Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NAR.V ·

North Arrow Confirms Four Spodumene Pegmatites at Ldg Project, NT Drilling Planned to Start IN August

Exploration Programs

Suite 960 – 789 West Pender Street, Vancouver, BC, Canada V6C 1H2

Tel: 604-668-8355

News Release

NORTH ARROW CONFIRMS FOUR SPODUMENE PEGMATITES AT LDG PROJECT, NT

DRILLING PLANNED TO START IN AUGUST

August 10, 2023 Trading Symbol: TSXV: NAR #23-14

North Arrow Minerals Inc. (TSXV-NAR) (“North Arrow”) is pleased to report it has confirmed at least four spodumene

pegmatites at the company’s 100% owned LDG Property, Northwest Territories.

Highlights of this recently completed program, initially announced in North Arrow news release dated July 13, 2023, include:

• Four spodumene-bearing pegmatites have been identified within 5 k m of the winter road connect ing the Diavik

diamond mine, 20 km to the north, with the city of Yellowknife, and within 1 km of an alternative winter road

alignment used in the past.

• The pegmatites remain open along strike and have been traced over estimated extents of 300m to >500m, based on

interpreted continuity of low-relief outcrop exposures. Individual outcrops range from metre-scale to near continuous

exposures over 200m in strike length.

• The pegmatites are interpreted to dip steeply at ~ 75-80 degrees with estimated widths ranging from 5m to 50m.

Widths are poorly constrained by abundant overburden and rarely observed contacts with metasedimentary host

rocks.

• Pegmatite mineralogy consists of plagioclase,

potassium feldspar, qu artz, spodumene,

muscovite and tourmaline. Spodumene is

abundant in the pegmatites, locally reaching

15-20% of observed outcrops, in some cases

with very coarse crystals up to 50 cm in size.

• 51 channel and regional prospecting samples

have been submitted to ALS Global in

Yellowknife with results to be reported when

received.

• Abundant overburden in the area provides

significant scope for expanding these

showings considerably.

Ken Armstrong, President and CEO o f North Arrow

commented “ In a very short period of time, North

Arrow has confirmed a new spodumene pegmatite field

within our 100% owned LDG Project in the Northwest

Territories. Based on t he size potential of these

pegmatites, their location immediately adjacent to

transportation infrastructure provided by the Lac de

Gras winter road, and the fact that an exploration camp

and drilling permit are already in place, we h ave

refocused our 2023 drilling plans to test these

discoveries starting in late August . The program is

intended to rapidly evaluate the pegmatites through

Spodumene (lithium silicate) megacrysts found the at SD4 Pegmatite,

LDG Project.

approximately 2,000m of delineation drilling and sampling, which will provide clarity of their full size and mineralization

potential.”

Drilling of North Arrow’s 100% owned DeStaffany Lithium Project, updated in a North Arrow news release dated July 11,

2023, will occur in 2024.

About North Arrow Minerals

North Arrow is a Canadian based exploration company focused on the identification and evaluation of lithium and other

exploration opportunities in Canada. North Arrow’s management, board of directors and advisors have significant successful

experience in the global exploration and

mining industry. North Arrow is evaluat ing

spodumene pegmatites at its 100% own ed

DeStaffany, LDG and MacKay Lithium

Projects (NWT) and is also exploring for

lithium in Nunavut at the Bathurst Inlet

pegmatite field and continues work to identify

additional lithium exploration opportunities in

northern Canada . North Arrow also owns

interests in the Naujaat (NU), Pikoo (SK), Mel

(NU), and Loki (NWT) Diamond Projects and

maintains a 100% interest in the Hope Bay

Oro Gold Project, located approximately 3 km

north of Agnico Eagle ’s Doris Gold Mine ,

Nunavut. North Arrow’s exploration

programs are conducted under the direction of

Kenneth Armstrong, P.Geo. (NT/NU, ON ),

President and CEO of North Arrow and a

Qualified Person under NI 43 -101. Mr.

Armstrong has reviewed and approved the

technical contents of this press release.

Channel sampling of the SD1 Pegmatite, LDG Project, NWT.

Spodumene megacryst at SD2 Pegmatite, LDG Project, NWT.

North Arrow Minerals Inc.

/s/ “Kenneth A. Armstrong”

Kenneth Armstrong

President and CEO

For further information, please contact:

Ken Armstrong or Nick Thomas

Tel: 604-668-8354 or 778-229-7194

Website: www.northarrowminerals.com

Neither the TSX Venture Exchange nor its Regulation Services Provider accepts responsibility

for the adequacy or accuracy of this release.

This news release contains "forward -looking statements" including but not limited to statements with respect to North Arrow’s plans, the es timation of a

mineral resource and the success of exploration activities. Forward -looking statements, while based on management's best estimates and assumptions, are

subject to risks and uncertainties that may cause actual results to be materially different from those expressed or implied by such forward-looking statements,

including but not limited to: risks related to the successful integration of acquisitions; risks related to general economic and market conditions; closing of

financing; the timing and content of upcoming work programs; actual results of proposed exploration activities; possible variations in mineral resources or

grade; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes, title disputes, claims and limitations on insurance

coverage and other risks of the mining industry; changes in national and local government regulation of mining operations, ta x rules and regulations.

Although North Arrow has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking

statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no as surance that such statements will

prove to be accur ate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, read ers should not

place undue reliance on forward -looking statements. North Arrow undertakes no obligation or responsibility to update forward-looking statements, except

as required by law.