Newcore Gold Completes 90,000 Metre Drill Program, Significantly Expanding the Mineralized Footprint at the Enchi Gold Project, Ghana High-Grade Encountered in Sulphides at Depth, Footprint of Oxide Mineralization Expanded at all Resource Areas, Three Greenfield Discoveries Made on the Project
NEWS RELEASE
Suite 1560 - 200 Burrard Street www.newcoregold.com
Vancouver, British Columbia V6C 3L6 [email protected]
Newcore Gold Completes 90,000 Metre Drill Program, Significantly
Expanding the Mineralized Footprint at the Enchi Gold Project, Ghana
High-Grade Encountered in Sulphides at Depth, Footprint of Oxide Mineralization
Expanded at all Resource Areas, Three Greenfield Discoveries Made on the Project
July 27, 2022 TSX-V: NCAU, OTCQX: NCAUF
Vancouver, BC – Newcore Gold Ltd. ("Newcore" or the "Company") (TSX-V: NCAU,
OTCQX: NCAUF) is pleased to announce final drill results and the completion of a successful
90,000 metre drill program at the Company’s 100% owned Enchi Gold Project ("Enchi" or the
"Project") in Ghana. Newcore’s multi-pronged exploration approach delivered on its goals:
(i) Successfully outlined the potential resource growth along strike at all four deposits
(Sewum, Boin, Nyam, Kwakyekrom);
(ii) Encountered strong results at previously drilled zones outside of the resource area
(Kojina Hill, Eradi);
(iii) Intersected high-grade gold at depth, outlining the potential to delineate underground
resources; and
(iv) Identified new discoveries from successful first pass drilling on early -stage targets
(Sewum South, Tokosea, Sewum Ext. Parallel Structure).
The largest drill program to ever be completed on the Project was successful in highlighting
the district scale potential across the 216 km 2 property and the strong potential to delineate
additional resources at Enchi . Results from the drill program will be incorporated into an
updated Mineral Resource Estimate expected to be completed by the end of 2022. Newcore
is now planning the next phase of discovery and resource expansion drilling at Enchi.
Highlights from the 2020 - 2022 Drill Program at Enchi
• Largest drill program to ever be completed at Enchi (92,583 metres ) with results
highlighting the potential for significant resource growth across the Project.
o All deposits and targets remain open along strike and at depth, with drill results
highlighting the potential for resource growth in both shallow oxides and at depth.
• Drilling intersected the highest-grade gold interval to date, outside the limits of the
pit-constrained mineral resource area.
o RC hole KBRC250 at Boin intersected 95.16 g/t Au over 2.0 m from 109 m.
• Deepest Drilling to Date Completed on the Project, Intersected High-Grade
Mineralization in the Sulphides.
o Drilling at Nyam defined two northerly plunging high -grade zones down to a depth of
300 metres which remain open for further expansion. Results include h ole NBDD048
which intersected 4.51 g/t Au over 13.0 m from 236 m.
• Three New Discoveries from First Pass Drilling on New Structures.
o Drilling on a parallel structure at Sewum Extension, located 200 metres east of the
Sewum Deposit, intersected 1.98 g/t Au over 25.0 m from 3.0 m in hole SWRC164.
o Shallow drilling on two of the largest untested anomalies at Enchi, Sewum South and
Tokosea, showcased the potential for additional resource areas across the property.
- 2 -
Luke Alexander, President and CEO of Newcore stated, "Since we relaunched Newcore in mid-
2020, we have not only retained strong alignment with shareholders through management and
director’s 24% equity interest, but we have also built out a very strong institutional shareholder
base that currently owns approximately 40% of the equity, we have completed two resou rce
updates and a Preliminary Economic Assessment, and we have now also completed the largest
drill program ever on the Project. Our multi-pronged exploration approach delivered on the
objectives we set at the start. We outlined near surface resource expan sion potential along
strike at all four of our existing deposits, we achieved strong results from drilling at previously
drilled areas, we encountered high-grade intercepts at depth which outlined the potential for
delineating underground resources, and we made three new greenfield discoveries. We have
only just scratched the surface of the gold potential at Enchi. We look forward to continuing to
unlock the value of Enchi through exploration and the drill bit, with a next phase drill program
currently being planned for later this summer."
Greg Smith, VP Exploration of Newcore stated, "This drill program has significantly advanced
our geological understanding of the potential size and scale at Enchi. Results from this largest-
ever drill program on the Project highlight the potential to define gold mineralization on the
same scale and magnitude as the significant gold deposits along the Sefwi-Bibiani Gold Belt.
