Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NAR.V ·

North Arrow Updates Naujaat, Pikoo and Loki Diamond Projects

Corporate Updates

Suite 960 – 789 West Pender Street, Vancouver, BC, Canada V6C 1H2

Tel: 604-668-8355

News Release

NORTH ARROW UPDATES NAUJAAT, PIKOO AND LOKI DIAMOND PROJECTS

February 22, 2022 Trading Symbol: TSXV: NAR #22 -02

North Arrow Minerals Inc. (TSXV -NAR) (“North Arrow”) is pleased to provide a processing update for its Naujaat

Diamond Project bulk sample, and to report kimberlite indicator mineral (KIM) results from samples collected in 2021 from

its 100% owned Pikoo and Loki Diamond Projects.

N

aujaat Diamond Project, Nunavut:

P

rocessing and diamond recoveries from the 2021 bulk sample are ongoing, with Dense Media Separation (DMS) processing

of the nominal 2,000 tonne sample approximately 47% complete. As noted in news release dated December 16, 2021, final

diamond recoveries are being completed at the Saskatchewan Research Council (SRC) Diamond laboratory using X- Ray

Transmission (XRT) optical sorting technology to recover diamonds larger than 2 mm in size. SRC is the first commercial

diamond laboratory to integrate XRT recovery technology into their processing circuit, an important development as optical

sorting has rapidly become the primary diamond recovery process at operating diamond mines.

T

he $5.6M bulk sample program is being funded by Burgundy Diamond Mines (ASX-BDM), as part of a June 1, 2020 option

agreement under which Burgundy may earn a 40% interest in the Naujaat Project by funding the current bulk sample program.

Further details on the collection of the bulk sample can be found in North Arrow’s news release dated August 19, 2021.

P

ikoo Diamond Project, Saskatchewan:

D

uring October 2021, North Arrow collected 25 targeted till samples from the Pikoo Project, Saskatchewan (see news release

September 28, 2021 for details). Anomalous KIM results from these samples, including kimberlitic pyrope garnet, ilmenite

and chromite, have confirmed unsourced KIM trains in the North Pikoo and South Lovell target areas. At North Pikoo, very

high KIM counts, in excess of hundreds of grains, were returned from three samples near the head of an existing KIM train

and, perhaps more importantly, a series of barren samples collected up ice from the target area indicate the train is very well

defined. Anomalous sample results from the South Lovell target area , ranging from 6 to 22 KIMs including pyrope garnet,

eclogitic garnet, ilmenite and chromite, have confirmed an unsourced KIM train in this region of the property. The North

Pikoo and South Lovell KIM trains confirm that undiscovered kimberlites are located with in the property and planning is

underway for a follow up drilling program during the 2022 field season.

L

oki Diamond Project, NWT:

K

IM results have also been received from the Loki P roject, located in the Lac de Gras region of the Northwest T erritories,

where a series of overburden samples were collected as part of an exploration reverse circulation (RC) drilling program

completed in June 2021. Samples of t hick overburden and ice units encountered during drilling have been processed and

results from samples collected at the upper, near surface, levels of the drill holes have returned from 0 to 7 KIMs, a result that

is in line with traditional till sampling in the area. Importantly, however, several samples collected at depths of approximately

5 to 25 m, have returned very high KIM counts, including three samples returning in excess of 100 KIMs, including pyrope

and eclogitic garnet, ilmenite, chrome-diopside, chromite and olivine. These KIM counts are an order of magnitude higher

than the most anomalous results returned by surface till sampling on the property. Further interpretation of these areas of thick

glacial overburden is underway, including an evaluation of the origin of KIM-bearing ice lenses encountered during drilling.

Overburden samples collected from similar RC drilling in other parts of the Lac de Gras region have produced similar KIM

results within close proximity to known kimberlite sources. This work is expected to be completed by the end of March 2022

with follow-up field work during the 2022 field season.

North Arrow’s exploration programs are conducted under the direction of Kenneth Armstrong, P.Geo., President and CEO of

North Arrow and a Qualified Person under NI 43- 101. Mr. Armstrong has reviewed and approved the technical contents of

this press release.

About North Arrow Minerals

North Arrow is a Canadian based exploration company focused on the identification and evaluation of diamond exploration

opportunities in Canada. North Arrow’s management, board of directors and advisors have significant successful experience

in the global diamond industry. North Arrow’s most advanced diamond project is the Q1- 4 diamond deposit at the Naujaat

Project (NU), where a $5.6M 2,000 tonne bulk sample is currently undergoing final processing and diamond recovery. North

Arrow has also discovered and is evaluating diamond bearing kimberlites at the Pikoo (SK), Mel (NU) , Loki (NWT) and

LDG JV Projects (NWT). North Arrow also maintains a 100% interest in the Hope Bay Oro Gold Project (NU), located

approximately 3 km north of Agnico Eagle’s Doris Gold Mine.

North Arrow Minerals Inc.

/s/ “Kenneth A. Armstrong”

Kenneth Armstrong

President and CEO

For further information, please contact:

Ken Armstrong

Tel: 604-668-8355 or 604-668-8354

Website: www.northarrowminerals.com

Neither the TSX Venture Exchange nor its Regulation Services Provider accepts responsibility

for the adequacy or accuracy of this release.

This news release contains "forward- looking statements" including but not limited to statements with respect to North Arrow’s plans, the estimation of a

mineral resource and the success of exploration activities. Forward- looking statements, while based on management's best estimates and assumptions, are

subject to risks and uncertainties that may cause actual results to be materially different from those expressed or implied by such forward-looking statements,

including but not limited to: risks related to the successful integration of acquisit ions; risks related to general economic and market conditions; closing of

financing; the timing and content of upcoming work programs; actual results of proposed exploration activities; possible variations in mineral resources or

grade; failure of plant, e quipment or processes to operate as anticipated; accidents, labour disputes, title disputes, claims and limitations on insurance

coverage and other risks of the mining industry; changes in national and local government regulation of mining operations, tax rules and regulations.

Although North Arrow has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking

statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will

prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not

place undue reliance on forward-looking statements. North Arrow undertakes no obligation or responsibility to update forward- looking statements, except

as required by law.