Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NCAU.V ·

Newcore Gold Drilling Intersects 1.79 g/t Gold Over 24.0 Metres and 0.99 g/t Gold Over 29.0 Metres, at the Enchi Gold Project, Ghana RC Drilling at Nyam Intersects High-Grade Gold Mineralization Near Surface; RC Drilling at Kwakyekrom Extends Gold Mineralization by 500 Metres to the North

Drill Results

NEWS RELEASE

Suite 413 - 595 Burrard Street, P.O. 49167 www.newcoregold.com

Vancouver, British Columbia V7X 1J1 [email protected]

Newcore Gold Drilling Intersects 1.79 g/t Gold Over 24.0 Metres and

0.99 g/t Gold Over 29.0 Metres, at the Enchi Gold Project, Ghana

RC Drilling at Nyam Intersects High-Grade Gold Mineralization Near Surface;

RC Drilling at Kwakyekrom Extends Gold Mineralization by 500 Metres to the North

January 11, 2022 TSX-V: NCAU, OTCQX: NCAUF

Vancouver, BC – Newcore Gold Ltd. ("Newcore" or the "Company") (TSX-V: NCAU,

OTCQX: NCAUF) is pleased to announce additional drill results from the 90,000 metre drill

program underway at the Company’s 100% owned Enchi Gold Project ("Enchi" or the "Project")

in Ghana. Reverse Circulation ("RC") drilling at the Nyam Go ld Deposit ("Nyam") at Enchi has

intersected high-grade oxide gold mineralization near surface grading 1.79 grams per tonne

gold ("g/t Au") over 24.0 metres ("m") from 38 m. RC drilling at the Kwakyekrom Gold Deposit

("Kwakyekrom") intersected 0.99 g/t Au over 29.0 m from 81 m, extending the drill-tested gold

mineralization at Kwakyekrom by 500 metres to the north.

Highlights from Drilling at Nyam and Kwakyekrom

• RC drilling at Nyam intersected oxidized gold mineralization near surface, including:

o Hole NBRC092 intersected 1.79 g/t Au over 24.0 m from 38 m, including 4.14 g/t Au over

4.0 m from 51 m.

o Hole NBRC097 intersected 0.87 g/t Au over 25.0 m from 10 m, including 2.59 g/t Au over

4.0 m from 20 m.

• Additional RC drilling at Nyam extend ed the gold mineralization to depth, into the

upper portion of the sulphide zone, including:

o Hole NBRC090 intersected 0.77 g/t Au over 31.0 m from 78 m, including 4.92 g/t Au over

1.0 m from 102 m and 5.19 g/t Au over 1.0 m from 107.

o Hole NBRC093 intersected 0.43 g/t Au over 48 m from 79 m, including 1.79 g/t Au over

4.0 m from 84 m and 1.32 g/t Au over 3.0 m from 99 m.

• RC drilling at Kwakyekrom has extended mineralization 500 m north, increasing drill

tested strike length of gold mineralization to 1.5 km, including:

o Hole KKRC080 intersected a gold mineralized structure grading 0.99 g/t Au over 29.0 m

from 81 m, and a second zone of 1.67 g/t Au over 3.0 m from 40 m.

o Hole KKRC075 intersected 2.31 g/t Au over 7.0 m from 53 m.

o Hole KKRC076 intersected 1.14 g/t Au over 13.0 m from 119 m, and a second zone of

2.29 g/t Au over 2.0 m from 189 m.

Greg Smith, VP Exploration of Newcore stated, " We continue to encounter strong results at

both the Nyam and Kwakyekrom deposit areas at Enchi, highlighting the potential for resource

growth across the Project. Nyam continues to encounter high-grade oxide gold mineralization

near surface, while also extending the mineralization at depth into the upper portions of the

sulphide zone. These drill results also included drilling focused on testing Kwakyekrom to the

north of the existing pit-constrained mineral resource area, with drilling successfully expanding

- 2 -

the known mineralization by 500 metres to the north and increasing the drill tested strike extent

of gold mineralization at Kwakyekrom to 1.5 kms. We look forward to completing the current

90,000 metre drill program over the next several months as we continue our exploration

program to define Enchi’s district scale potential."

