Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NAR.V ·

North Arrow Announces Drilling Program is Underway at the Q1-4 Kimberlite, Naujaat Diamond Project, Nu

Exploration Programs

Suite 960 – 789 West Pender Street, Vancouver, BC, Canada V6C 1H2

Tel: 604 668 8355 / Fax: 604 604 336 4813

News Release

NORTH ARROW ANNOUNCES DRILLING PROGRAM IS UNDERWAY AT THE Q1-4

KIMBERLITE, NAUJAAT DIAMOND PROJECT, NU

June 28, 2017 Trading Symbol: TSXV: NAR #17-09

North Arrow Minerals Inc. (TSXV-NAR) is pleased to announce the start of a $3.2M exploration program at the Company’s

100% owned Naujaat (now-yat; formerly Qilalugaq) and Mel Diamond Projects, Nunavut.

Highlights of the exploration work to be completed this summer include:

At the Naujaat Project

 4,500m of drilling intended to better delineate the Q1 -4 kimberlite, in particular between 200m and 300m below

surface;

 Collection of a 200 tonne mini-bulk sample from the highest grade phase of the Q1 -4 kimberlite and intended to

better characterize the macrodiamond population, including a population of rare, fancy orangey yellow diamonds.

At the Mel Project

 Detailed prospecting and geophysical surveys of high priority kimberlite indicator mineral (KIM) targets, which

could result in the discovery of a new kimberlite field.

Naujaat Diamond Project – A 4,500m drilling program has commenced at the Q1-4 kimberlite, located just 9 km from the

Hamlet of Naujaat (Repulse Bay). Drilling is intended to better delineate the kimberlite, in particular between 200m and 300m

below surface, and will also help confirm and update the internal geological model for Q1-4 and improve the deposit’s spatial

diamond dataset.

Ken Armstrong, President and CEO of North Arrow, stated, “We are pleased that drilling is underway at the Naujaat Project

for the first time in over 12 years. Q1-4 is a large kimberlite, having a surface area in excess of 12 ha and excellent potential

to extend at depth beyond the reach of past drilling efforts. The current program will provide important information to confirm

and update the size of the Q1 -4 kimberlite as well as improve our understanding o f its internal geology and diamond

distribution within the deposit. The 2017 summer drilling is part of a staged exploration program designed to define a NI 43 -

101 inferred resource down to a depth of at least 300m below surface.”

A 200 tonne mini-bulk sampl ing program is also scheduled for July . The program will utilize a mini-excavator to collect

approximately 250 mega-bags of kimberlite from the A61 phase of Q1-4, in an area where this coherent hypabyssal kimberlite

subcrops beneath approximately 0.5m of glacial till. Based on the May 2013 NI 43-101 inferred resource for Q1-4, A61 has

the highest model grade of the five phases or units that comprise the kimberlite and the 2017 mini-bulk sample is intended to

provide an indication of the characteristics of the macrodiamond population in this area of the deposit. The sample will be

shipped south in late August on Naujaat’s annual sea-lift and will be processed during the fall of 2017.

Mr. Armstrong continued , “As we have noted from North Arrow’s ongoing evaluation of Q1-4, this kimberlite hosts an

important population of fancy orangey yellow diamonds, which have been recovered from every phase of the kimberlite and

have the potential to positively impact the overall diamond value of the deposit. The 2017 mini-bulk sample will advance this

evaluation by providing an indication of the characteristics of these rare, coloured diamonds in the highest grade phase of the

deposit and will help with planning a larger bulk sampling program in 2018.”

Mel Diamond Project – As part of its overall 2017 exploration program, North Arrow field crews will also be conducting a

program of detailed prospecting and geophysical surveys at the Mel Project, located on the Melville Peninsula, approximately

210 km northeast of Naujaat and 140 km south of the Hamlet of Hall Beach . Prospecting will focus on areas up-ice from at

least two, and possibl y three, KIM trains sharply defined from previous sampling. Anomalous samples in this area include

the full suite of KIMs including magnesian ilmenite, and mantle-derived sub-calcic pyrope and eclogitic garnets, with counts

ranging from hundreds to in excess of 1,200 KIMs per 20 kg of till suggesting very close proximity to a kimberlite bedrock

source.

All of the kimberlite fields discovered to date in the eastern Canadian arctic, including at North Arrow’s Naujaat Project,

include at least some kimberlite bodies that occur in outcrop or subcrop and prospecting is considered a cost effective

exploration tool that could lead to the discovery of a new kimberlite field at Mel.

About North Arrow Minerals

North Arrow is a Canadian based exploration company focused on the identification and evaluation of diamond exploration

opportunities in Canada. North Arrow’s management, board of directors and advisors have significant successful experience

in the Canadian diamond industry. North Arrow is currently evaluating a number of projects including the Naujaat (formerly

Qilalugaq) (NU), Mel (NU), Pikoo (SK), LDG (NT), and Loki (NT) Diamond Projects. North Arrow also maintains a 100%

interest in the Hope Bay Oro Gold Project (NU), located approxi mately 3 km north of TMAC Resources’ new Doris Gold

Mine. North Arrow’s exploration programs are conducted under the direction of Kenneth Armstrong, P.Geo. (ON), President

and CEO of North Arrow and a Qualified Person under NI 43 -101. Mr. Armstrong has re viewed the contents of this press

release.

North Arrow Minerals Inc.

/s/ “Kenneth A. Armstrong”

Kenneth Armstrong

President and CEO

For further information, please contact:

Ken Armstrong

Tel: 604-668-8355 or 604-668-8354

Website: www.northarrowminerals.com

Neither the TSX Venture Exchange nor its Regulation Services Provider accepts responsibility

for the adequacy or accuracy of this release.

This news release contains "forward -looking statements" including but not limited to statements with respect to North Arrow’s plans, the estimation of a

mineral resource and the success of exploration activities. Forward-looking statements, while based on management's best estimates and assumptions, are

subject to risks and uncertainties that may cause actual results to be materially different from those expressed or implied by such forward-looking statements,

including but not limited to: risks related to the successful integration of acquisit ions; risks related to general economic and market conditions; closing of

financing; the timing and content of upcoming work programs; actual results of proposed exploration activities; possible variations in mineral resources or

grade; failure of plant, e quipment or processes to operate as anticipated; accidents, labour disputes, title disputes, claims and limitations on insura nce

coverage and other risks of the mining industry; changes in national and local government regulation of mining operations, ta x rules and regulations.

Although North Arrow has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking

statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will

prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not

place undue reliance on forward-looking statements. North Arrow undertakes no obligation or responsibility to update forward-looking statements, except

as required by law.