The success we have had with drilling, in both oxide and sulphide mineralization, highlights
the potential for Enchi to develop into a much larger project through additional exploration.
We are excited to be on a path to unlocking that potential."
Final Drill Results From the 90,000 Metre Drill Program and On-Going Exploration
Final drill results from the 2020 - 2022 drill program included Reverse Circulation ("RC") drilling
targeting oxide mineralization within the southern extension of the Boin Gold Deposit, as well
as diamond drilling ("DD") targeting deeper mineralization at all resource areas. All holes
intersected gold mineralization, with results including 1.1 6 grams per tonne gold ("g/t Au")
over 20.0 metres ("m") from 221 m in the sulphides, including 4.92 g/t Au over 1.8 m from
221 m at Boin.
Additional exploration work is on -going, including metallurgical testwork and trenching of
high-priority surface anomalies in advance of a next phase drill program anticipated to
commence in late Q3 2022.
Summary of Achievements from the 2020 – 2022 Drill Program
The drill program consisted of 575 holes representing 92,583 metres. The current Mineral
Resource Estimate (completed June 2021) incorporated 20,195 metres of this drilling. Select
highlighted assay results from the drill program are below:
Table 1 - Enchi Gold Project Drill Highlights (2020 - 2022 Drill Program)
Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t)
KBRC250 Boin 109.0 111.0 2.0 95.16
KBRC276 Boin 113.0 216.0 103.0 1.00
KBDD064 Boin 121.0 195.0 74.0 1.28
SWRC093 Sewum 61.0 164.0 103.0 0.82
KBRC141 Boin 48.0 95.0 47.0 1.67
- 3 -
Hole ID Zone/Deposit From (m) To (m) Length (m) Au (g/t)
NBRC075 Nyam 0.0 35.0 35.0 2.04
NBRC045 Nyam 179.0 219.0 40.0 1.57
NBRC017 Nyam 8.0 53.0 45.0 1.38
KBRC236 Boin 55.0 124.0 69.0 0.90
NBDD048 Nyam 236.0 249.0 13.0 4.51
KBRC185 Boin 137.0 204.0 67.0 0.85
SWRC164 Sewum Ext. 3.0 28.0 25.0 1.98
SWRC076 Sewum 104.0 120.0 16.0 3.04
SWRC076 Sewum 39.0 88.0 49.0 0.91
NBRC047 Nyam 222.0 247.0 25.0 1.94
NBRC047 Nyam 227.0 234.0 7.0 5.78
SWRC107 Sewum 4.0 81.0 77.0 0.63
TORC045 Tokosea 30.0 57.0 27.0 1.80
SWRC082 Sewum 36.0 60.0 24.0 2.02
NBDD052 Nyam 321.0 336.0 15.0 3.21
KJRC022 Kojina Hill 61.0 120.0 59.0 0.79
KBRC159 Boin 178.0 240.0 62.0 0.73
NBRC073 Nyam 74.0 131.0 57.0 0.78
SWRC083 Sewum 86.0 108.0 22.0 1.97
SWRC073 Sewum 0.0 28.0 28.0 1.52
NBRC092 Nyam 38.0 62.0 24.0 1.79
NBRC076 Nyam 1.0 51.0 50.0 0.85
KKRC041 Kwakyekrom 0.0 53.0 53.0 0.79
Notes:
1. See detailed table for complete results
2. Intervals reported are hole lengths with true width estimated to be 75 - 85%
3. Length-weighted averages from uncut assays
Plan maps showing the drill hole locations can be viewed at:
https://newcoregold.com/site/assets/files/5776/2022_07-ncau-nr-enchi-plan-maps-l.pdf
A cross section showing drill results and highlights for hole KBDD067 and KBDD075 can be
viewed at:
https://newcoregold.com/site/assets/files/5776/2022_07-ncau-crosssection-kbdd067-l.pdf
A complete list of the 2020 – 2022 drill results, including hole details, can be viewed at:
https://newcoregold.com/site/assets/files/5776/2022_07-ncau-enchi-2020-2022-drill-results-l.pdf
- 4 -
Sewum - Drilling Expanded Mineralization and Intersected New Structures
Drilling expanded the known mineralized footprint at the Sewum Gold Deposit, intersecting
new structures and widespread gold mineralization. Hole SWRC093 intersected a wide zone
of mineralization of 0.82 g/t Au over 103.0 m from 61 m, extending the footprint of known
mineralization at Sewum to the north of the pit -constrained mineral resource area . Hole
SWRC076 drilled on the edge of the pit-constrained mineral resource area intersected 3.04 g/t
Au over 16.0 m from 104 m with a second zone of 0.91 g/t Au over 49.0 m from 39 m. Hole
SWRC107 intersected a wide zone of oxide mineralization returning 0.63 g/t Au over 77.0 m
from 4 m. Hole SWRC082 drilled on the southern extent of the pit-constrained mineral resource
area intersected near surface oxide mineralization of 2.02 g/t Au over 24.0 m from 36 m.