This news release repor ts results for 37 RC holes totalling 5,447 m, including 18 RC holes

totalling 2,319 m (NBRC090 to NBRC107) targeting the Nyam Gold Deposit and 19 RC holes

totalling 3,128 m (KKRC066 to KKRC084) targeting the Kwakyekrom Gold Deposit. 33 of the

37 RC holes intersected gold mineralization.

Select assay results from the 37 holes of the drill program reported in this release are below:

Table 1 - Enchi Gold Project Drill Highlights

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t)

NBRC092 Nyam 38.0 62.0 24.0 1.79

including 51.0 55.0 4.0 4.14

NBRC090 Nyam 78.0 109.0 31.0 0.77

including 102.0 103.0 1.0 4.92

including 107.0 108.0 1.0 5.19

NBRC097 Nyam 10.0 35.0 25.0 0.87

including 20.0 24.0 4.0 2.59

NBRC093 Nyam 79.0 127.0 48.0 0.43

including 84.0 88.0 4.0 1.79

including 99.0 102.0 3.0 1.32

NBRC095 Nyam 61.0 75.0 14.0 0.72

including 70.0 74.0 4.0 1.42

and 105.0 125.0 20.0 0.90

including 111.0 114.0 3.0 2.38

NBRC104 Nyam 78.0 98.0 20.0 0.84

and 108.0 119.0 11.0 0.87

KKRC080 Kwakyekrom 40.0 43.0 3.0 1.67

and 81.0 110.0 29.0 0.99

KKRC075 Kwakyekrom 53.0 60.0 7.0 2.31

KKRC076 Kwakyekrom 119.0 132.0 13.0 1.14

and 189.0 191.0 2.0 2.29

Notes:

1. See detailed table for complete results

2. Intervals reported are hole lengths with true width estimated to be 75 - 85%

3. Length-weighted averages from uncut assays

Plan maps showing the drill hole locations can be viewed at:

https://newcoregold.com/site/assets/files/5749/2022_01-ncau-nr-enchi-plan-maps-l.pdf

- 3 -

Cross sections showing drill results and highlights for hole s NBRC092 and KKRC080 can be

viewed at:

https://newcoregold.com/site/assets/files/5749/2022_01-ncau-crosssections-nbrc092-kkrc080-l.pdf

A complete list of the 2020 - 2021 drill results released to date, including hole details, can be

viewed at:

https://newcoregold.com/site/assets/files/5749/2022_01-ncau-enchi-2020-2021-drill-results-l.pdf

For the total planned 90,000 metre drill program, assay results have now been received and

released for 396 holes representing 68,317 metres.

Drilling at Nyam

Drilling at Nyam completed on the north -central portion included new sections within the

existing deposit area, testing both up-dip and down-dip. A series of holes tested the up -dip

portion of the gold mineralization in the near surface oxidized zone, with NBRC092 drilled on

a new section in the central portion of the zone intersecting 1.79 g/t Au over 24.0 m from

38 m, i ncluding 4.14 g/t Au over 4.0 m from 51 m and a second zone with 0.61 g/t Au over

4.0 m from 9 m. NBRC097 collared 250 metres to the north intersected 0.87 g/t Au over

25.0 m from 10 m, including 2.59 g/t Au over 4.0 m from 20 m.

RC drilling at Nyam extended the gold mineralization to depth into the upper portion of the

sulphide zone intersecting wide zones of gold mineralization with higher -grade core

structures. NBRC090 intersected 0.77 g/t Au over 31.0 m from 78 m, including 4.92 g/t Au over

1.0 m from 102 m and 5.19 g/t Au over 1.0 m from 107 m. NBRC093 drilled 50 metres north of

NBRC090 intersected 0.43 g/t Au over 48 .0 m from 79 m, including 1.79 g/t Au over 4.0 m

from 84 m and 1.32 g/t Au over 3.0 m from 99 m.

Additional drilling completed incl uded NBRC095, collared 125 metre north of NBRC090,

which intersected an upper zone in the oxides returning 0.72 g/t Au over 14 .0 m from 61 m ,

including 1.42 g/t Au over 4.0 m from 70 m, and a second lower structure in the sulphides with

0.90 g/t Au over 20.0 m from 105 m, including 2.38 g/t Au over 3.0 m from 111 m. NBRC104

drilled 50 metres north of NBRC09 7 also intersected two gold mineralized zones with

0.84 g/t Au over 20.0 m from 78 m and 0.87 g/t Au over 11.0 m from 108 m.

Drilling at Kwakyekrom

Drilling at Kwakyekrom tested the northern extension , successfully extending the gold

mineralization 500 metres to the north of the existing pit-constrained resource area. KKRC080

collared 175 metres north of the existing resource pit intersected 0.99 g/t Au over 29.0 m from

81 m as well as a second gold mineralized structure of 1.67 g/t Au over 3.0 m from 40 m.

