Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NCAU.V ·

Newcore Gold Announces Filing of Technical Report for The Enchi Gold Project

Resource Estimates Technical Reports (NI 43-101)

NEWS RELEASE

Suite 413 - 595 Burrard Street, P.O. 49167 www.newcoregold.com

Vancouver, British Columbia V7X 1J1 [email protected]

Newcore Gold Announces Filing of Technical Report

for The Enchi Gold Project

October 9, 2020 TSX-V: NCAU

Vancouver, BC – Newcore Gold Ltd. ("Newcore" or the "Company") (TSX-V: NCAU) has

filed an independent National Instrument 43-101 ("NI 43-101") technical report for the updated

2020 mineral resource estimate relating to the Company’s 100% owned Enchi Gold Project in

southwestern Ghana, the results of which were announced on September 14, 2020 . The

technical report, titled "Enchi Gold Project, Resource Update, Enchi, Ghana " has an effective

date of September 11, 2020 and is available under Newcore’s profile on www.sedar.com.

Qualified Person

Mr. Gregory Smith, P.Geo, Vice President of Exploration of Newcore, is a Qualified Person as

defined by NI 43 -101, and has reviewed and approved the technical data and information

contained in this news release.

About Newcore Gold Corp.

Newcore Gold is advancing its Enchi Gold Project located in Ghana, Africa’s largest gold

producer 1. The Project currently hosts an Inferred Mineral Resource of 1.2 million ounces of

gold at 0.72 g/t 2. Newcore Gold offers investors a unique combination of top-tier leadership,

who are aligned with shareholders through their 39% ownership, and prime district scale

exploration opportunities. Enchi’s 216 km2 land package covers 40 kilometres of Ghana’s

prolific Bibiani Shear Zone, a gold belt which hosts several 5 million -ounce gold deposits,

including Kinross’ Chirano mine 50 kilometers to t he north. Newcore’s vision is to build a

responsive, creative and powerful gold enterprise that maximizes returns for shareholders.

On Behalf of the Board of Directors of Newcore Gold Ltd.

Luke Alexander

President, CEO & Director

For further information, please contact:

Mal Karwowska | Vice President, Corporate Development and Investor Relations

+1 604 484 4399

[email protected]

www.newcoregold.com

1 Source: Production volumes for 2019 as sourced from the World Gold Council

2 Notes for Inferred Mineral Resource Estimate:

1. CIM definition standards were followed for the resource estimate.

- 2 -

2. The 2020 resource models used ordinary kriging (OK) grade estimation within a three-dimensional block model

with mineralized zones defined by wireframed solids and constrained by whittle pits shell.

3. A base cut-off grade of 0.3 g/t Au was used with a capping of gold grades at 18 g/t.

4. A US$1,500/ounce gold price, open pit with heap leach operation was used to determine the cut-off grade of

0.3 g/t Au. Mining costs of US$2.27/mined tonne and G&A and Milling costs of US$9.84/milled tonne. The

Inferred Mineral Resource Estimate is pit constrained.

5. A density of 2.45 g/cm3 was applied. Numbers may not add due to rounding.

6. Mineral Resources that are not mineral reserves do not have economic viability.

7. These numbers are from the independent technical report titled "Enchi Gold Project, Resource Update, Enchi,

Ghana", with an effective date of September 11, 2020, prepared by Todd McCracken, P. Geo. in accordance

with National Instrument 43 -101 Standards of Disclosure for Mineral Project and is available un der Newcore’s

SEDAR profile at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined

in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy

of this release.

Cautionary Note Regarding Forward-Looking Statements

This news release contains certain forward -looking statements, Any statements that express or involve

discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions

or future events or performance (often, but not always, using words or phrases such as "expects" or does

not expect", "is expected", anticipates" or "does not anticipate" "plans", "estimates" or "intends" or stating

that certain actions, events or results " may", "could", "would", "might" or "will" be taken, occur or be

achieved) are not statements of historical fact and may be "forward-looking statements". Forward-looking

statements are subject to a variety of risks and uncertainties which could cause actual events or results to

materially differ from those reflected in the forward-looking statements.

Safe Harbor Statement under the United States Private Securities Litigation Reform Act of 1995: Except

for the statements of historical fact contained herein, the information presented constitutes "forward -

looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. Such

forward-looking statements including but not limited to those with respect to the price of gold, potential

mineralization, reserve and resource determination, exploration results, and future plans and objectives

of the Company involve known and unknown risks, uncertainties and other factors wh ich may cause the

actual results, performance or achievement of the Company to be materially different from any future

results, performance or achievements expressed or implied by such forward -looking statements. There

can be no assurance that such stateme nts will prove to be accurate as actual results and future events

could differ materially from those anticipated in such statements. Accordingly, readers should not place

undue reliance on forward-looking statements.