As part of the drill program , a total of 89 holes representing 16,552 metres were drilled at
Sewum. Drilling expanded the drill tested strike extent by 25% to 3.0 kms, with the current pit
constrained mineral resource defined across a strike extent of 2.4 kms. Gold mineralization is
open along strike and down dip.
Sewum is the largest of the four deposits which comprise the pit constrained Inferred Mineral
Resource Estimate at Enchi, hosting approximately 51% of the currently defined resource (41.0
million tonnes grading 0.55 g/t Au containing 725,2 00 ounces) . Sewum is located 15
kilometres southeast of the town of Enchi, with nearby roads and power and further access
provided by a series of drill roads. Sewum is outlined on surface by a six -kilometre-long and
one-to-two-kilometre-wide gold in soil anomaly. An airborne geophysical anomaly coincident
with the Sewum Deposit defines a series of sub parallel and intersecting structures. To date,
approximately 50% of the gold-in-soil anomaly is untested by drilling.
Boin - Drilling Intersected the Highest-Grade Gold Interval to Date
Drilling at Boin intersected the highest-grade gold interval to date on the Project with RC hole
KBRC250 intersecting 95.16 g/t Au over 2.0 m from 109 m, with a second structure of
13.22 g/t Au over 1.0 m from 120 m (true widths unknown). Drilling also expanded the known
mineralized footprint at Boin bo th to the north and south of the pit -constrained mineral
resource area. Wide-spaced exploration drilling extended gold mineralization 400 metres to
the north and 1 .5 km to the south of the current limits of the pit constrained resource.
Additional drilling encountered wide zones of gold mineralization including hole KBRC276
with 1.00 g/t Au over 103.0 m from 113 m and hole KBDD064 with 1.28 g/t Au over 74.0 m
from 121 m. RC drilling expanded the near surface oxide mineralization with wide gold
intercepts including hole KBRC141 intersecting 1.67 g/t Au over 47.0 m from 48 m and hole
KBRC236 intersecting 0.90 g/t Au over 69.0 m from 55 m.
As part of the drill program , a total of 172 holes representing 28,274 metres were drilled at
Boin. Drilling has expanded the drill tested strike extent by 50% to 4.2 kms, with the current pit
constrained mineral resource defined across a strike extent of 2.8 kms. Gold mineralization is
open along strike and down dip.
Boin is one of the primary deposits which comprise the pit constrained Inferred Mineral
Resource Estimate at Enchi, with Boin hosting approximately 36% of the currently defined
resource (21.8 million tonnes grading 0.72 g/t Au containing 504,800 ounces). Boin is located
10 kilometres south of the town of Enchi, with nearby roads and power and further access
provided by a series of drill roads. Boin is outlined on surface by a greater than six -kilometre-
long by up to one -kilometre-wide gold in soil anomaly. An airborne geophysical an omaly
coincident with the Boin structure extends for a further two kilometres north and four
- 5 -
kilometres south beyond the limits of current drilling. To date, approximately 50% of the gold-
in-soil anomaly is untested by drilling.
Nyam – Deepest Drilling Completed to Date, High-Grade Intersected in Sulphides at Depth
Drilling at the Nyam Gold Deposit included the deepest drilling completed to date on the
Project, with high-grade mineralization encountered in the sulphides. Drilling has defined two
northerly plunging high-grade zones down to a depth of 300 metres which remain open for
further expansion. Hole NBDD052 intersected a high -grade gold mineralized structure
grading 5.57 g/t Au over 8.0 m from 322 m, within a broader zone of 3.21 g/t Au over 15.0 m
from 321 m. Hole NBDD048 intersected 4.51 g/t Au over 13.0 m from 236 m and h ole
NBRC047 intersected 1.94 g/t Au over 25.0 m from 222 m. Drilling has also expanded the near
surface oxide mineralization with hole NBRC075 intersecting 2.04 g/t Au over 35.0 m from
surface and hole NBRC017 intersecting 1.38 g/t Au over 45.0 m from 8 m.