KKRC079 drilled north of KKRC080 further extended the drill tested portion of the Kwakyekrom

zone by an additional 75 metres north, testing the down dip extension, intersected 1.84 g/t Au

over 5.0 m from 198 m along with a second structure of 2.61 g/t Au over 2.0 m from 208 m.

KKRC078, collared 400 metres north of the existing resource area, intersected 0.56 g/t Au over

23.0 m from 161 m, along with a second structure of 1.79 g/t Au over 2.0 m from 172 m.

KKRC075, collared 75 metres north of KKRC078, intersected 2.31 g/t Au over 7.0 m from

53 m. KKRC076 drilled on the same section as KKRC075 tested the down dip extension and

- 4 -

intersected 1.14 g/t Au over 13.0 m from 119 m as well as a second structure of 2.29 g/t Au

over 2.0 m from 189 m.

Enchi Gold Project Mineral Resource Estimate

The Enchi Gold Project hosts a pit constrained Inferred Mineral Resource of 70.4 million tonnes

grading 0.62 g/t Au containing 1. 41 million ounces gold (see Newcore news release date d

June 8, 2021). Mineral resource estimation practices are in accordance with CIM Estimation of

Mineral Resource and Mineral Reserve B est Practice Guidelines (November 29, 2019) and

follow CIM Definition Standards for Mineral Resources and Mineral Reserves (May 10, 2014),

that are incorporated by reference into National Instrument 43-101 ("NI 43-101"). The Mineral

Resource Estimate was prepared by independent qualified person Todd McCracken, P. Geo.

of BBA E&C Inc. The technical report, titled "Preliminary Economic Assessment for the Enchi

Gold Project, Enchi, Ghana" has an effective date of June 8, 2021, and is available under the

Company’s profile on SEDAR at www.sedar.com.

2020 - 2021 Enchi Drilling Program

A 90,000 metre discovery and resource expansion drilling program is underway at Enchi

(anticipated completion in Q2 2022). The program includes both RC and diamond drilling and

includes the first deeper drilling on the Project. This drill program includes testing extensions

of the existing resource areas while also testing a number of high priority exploration targets

outside of the Inferred Mineral Resource. Drilling is focused on step out extensions and

exploration drilling at the Sewum, Boin, Nyam and Kwakyekrom Deposits. Additional drilling

is planned at previously drilled zones that are outside of the resource area (Kojina Hill and

Eradi), along with first pass drilling to test a series of kilometre -scale gold-in-soil anomalous

zones with no prior drilling (Nkwanta, Sewum South and other anomalies). All zones represent

high priority targets based on geological, geochemical and geophysical surface work and

previous trenching and drilling.

Nyam Gold Zone

The Nyam Gold Deposit is one of the four deposits which comprise the pit constrained Inferred

Mineral Resource Estimate at Enchi (4.9 million tonnes grading 0.82 g/t Au containing 129,000

ounces). Nyam is located 15 kilometres east of the town of Enchi, with nearby roads and power

and further access provided by a series of drill roads. An airborne geophysical anomaly

coincident with the Nyam Gold Deposit shows a complex series of linear high conductivity

trends, reflective of the multiple sub-parallel gold-bearing structures. As part of the current drill

program results have been received and released for a total of 101 holes representing

17,140 metres at Nyam.

Kwakyekrom Gold Zone

The Kwakyekrom Gold Deposit is one of the four deposits which comprise the pit constrained

Inferred Mineral Resource Estimate at Enchi (2.7 million tonnes grading 0.64 g/t Au containing

55,600 ounces), with an initial resource defined at Kwakyekrom as part of the updated Mineral

Resource Estimate announced in June 2021. Kwakyekrom is located 15 kilometres south east

of the town of Enchi, with nearby roads and power and further access provided by a series of

drill roads. The Kwakyekrom structure is interpreted to be an extension of the Nyam structure

- 5 -

and is located five kilometres south of Nyam. As part of the current drill program results have

been received and released for a total of 68 holes representing 10,794 metres at Kwakyekrom.

