Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NCAU.V ·

Newcore Gold Drilling Intersects 1.23 g/t Gold over 33.0 Metres, Including 2.16 g/t Gold over 13.0 Metres, at the Enchi Gold Project, Ghana Diamond Drilling at the Boin Gold Deposit Intersects Gold Mineralization in the Fresh

Drill Results

NEWS RELEASE

Suite 610 - 815 West Hastings St. www.newcoregold.com

Vancouver, British Columbia V6C 1B4 [email protected]

Newcore Gold Drilling Intersects 1.23 g/t Gold over 33.0 Metres,

Including 2.16 g/t Gold over 13.0 Metres, at the Enchi Gold Project, Ghana

Diamond Drilling at the Boin Gold Deposit Intersects Gold Mineralization in the Fresh

Mineralization, Below the Limits of the Pits that Constrain the Mineral Resource Estimate

May 6, 2026 TSX-V: NCAU, OTCQX: NCAUF

Vancouver, BC – Newcore Gold Ltd. ("Newcore" or the "Company") (TSX-V: NCAU,

OTCQX: NCAUF) is pleased to announce additional drill results from the 60,000 -metre drill

program underway at the Company’s Enchi Gold Project ("Enchi" or the "Project") in Ghana .

Diamond Drilling ( "DD") at the Boin Gold Deposit ( "Boin") encountered wide zones of gold

mineralization in the fresh mineral horizon, below the limits of the pits that constrain the Mineral

Resource Estimate. Hole KBDD107 intersected 1.23 grams per tonne gold ("g/t Au") over 33.0

metres ("m") from 337.0 m, including 2.16 g/t Au over 13.0 m from 357.0 m. Hole KBDD111

also intersected a wide zone of gold mineralization including 1.38 g/t Au over 15.0 m from

193.0 m, with a high-grade interval of 5.99 g/t Au over 3.0 m from 204.0 m. This news release

reports results for diamond drilling completed at Boin. Drilling continues to demonstrate the

continuity of gold mineralization and potential for resource growth at Enchi.

Highlights from Diamond Drilling at the Boin Gold Deposit at Enchi

• Drilling intersected wide zones of gold mineralization below the limits of the pits that

constrain the Mineral Resource Estimate.

o Diamond drill hole KBDD107 intersected 1.23 g/t Au over 33.0 m from 337.0 m,

including 2.16 g/t Au over 13.0 m from 357.0 m.

o Hole KBDD111 intersected 1.38 g/t Au over 15.0 m from 193.0 m, with a high-grade

interval of 5.99 g/t Au over 3.0 m from 204.0 m.

o Hole KBDD109 intersected 1.56 g/t Au over 11.1 m from 252.9 m, including 2.84 g/t Au

over 4.0 m from 259.0 m.

• Drill results not included in most recent Mineral Resource Estimate, with drilling

continuing to prove out the potential for future resource growth at Enchi.

o Boin is the second largest deposit currently identified at Enchi and remains open along

strike and at depth.

o This drilling reached a maximum vertical depth of 375 metres, the deepest intercepts

drilled to date at Boin. The average vertical depth of all holes drilled to date at Boin is

only down to 100 metres.

Greg Smith, VP Exploration of Newcore stated, "Drilling at our Enchi Gold Project in Ghana

continues to highlight the potential for future resource growth, with recent diamond drilling at

Boin successfully extending high-grade gold mineralization below the current pit constrained

Mineral Resource Estimate. These results support further drilling at depth as we advance our

understanding of the Project’s scale, continuity and longer-term district scale potential."

- 2 -

This release reports results for 10 DD holes totalling 3,654 m ( KBDD106 to KBDD115A)

targeting the Boin Gold Deposit, with all holes intersecting gold mineralization. A total of

38,458 m in 266 holes has been reported as part of the ongoing drill program at Enchi, with

98% of holes intersecting gold mineralization.

Select assay results from the 10 holes of the drill program reported in this release are below:

Table 1 - Enchi Gold Project Drill Highlights

Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t)

KBDD107 Boin 337.0 370.0 33.0 1.23

including 357.0 370.0 13.0 2.16

KBDD111 Boin 193.0 208.0 15.0 1.38

including 204.0 207.0 3.0 5.99

KBDD109 Boin 252.9 264.0 11.1 1.56

including 259.0 263.0 4.0 2.84

KBDD113 Boin 353.0 377.0 24.0 0.64

including 354.0 359.5 5.5 1.39

KBDD115A Boin 316.0 325.0 9.0 1.21

including 316.0 319.3 3.3 2.30

Notes:

1. See detailed table for complete results;

2. Intervals reported are hole lengths with true width estimated to be 75 - 85%; and

3. Length-weighted averages from uncut assays.

A plan map showing the drill hole locations can be viewed at:

https://newcoregold.com/site/assets/files/5964/2026_05_06-ncau-nr-enchi-plan-map-boin.pdf