As part of the drill program, a total of 104 holes representing 18,087 metres were drilled at
Nyam. Drilling has expanded the drill tested strike extent by 40% to 2.0 kms, with the current
pit constrained mineral resource defined across a strike extent of 1.4 kms. Gold mineralization
is open along strike and down dip.
Nyam is one of the four deposits which comprise the pit constrained Inferred Mineral Resource
Estimate at Enchi (4.9 million tonnes grading 0.82 g/t Au containing 129,000 ounces). Nyam is
located 15 kilometres east of the town of Enchi, with nearby roads and power and further
access provided by a series of drill roads. An airborne geophysical anomaly coincident with
the Nyam Gold Deposit shows a complex series of linear high conductivity trends, reflective of
the multiple sub-parallel gold-bearing structures. To date, approximately 30% of the gold -in-
soil anomaly is untested by drilling.
Kwakyekrom – Newest Resource Area at Enchi
Drilling completed as part of the 2020 – 2022 drill program led to an initial resource bein g
defined at Kwakyekrom as part of the Mineral Resource Estimate announced in June 2021.
Drilling at Kwakyekrom also included the best interval drilled to date at the zone, hole
KKRC041 encountered 0.79 g/t Au over 53.0 m from surface.
As part of the drill program, a total of 70 holes representing 11,434 metres were drilled at
Kwakyekrom. Drilling has expanded the drill tested strike extent by 120% to 1.1 kms, with the
current pit constrained mineral resource defined across a strike extent of 500 m. Gold
mineralization is open along strike and down dip.
Kwakyekrom is one of the four deposits which comprise the pit constrained Inferred Mineral
Resource Estimate at Enchi (2.7 million tonnes grading 0.64 g/t Au containing 55,600 ounces),
with an initial resource defined at Kwakyekrom as part of the updated M ineral Resource
Estimate announced in June 2021. Kwakyekrom is located 15 kilometres southeast of the town
of Enchi, with nearby roads and power and further access provided by a series of drill roads.
The Kwakyekrom structure is interpreted to be an extens ion of the Nyam structure and is
located south of Nyam. To date, approximately 40% of the gold-in-soil anomaly is untested by
drilling.
- 6 -
Sewum South, Tokosea, Sewum Ext. Parallel Zone – Three New Greenfield Discoveries
Three new discoveries were made at Enchi as a result of first pass drill testing on earlier-stage
targets. Inaugural RC drilling on two of the largest anomalies identified on the property, Sewum
South and Tokosea, intersected shallow oxide gold mineralization demonstrating the potential
to delineate additional resource areas across the 216 km2 property.
• Sewum South is the largest gold -in-soil anomaly on the Project with a dimension of six-
kilometres-by-two-kilometres and is located on the southern end of the property .
Mineralization is interpreted to be related to several sub-parallel and intersecting structural
trends defined by the geophysical signatures with similarities to the Sewum Deposit.
Drilling int ersected multiple gold mineralized zones, with h ole SWRC130 encountering
0.95 g/t Au over 15.0 m from 25 m, including 2.31 g/t A u over 5.0 m from 25 m and a
second zone of 1.50 g/t Au over 4.0 m from 14 m. As part of the 2020 - 2022 drill program,
29 holes totalling 3,120 metres were completed.
• Tokosea a large anomalous area located in the central portion of the Enchi Gold Project
and is one of the largest anomalous areas with gold -in-soil and associated geophysical
anomalies. Hole TORC045 intersected multiple zones of mineralization throughout the drill
hole. Near surface, the hole intersected 1.80 g/t Au over 27.0 m from 30 m, including
4.13 g/t Au over 3.0 m from 31 m, 3.41 g/t Au over 3.0 m from 38 m, and 3.76 g/t Au over
3.0 m from 47 m. Tokosea is outlined on surface by a six-kilometre-long and two-to-three-
kilometre-wide gold -in-soil anomaly , of which wide spaced and shallow drilling tested
targets within a four -kilometre-by-two-kilometre area. As part of the 2020 - 2022 drill
program, 82 holes totalling 10,238 metres were completed.