Drill Hole Locations

Table 2 - Enchi Gold Project Drill Hole Location Details

Hole ID UTM East UTM North Elevation Azimuth ° Dip ° Length (m)

KKRC066 529459 636214 80 298 -60 138

KKRC067 529362 636053 110 298 -60 152

KKRC068 529534 636175 93 298 -60 144

KKRC069 529156 635702 113 298 -60 150

KKRC070 529236 635656 109 298 -60 160

KKRC071 529055 635525 90 298 -60 162

KKRC072 529126 635490 96 298 -60 166

KKRC073 529260 635869 96 298 -60 156

KKRC074 529331 635828 88 298 -60 162

KKRC075 528961 635355 100 298 -60 150

KKRC076 529022 635319 97 298 -60 200

KKRC077 528913 635267 112 298 -60 162

KKRC078 528983 635231 97 298 -60 192

KKRC079 528950 635137 90 298 -60 210

KKRC080 528825 635093 94 298 -60 162

KKRC081 528901 635052 98 298 -60 156

KKRC082 528840 634942 102 298 -60 150

KKRC083 528894 634916 98 298 -60 188

KKRC084 529438 635997 87 298 -60 168

NBRC090 530663 638009 110 300 -60 160

NBRC091 530704 637995 106 300 -60 204

NBRC092 530670 638079 139 300 -60 129

NBRC093 530683 638040 130 300 -60 183

NBRC094 530669 638118 137 300 -63 132

NBRC095 530726 638099 90 300 -60 138

NBRC096 530681 638193 109 300 -60 130

NBRC097 530805 638296 84 300 -60 82

NBRC098 530925 638536 136 300 -60 126

NBRC099 530901 638474 112 300 -60 130

NBRC100 530813 638335 78 300 -60 120

NBRC101 530817 638367 100 300 -60 83

NBRC102 530848 638350 89 300 -60 120

- 6 -

Hole ID UTM East UTM North Elevation Azimuth ° Dip ° Length (m)

NBRC103 530854 638384 85 300 -60 126

NBRC104 530849 638314 87 300 -60 120

NBRC105 530737 638212 89 300 -60 132

NBRC106 530548 637825 77 300 -60 138

NBRC107 530547 637889 78 300 -60 66

COVID-19 Protocols

Newcore’s first priority is the health and safety of all employees, contractors, and local

communities. The Company is following all Ghana guidelines and requirements related to

COVID-19. The Company has implemented COVID-19 protocols for its ongoing drill program

consisting of the mandatory use of personal protective equipment (including facemasks for all

employees), maintaining social distancing, frequent hand washing, and daily temperature

checks at the start of each shift.

Newcore Gold Best Practice

Newcore is committed to be st practice standards for all exploration, sampling and drilling

activities. Drilling was completed by an independent drilling firm using industry standard RC

and Diamond Drill equipment. Analytical quality assurance and quality control procedures

include the systematic insertion of blanks, standards and duplicates into the sample strings.

Samples are placed in sealed bags and shipped directly to Intertek Labs located in Tarkwa,

Ghana for 50 gram gold fire assay.

Qualified Person

Mr. Gregory Smith, P. Geo, Vice President of Exploration of Newcore, is a Qualified Person as

defined by NI 43 -101, and has reviewed and approved the technical data and information

contained in this news release. Mr. Smith has verified the technical and scientific data disclosed

herein and has conducted appropriate verification on the underlying data including

confirmation of the drillhole data files against the original drillhole logs and assay certificates.

About Newcore Gold Ltd.

Newcore Gold is advancing its Enchi Gold Project located in Ghana, Africa’s largest gold

producer (1). The Project currently hosts an Inferred Mineral Resource of 1.41 million ounces of

gold at 0.62 g/t (2). Newcore Gold offers investors a unique combination of top-tier leadership,

who are aligned with shareholders through their 27% equity ownership, and prime district

scale exploration opportunities. Enchi’s 216 km2 land package covers 40 kilometres of Ghana’s

prolific Bibiani Shear Zone, a gold belt which hosts several 5 million -ounce gold deposits,

including Kinross’ Chirano mine 50 kilometers to the north. Newcore’s vision is to build a

responsive, creative and powerful gold enterprise that maximizes returns for shareholders.

On Behalf of the Board of Directors of Newcore Gold Ltd.

Luke Alexander

President, CEO & Director

- 7 -

For further information, please contact:

Mal Karwowska | Vice President, Corporate Development and Investor Relations

+1 604 484 4399

[email protected]

www.newcoregold.com

(1) Source: Production volumes for 2020 as sourced from the World Gold Council

(2) Notes for Inferred Mineral Resource Estimate:

1. CIM definition standards were followed for the resource estimate.

2. The 2021 resource models used ordinary kriging (OK) grade estimation within a three-dimensional block model

with mineralized zones defined by wireframed solids and constrained by pits shell for Sewum, Boin and Nyam.