A cross section showing drill results and highlights for hole KBDD107 can be viewed at:

https://newcoregold.com/site/assets/files/5964/2026_05-ncau-crosssection-kbdd107.pdf

A complete list of the drill results in this release, including hole details, can be viewed at:

https://newcoregold.com/site/assets/files/5964/2026_05_06-ncau-enchi-2024-2025-drill-results.pdf

Diamond Drilling at the Boin Gold Deposit

KBDD106 to KBDD115A (10 DD holes totalling 3,654 m) were completed at Boin, targeting

mineralization below the limits of the pits that constrain the Mineral Resource Estimate . This

drilling also targeted mineralization within the fresh mineral horizon at Boin with the goal of

continuing to expand high-grade mineralization at depth. The 10 holes tested three high -

grade shoots at depth which were previously identified through drilling, each approximately

400 to 500 metres in length. The drilling extended thes e high-grade shoots along strike and

down dip, reaching a maximum vertical depth of 375 metres. This is the deepest drilling

completed to date at Boin, intersecting mineralization below prior intercepts and defining the

continuity of gold mineralization to depth. The holes reported in this news release were

distributed across nine separate sections spread along a 1.7 kms strike length.

- 3 -

Five diamond drill holes totalling 1,689 m ( KBDD106, KBDD107, KBDD109, KBDD110 ,

KBDD114A) tested the central high -grade shoot at Boin . Hole KBDD107 targeted gold

mineralization below the level of the pit which constrains the Mineral Resource Estimate. The

hole extended gold mineralization 100 metres down dip from the previous drilling completed

on the section and intersected the main gold mineralized structure at an approximate vertical

depth of 270 metres below surface. KBDD107 intersected multiple gold mineralized structures

highlighted by 1.23 g/t Au over 33.0 m from 337.0 m, including 2.16 g/t Au over 13.0 m from

357.0 m. Hole KBDD109, collared 300 metres south of KBDD107, intersected 1.56 g/t Au over

11.1 m from 252.9 m, including 2.84 g/t Au over 4.0 m from 259.0 m.

Three diamond drill holes totaling 1,154 m (KBDD111 to KBDD113) tested the northern high-

grade shoot at Boin. Hole KBDD111, drilled approximately one kilometre north of KBDD107,

intersected 1.38 g/t Au over 15.0 m from 193.0 m, with a high -grade interval of 5.99 g/t Au

over 3.0 m from 204.0 m. Hole KBDD113, drilled 150 metres north of KBDD111, intersected

0.64 g/t Au over 24.0 m from 353.0 m, including 1.39 g/t Au over 5.5 m from 354.0 m and a

second structure of 0.45 g/t Au over 21.0 m from 381.0 m including 1.38 g/t Au over 2.0 m

from 400.0 m.

Two diamond drill holes totaling 811 m (KBDD108 and KBDD115A) tested the southern high-

grade shoot at Boin. Hole KBDD115A, drilled approximately one kilometre south of KBDD107,

intersected 1.21 g/t Au over 9.0 m from 316.0 m, with a higher-grade sub-interval of 2.30 g/t

Au over 3.3 m from 316.0 m.

Diamond drilling completed at Boin continues to confirm continuity down dip for the principal

structures which comprise the central portion of the Boin Gold Deposit. The width and gold

grades within these drill results are consistent with prior drilling completed in this area.

Enchi Work Program

The 60,000 metre drill program underway at Enchi commenced August 2024, targeting near-

surface oxide and transition mineralization along with shallow fresh mineralization. The drill

program is in its second phase and is focused on discovery and resource growth, including

drilling targeting the potential for resource growth along strike at existing deposits along with

diamond drilling targeting the higher -grade potential at depth. The primary goal of the

completed first phase of the drill program was Reverse Circulation ( "RC") infill drilling for

resource conversion to improve the confidence level of the existing Mineral Resource Estimate,

with most of the first phase of the drill program allocated to the two largest deposits at Enchi,

Boin and Sewum. All deposit areas and pre-resource targets at Enchi remain open along strike

and at depth, providing for future resource growth across the district-scale property.

In addition to drilling, a Pre-Feasibility Study ("PFS") is underway and targeted for completion

by the end of June 2026 (see news release dated February 5, 2026 ), alongside on -going

development work in support of project advancement at Enchi which includes metallurgical

testwork, hydrogeological testing, geotechnical work, and environmental work.