• Sewum Ext. Parallel Zone was an undrilled target at Sewum, a series of sub-parallel
structures defined by gold-in-soil and trench anomalies located approximately 200 metres
east of the main Sewum structure. These new sub-parallel structures have now been tested
for over 400 metres of strike length and are open to both the north and south. Hole
SWRC152 tested shallow oxide mineralization and intersected 5.84 g/t Au over 6.0 m from
2 m, including 26.82 g/t Au over 1.0 m from 2 m. As part of the 2020 - 2022 drill program,
10 holes totalling 1,086 metres were completed.
As part of the drill program , a total of 121 holes representing 14,444 metres were drilled on
these earlier stage targets . These targets represent new areas for longer -term potential
resource growth at Enchi. All of these areas are within close proximity of the infrastructure
outlined in the June 2021 Preliminary Economic Assessment.
Other Targets with No Defined Mineral Resource
• Eradi is a previously drilled target at Enchi , located on the northern end of the property,
where diamond drilling in 2021 tested approximately 1.2 kilometres of strike length, with
all holes intersecting gold mineralization . Hole ERDD020, completed on the northern
portion of the target, intersected multiple gold mineralized zones within the oxides
including a wide zone with high-grade core structures which encountered 0.89 g/t Au over
47.8 m from 41.2 m, including 6.44 g/t Au over 2.5 m from 41.2 m and 2.14 g/t Au over
5.8 m from 54.2 m. Eradi has now been tested at wide spacings over a strike length of
1.6 kilometres and remains open along strike and to depth. As part of the 2020 - 2022 drill
program, 14 holes totalling 2,189.5 metres were completed.
- 7 -
• Kojina Hill is an advanced target on the property that is outlined on surface by a two -
kilometre-long by one-kilometre-wide gold-in-soil anomaly. It is related to a structure sub-
parallel to the Nyam Shear Zone and located 1.5 kilometres west of the Nyam Deposit. As
part of the 2020 - 2022 drill program, 14 holes totalling 2,588 metres were completed. The
Company is currently testing the strike extent of the Kojina Hill anomaly through
completion of a manual trenching program.
Final Drill Results From the 90,000 Metre Drill Program
Remaining results from the 2020 - 2022 drill program included RC drilling targeting oxide
mineralization within the southern extension of the Boin Gold Deposit, as well as diamond
drilling completed at all resource areas. This release reports final results from the drill program:
3 DD holes totalling 1,061.7 m (SWDD081 to SWDD083) at Sewum, 10 DD holes totalling
2,631.4 m (KBDD067 to KBDD076) targeting Boin, 7 RC holes totalling 932 m (KBRC281 to
KBRC287) targeting the southern extension at Boin, 3 DD holes totalling 946.9 m (NBDD057
to NBDD059) at Nyam , and 2 DD holes totalling 640.3 m (KKDD002, KK DD003) at
Kwakyekrom. All holes intersected gold mineralization.
Diamond drilling at Boin included hole KBDD075, drilled in the central portion of the structure,
intersected several gold mineralized zones including 1.16 g/t Au over 20.0 m from 221 m with
higher-grade core structures of 4.92 g/t Au over 1.8 m from 221 m, 1.99 g/t Au over 3.8 m from
227.2 m, and 2.03 g/t Au over 2.5 m from 236 m. Hole KBDD067, collared 50 metres west of
KBDD075 on the same section, intersected 1.07 g/t Au over 15.0 m from 250 m, including
2.28 g/t Au over 5.0 m from 251 m, as well as 5.14 g/t Au over 2.8 m from 185.2 m, 1.75 g/t Au
over 5.7 m from 33.3 m, and 1.35 g/t Au over 3.0 m from 90 m. Hole KBDD076, collared 100
metres south of KBDD075, intersected 3.42 g/t Au over 2.8 m from 257 m, and 1.00 g/t Au over
2.2 m from 199 m. Hole KBDD068, collared 800 metres north of KBDD075, intersected multiple
gold mineralized structures including 1.11 g/t Au over 1.3 m from 241.5 m and 2.01 g/t Au
over 1.0 m from 278 m.
Shallow drilling on the southern extension at Boin consisted of seven RC holes all of which
intersected gold mineral ization within the near -surface oxidized zone and upper portions of
the sulphides. Hole KBRC284 intersected multiple mineralized zones with 1.07 g/t Au over
5.0 m from 18 m and 0.57 g/t Au over 8.0 m from 50 m. Hole KBRC281 intersected multiple
structures including 1.43 g/t Au over 3.0 m from 108 m and 0.60 g/t Au over 7.0 m from 3 m.