Kwakyekrom used Inverse Distance squared (ID2).

3. A base cut-off grade of 0.2 g/t Au was used with a capping of gold grades varied by deposit and zone.

4. A US$1,650/ounce gold price, open pit with heap leach operation was used to determine the cut -off grade of

0.2 g/t Au. Mining costs of US$ 1.40 for oxides, US$2.10 for transition, and US$2.60 for fresh rock per mined

tonne and G&A and milling costs of US$ 6.83/milled tonne. The Inferred Min eral Resource Estimate is pit

constrained.

5. Metallurgical recoveries have been applied to four individual deposits and in each case three material types

(oxide, transition, and fresh rock) with average recoveries of 77% for Sewum, 79% for Boin, 60% for Nyam and

72% for Kwakyekrom.

6. A density of 2.20 g/cm3 for oxide, 2.45 g/cm3 for transition, and 2.70 g/cm3 for fresh rock was applied.

7. Optimization pit slope angles varied based on the rock types.

8. Mineral Resources that are not mineral reserves do not have economic viability. Numbers may not add due to

rounding.

9. These numbers are from the technical report titled " Preliminary Economic Assessment for the Enchi Gold

Project, Enchi, Ghana", with an effective date of June 8, 2021, prepared for Newcore Gold by BBA E&C Inc. in

accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects and is available under

Newcore’s SEDAR profile at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined

in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy

of this release.

Cautionary Note Regarding Forward-Looking Statements

This news release includes statements that contain "forward -looking information" within the meaning of

the applicable Canadian securities legislation ("forward -looking statements"). All statements, other than

statements of historical fact, are forward -looking statements and are based on expectations, estimates

and projections as at the date of this news release. Any statement that involves discussion with respect to

predictions, expectations, beliefs, plans, projections, objectives, assumptions, future even ts or

performance (often, but not always using phrases such as "plans", "expects", "is expected", "budget",

"scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or variations (including

negative variations) of such words and phras es, or state that certain actions, events or results "may",

"could", "would", "might" or "will" be taken, occur or be achieved) are not statements of historical fact

and may be forward-looking statements. In this news release, forward -looking statements relate, among

other things, to: statements about the estimation of mineral resources; results of our ongoing drill

campaign, magnitude or quality of mineral deposits; anticipated advancement of mineral properties or

programs; and future exploration prospects.

These forward-looking statements, and any assumptions upon which they are based, are made in good

faith and reflect our current judgment regarding the direction of our business. The assumptions

underlying the forward -looking statements are based on infor mation currently available to Newcore.

Although the forward -looking statements contained in this news release are based upon what

management of Newcore believes, or believed at the time, to be reasonable assumptions, Newcore

cannot assure its shareholders that actual results will be consistent with such forward-looking statements,

- 8 -

as there may be other factors that cause results not to be as anticipated, estimated or intended. Forward-

looking information also involves known and unknown risks, uncertainties and other factors which may

cause the actual results, performance or achievements of the Company to be materially different from

any future results, performance or achievements expressed or implied by the forward -looking

information. Such factors include, among others: risks related to the speculative nature of the Company’s

business; the Company’s formative stage of development; the Company’s financial position; possible

variations in minerali zation, grade or recovery rates; actual results of current expl oration activities;

fluctuations in general macroeconomic conditions; fluctuations in securities markets; fluctuations in spot

and forward prices of gold and other commodities; fluctuations in currency markets (such as the Canadian

dollar to United States dollar exchange rate); change in national and local government, legislation,

taxation, controls, regulations and political or economic developments; risks and hazards associated with

the business of mineral exploration, development and mining (including environmental hazards, unusual

or unexpected geological formations); the presence of laws and regulations that may impose restrictions

on mining; employee relations; relationships with and claims by local communities; the speculative

nature of mineral explor ation and development (including the risks of obtaining necessary licenses,

permits and approvals from government authorities); and title to properties.

Forward-looking statements contained herein are made as of the date of this news release and the

Company disclaims any obligation to update any forward-looking statements, whether as a result of new

information, future events or results, except as may be required by applicable securities laws. There can

be no assurance that forward -looking information wil l prove to be accurate, as actual results and future

events could differ materially from those anticipated in such statements. Accordingly, readers should not

place undue reliance on forward-looking information.