Boin Gold Deposit

Boin is one of the five deposits which comprise the Mineral Resource Estimate at Enchi (Boin

has an Indicated Mineral Resource of 23.5 million tonnes grading 0. 73 g/t Au containing

- 4 -

550,000 ounces and an Inferred Mineral Resource of 9.2 million tonnes grading 0. 60 g/t Au

containing 178,000 ounces). Boin is located 10 kilometres south of the town of Enchi, with

nearby roads and power and further access provided by a series of drill roads. Boin is outlined

on surface by a greater than six -kilometre-long by up to one -kilometre-wide gold in s oil

anomaly. An airborne geophysical anomaly coincident with the Boin structure extends for a

further kilometre north and three kilometres south beyond the limits of current drilling. To date,

approximately 40% of the gold-in-soil anomaly at Boin is untested by drilling, with the average

vertical depth of all holes drilled to date at Boin only down to 100 metres.

Drill Hole Locations

Table 2 - Enchi Gold Project Drill Hole Location Details

Hole ID UTM East UTM North Elevation Azimuth ° Dip ° Length (m)

KBDD106 519156 634052 126 114 -55 264.4

KBDD107 519068 634166 133 114 -60 380.0

KBDD108 518695 633507 138 114 -56 339.4

KBDD109 519015 633881 165 114 -60 245.0

KBDD110 519166 634241 133 114 -60 339.3

KBDD111 519535 634846 134 114 -52 279.5

KBDD112 519491 634826 120 114 -70 450.6

KBDD113 519552 634906 127 114 -73 423.7

KBDD114A 519183 634365 156 114 -75 460.0

KBDD115A 518669 633524 144 114 -61 471.6

Enchi Gold Project Mineral Resource Estimate

The Enchi Gold Project hosts an Indicated Mineral Resource of 83.6 million tonnes grading

0.56 g/t Au containing 1,502,000 ounces gold and an Inferred Mineral Resource of 40.1 million

tonnes grading 0.49 g/t Au containing 626,000 ounces. Mineral resource estimation practices

are in accordance with CIM Estimation of Mineral Resource and Mineral Reserve Best Practice

Guidelines (November 29, 2019) and follow CIM Definition Standards for Mineral Resources

and Mineral Reserves (May 10, 2014), t hat are incorporated by reference into National

Instrument 43-101 ("NI 43-101"). The Mineral Resource Estimate is from the technical report

titled "Technical Report Mineral Resource Estimate Update, Enchi Gold Project, Ghana" dated

May 1, 2026, with an effective date of March 18, 2026, prepared for Newcore by Ryan Wilson,

P. Geo, Matthew Halliday, P. Geo, Schadrac Ibrango, P. Geo of DRA Americas Inc. in

accordance with NI 43 -101, and is available under the Company’s profile on SEDAR+ at

www.sedarplus.ca. These individuals are independent qualified persons ("QP") as defined by

NI 43-101.

Newcore Gold Best Practice

Newcore is committed to best practice standards for all exploration, sampling and drilling

activities. Drilling was completed by independent drilling firms using industry standard RC and

Diamond Drill equipment. Analytical quality assurance and quality control procedures include

the systematic insertion of blanks, standards and duplicates into the sample strings. Samples

- 5 -

are placed in sealed bags and shipped directly to Intertek Labs located in Tarkwa, Ghana for

50 gram gold fire assay.

Qualified Person

Mr. Gregory Smith, P. Geo, Vice President of Exploration at Newcore, is a Qualified Person as

defined by NI 43 -101, and has reviewed and approved the technical data and information

contained in this news release. Mr. Smith has verified the technical and scientific data disclosed

herein and has conducted appropriate verification on the underlying data including

confirmation of the drillhole data files against the original drillhole logs and assay certificates.

About Newcore Gold Ltd.

Newcore Gold is advancing its Enchi Gold Project located in Ghana, Africa’s largest gold

producer (1). Newcore Gold offers investors a unique combination of top -tier leadership, who

are aligned with shareholders through their 1 3% equity ownership, and prime district scale

exploration opportunities. Enchi’s 248 km 2 land package covers 40 kilometres of Ghana’s

prolific Bibiani Shear Zone, a gold belt which hosts several multi-million-ounce gold deposits,

including the Chirano mine 50 kilomet res to the north. Newcore’s vision is to build a

responsive, creative and powerful gold enterprise that maximizes returns for shareholders.

(1) Source: Production volumes for 2024 as sourced from the World Gold Council.

On Behalf of the Board of Directors of Newcore Gold Ltd.

Luke Alexander

President, CEO & Director

For further information, please contact:

Mal Karwowska | Vice President, Corporate Development and Investor Relations

+1 604 484 4399

[email protected]

www.newcoregold.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined

in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy

of this release.