Drilling at Nyam included three additional deeper diamond drill holes, each of which
intersected multiple gold mineralized zones. Hole NBDD057 intersected 1.07 g/t Au over
12.0 m from 181 m including 1.96 g/t Au over 3.0 m from 184 m. Hole NBDD058, drilled
50 metres south of NBDD057, intersected 0.90 g/t Au over 12.2 m from 221.2 m including
2.64 g/t Au over 1.4 m from 222.8 m and 2.10 g/t Au over 1.8 m from 231.6 m. Hole NBDD059,
drilled 75 metres north of NBDD057, intersected 0.59 g/t Au over 13.0 m from 277 m, including
1.13 g/t Au over 2.2 m from 286.8 m.
Enchi Gold Project Mineral Resource Estimate
The Enchi Gold Project hosts a pit constrained Inferred Mineral Resource of 70.4 million tonnes
grading 0.62 g/t Au containing 1. 41 million ounces gold (see Newcore news release date d
June 8, 2021). Mineral resource estimation practices are in accordance with CIM Estimation of
Mineral Resource and Mineral Reserve Best Practice Guidelines (November 29, 2019) and
follow CIM Definition Standards for Mineral Resources and Mineral Reserves (May 10, 2014),
- 8 -
that are incorporated by reference into National Instrument 43-101 ("NI 43-101"). The Mineral
Resource Estimate was prepared by independent qualified person Todd McCracken, P. Geo.
of BBA E&C Inc. The technical report, titled "Preliminary Economic Assessment for the Enchi
Gold Project, Enchi, Ghana" has an effective date of June 8, 2021 , and is available under the
Company’s profile on SEDAR at www.sedar.com.
2020 - 2022 Enchi Drilling Program
A 90,000 metre discovery and resource expansion drill program (commenced in August 2020)
was completed at Enchi in Q2 2022. The program included both RC and diamond drilling and
included the first deeper drilling on the Project. Newcore’s multi -pronged exploration
approach delivered on the goals set out at the start of drilling: (i) successfully outlined potential
resource growth along strike at all four existing deposits (Sewum, Boin, Nyam, Kwakyekrom);
(ii) encountered strong results at previously drilled zones that are outside of the resource area
(Kojina Hill and Eradi) ; (iii) drilling intersected high-grade at depth which has outlined the
potential for underground resources; and (iv) identified new discoveries from successful first
pass drilling on early stage kilometre-scale gold -in-soil anomalous targets (Sewum South ,
Tokosea). The total planned drill program consisted of 575 holes representing 92,583 metres.
Drill Hole Locations (Previously Unreleased Drill Results Only)
Table 2 - Enchi Gold Project Drill Hole Location Details
Hole ID UTM East UTM North Elevation Azimuth ° Dip ° Length (m)
KBRC281 517320 631388 118 114 -50 150
KBRC282 517438 631445 109 114 -50 102
KBRC283 517404 631458 115 114 -50 150
KBRC284 517449 631542 112 114 -50 156
KBRC285 517457 631714 131 114 -50 170
KBRC286 517603 631796 145 114 -50 102
KBRC287 517700 631963 121 114 -50 102
KBDD067 519130 634081 142 120 -52 300.4
KBDD068 519473 634792 121 120 -52 339.5
KBDD069 520258 635635 116 120 -55 318.5
KBDD070 519303 634424 138 114 -60 235.4
KBDD071 520261 635352 119 114 -55 199.4
KBDD072 520201 635384 118 114 -58 310.4
KBDD073A 520330 635316 110 0 -90 274.0
KBDD074 518910 633615 168 114 -60 121.5
KBDD075 519168 634041 123 114 -60 257.1
KBDD076 519109 633975 144 114 -60 275.2
NBDD057 530644 637797 92 300 -60 312.5
NBDD058 530629 637755 96 300 -60 299.2
NBDD059 530730 637844 102 300 -62 335.2
SWDD081 521232 629138 189 120 -60 395.3
SWDD082 521256 628074 134 120 -53 364.7
SWDD083 521259 629336 144 120 -60 301.7
KKDD002 528642 634568 103 298 -63 315.6
KKDD003 528707 634630 106 298 -65 324.7