firm using industry standard RC

and Diamond Drill equipment. Analytical quality assurance and quality c ontrol procedures

include the systematic insertion of blanks, standards and duplicates into the sample strings.

Samples are placed in sealed bags and shipped directly to Intertek Labs located in Tarkwa,

Ghana for 50 gram gold fire assay.

Qualified Person

Mr. Gregory Smith, P. Geo, Vice President of Exploration at Newcore, is a Qualified Person as

defined by NI 43 -101, and has reviewed and approved the technical data and information

contained in this news release. Mr. Smith has verified the technical and scientific data disclosed

herein and has conducted appropriate verification on the underlying data including

confirmation of the drillhole data files against the original drillhole logs and assay certificates.

About Newcore Gold Ltd.

Newcore Gold is advancing its Enchi Gold Project located in Ghana, Africa’s largest gold

producer (1). Newcore Gold offers investors a unique combination of top -tier leadership, who

are aligned with shareholders through their 13% equity ownership , and prime district scale

exploration opportunities. Enchi’s 248 km 2 land package covers 40 kilometres of Ghana’s

prolific Bibiani Shear Zone, a gold belt which hosts several multi-million-ounce gold deposits,

including the Chirano mine 50 kilomet res to the north. Newcore’s vision is to build a

responsive, creative and powerful gold enterprise that maximizes returns for shareholders.

(1) Source: Production volumes for 2024 as sourced from the World Gold Council.

On Behalf of the Board of Directors of Newcore Gold Ltd.

Luke Alexander

President, CEO & Director

For further information, please contact:

Mal Karwowska | Vice President, Corporate Development and Investor Relations

+1 604 484 4399

[email protected]

www.newcoregold.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined

in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy

of this release.

Cautionary Note Regarding Forward-Looking Statements

This news release includes statements that contain "forward-looking information" within the meaning of the

applicable Canadian securities legislation ("forward-looking statements"). All statements, other than statements

- 3 -

of historical fact, are forward-looking statements and are based on expectations, estimates and projections as at

the date of this news release. Any statement that involves discussion with respect to predictions, expectations,

beliefs, plans, projections, objectives, assumptions, future events or performance (often, but not always using

phrases such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends",

"anticipates", or "believes" or variations (including negative variations) of such words and phrases, or state that

certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved) are not

statements of historical fact and may be forward-looking statements. In this news release, forward-looking

statements relate, among other things, to: statements about the estimation of mineral resources; results of

preliminary economic assessments; timing, content and completion of a pre -feasibility study; proposed

development plans for the Company; results of metallurgical testwork; results of our ongoing drill campaign;

results of drilling, magnitude or quality of mineral deposits; anticipated advancement of mineral properties or

programs; and future exploration prospects.

These forward-looking statements, and any assumptions upon which they are based, are made in good faith and

reflect our current judgment regarding the direction of our business. The assumptions underlying the forward-

looking statements are based on information currently available to Newcore. Although the forward-looking

statements contained in this news release are based upon what management of Newcore believes, or believed

at the time, to be reasonable assumptions, Newcore cannot assure its shareholders that actual results will be

consistent with such forward-looking statements, as there may be other factors that cause results not to be as

anticipated, estimated or intended. Forward-looking information also involves known and unknown risks,

uncertainties and other factors which may cause the actual results, performance or achievements of the

Company to be materially different from any future results, performance or achievements expressed or implied

by the forward-looking information. Such factors include, among others: risks related to the speculative nature of

Newcore’s business; Newcore’s formative stage of development; Newcore’s financial position; possible

variations in mineralization, grade or recovery rates; actual results of current exploration activities; fluctuations in

general macroeconomic conditions; fluctuations in securities markets; fluctuations in spot and forward prices of

gold and other commodities; fluctuations in currency markets (such as the Canadian dollar to United States dollar

exchange rate); change in national and local government, legislation, taxation, controls, regulations and political

or economic developments; risks and hazards associated with the business of mineral exploration, development

and mining (including environmental hazards, unusual or unexpected geological formations); the presence of

laws and regulations that may impose restrictions on mining; employee relations; relationships with and claims

by local communities; the speculative nature of mineral exploration and development (including the risks of

obtaining necessary licenses, permits and approvals from government authorities); and title to properties.

Forward-looking statements contained herein are made as of the date of this news release and Newcore

disclaims any obligation to update any forward-looking statements, whether as a result of new information, future

events or results, except as may be required by applicable securities laws. There can be no assurance that

forward-looking information will prove to be accurate, as actual results and future events could differ materially

from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-

looking information.