Cautionary Note Regarding Forward-Looking Statements

This news release includes statements that contain "forward -looking information" within the meaning of

the applicable Canadian securities legislation ("forward -looking statements"). All statements, other than

statements of historical fact, are forward -looking statements and are based on expectations, estimates

and projections as at the date of this news release. Any statement that involves discussion with respect to

predictions, expectations, beliefs, plans, projections, objectives, assumptions, future even ts or

performance (often, but not always using phrases such as "plans", "expects", "is expected", "budget",

"scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or variations (including

negative variations) of such words and phras es, or state that certain actions, events or results "may",

"could", "would", "might" or "will" be taken, occur or be achieved) are not statements of historical fact

and may be forward-looking statements. In this news release, forward -looking statements relate, among

other things, to: statements about the estimation of mineral resources; realization of mineral resources

- 6 -

estimates; timing, content and completion of a pre -feasibility study; proposed development plans for

the Company; results of metallurgical testwork; results of our ongoing drill campaign; results of drilling,

magnitude or quality of mineral deposits; anticipated advancement of mineral properties or programs;

and future exploration prospects and growth of mineral properties.

These forward-looking statements, and any assumptions upon which they are based, are made in good

faith and reflect our current judgment regarding the direction of our business. The assumptions

underlying the forward -looking statements are based on informa tion currently available to Newcore.

Although the forward -looking statements contained in this news release are based upon what

management of Newcore believes, or believed at the time, to be reasonable assumptions, Newcore

cannot assure its shareholders that actual results will be consistent with such forward-looking statements,

as there may be other factors that cause results not to be as anticipated, estimated or intended. Forward-

looking information also involves known and unknown risks, uncertainties an d other factors which may

cause the actual results, performance or achievements of the Company to be materially different from

any future results, performance or achievements expressed or implied by the forward -looking

information. Such factors include, am ong others: risks related to the speculative nature of Newcore’s

business; Newcore’s formative stage of development; Newcore’s financial position; possible variations in

mineralization, grade or recovery rates; actual results of current exploration activit ies; fluctuations in

general macroeconomic conditions; fluctuations in securities markets; fluctuations in spot and forward

prices of gold and other commodities; fluctuations in currency markets (such as the Canadian dollar to

United States dollar exchange rate); change in national and local government, legislation, taxation,

controls, regulations and political or economic developments; risks and hazards associated with the

business of mineral exploration, development and mining (including environmental haz ards, unusual or

unexpected geological formations); the presence of laws and regulations that may impose restrictions on

mining; employee relations; relationships with and claims by local communities; the speculative nature

of mineral exploration and development (including the risks of obtaining necessary licenses, permits and

approvals from government authorities); and title to properties.

Forward-looking statements contained herein are made as of the date of this news release and Newcore

disclaims any obligation to update any forward -looking statements, whether as a result of new

information, future events or results, except as may be requi red by applicable securities laws. There can

be no assurance that forward -looking information will prove to be accurate, as actual results and future

events could differ materially from those anticipated in such statements. Accordingly, readers should not

place undue reliance on forward-looking information.

1km

2024 - 2026 Drill Program | Enchi Gold Project

Boin, Ghana (As of May 2026)

Pit Shell

Outline

Previous Drill Holes

Legend

Drill Hole

Prior 2024 - 2026

Assays Announced

Drill Hole

Assays Announced

May 6, 2026

Map Area

KBDD111

KBDD112

KBDD114A

KBDD110

KBDD109

KBDD115A

KBDD108

KBDD113

KBDD106

KBDD107

NORTH

SECTOR

CENTRAL

SECTOR

BOIN

NORTHWEST

100 Elev

0 Elev

-100 Elev

-200 Elev

101

KBDD051

155

KBDD049

174

KBRC364

200

KBRC311

380

KBDD107

0.19 g/t Au over 3 m

0.25 g/t Au over 1 m

1.23 g/t Au over 33.0 m

incl. 2.16 g/t Au over 13.0 m

0.55 g/t Au over 4.0 m

0.59 g/t Au over 2.0 m

0.31 g/t Au over 1.0 m

0.31 g/t Au over 2.0 m

0.41 g/t Au over 11.0 m

0.36 g/t Au over 12.0 m

1.25 g/t Au over 2 m

0.32 g/t Au over 1 m

0.24 g/t Au over 1 m

0.29 g/t Au over 1 m

0.37 g/t Au over 1 m

0.26 g/t Au over 1 m

0.29 g/t Au over 21 m

0.26 g/t Au over 1 m

0.52 g/t Au over 1 m

0.82 g/t Au over 1 m

0.21 g/t Au over 1 m

0.42 g/t Au over 14 m

0.72 g/t Au over 1 m

0.97 g/t Au over 9 m

2024 - 2026 Drill Program | Enchi Gold Project

Boin Deposit - Cross Section (A - A’)

KBDD107

Viewing Northeast, May 2026

Drillhole trace

Mineralized Zone

LEGEND

2026 Resource Pit Shell

(US$3,200/oz Au)

100 m0 50 m

surface

Oxide Zone

OPEN

TO DEPTH