Pacific North West Capital Announces 2.5 million ounces PGM+Gold Measured and Indicated Resources for its 100% Owned River Valley Project, Sudbury, Ontario

Resource Estimates Technical Reports (NI 43-101)

Pacific North West Capital Corp. 

For Immediate Release       NEWS RELEASE TSX: PFN OTCQX: PAWEF Frankfurt: P7J  Toll Free 1.800.667.1870  www.pfncapital.com

Pacific North West Capital Announces 2.5 million ounces PGM+Gold Measured and  Indicated Resources for its 100% Owned River Valley Project, Sudbury, Ontario 

  • River Valley Measured + Indicated resources: 91 million tonnes @ 0.58 g/t* palladium, 0.22 g/t platinum, 0.04 g/t gold at a cut‐off grade of 0.8 g/t PdEq** for 2,463,000 ounces PGM*** plus gold
  • River Valley Inferred resources: 36 million tonnes @ 0.36 g/t palladium, 0.14 g/t platinum, 0.03 g/t gold at a cut‐off grade of 0.8 g/t PdEq for 614,000 ounces PGM plus gold
  • On a PdEq basis,  the Measured + Indicated resources contain 3,944,000 ounces PdEq and the Inferred resources contain 1,201,000 ounces PdEq
  • River Valley PGM‐copper‐nickel sulphide mineralized zones remain open to expansion with continued exploration
  • g/t= grams per tonne, **PdEq = palladium equivalent, *** PGM=Platinum Group Metals  

May 1st, 2012, Vancouver, BC – Pacific North West Capital Corp. (TSX: PFN; OTCQX: PAWEF; Frankfurt: P7J) is very pleased to announce that the estimated NI43‐101 compliant Measured and Indicated mineral resources at a cut‐off grade of 0.80 g/t PdEq have increased by >400% from the previous NI43‐101 compliant mineral resource estimate (May  2006)  to  91,339,500  tonnes  grading  0.84  g/t  Pd+Pt+Au,  0.06%  copper,  and  0.02%  nickel.  The  compliant Inferred mineral resources have increased by >1000% to 35,911,000 Mt grading 0.53 g/t Pd+Pt+Au, 0.06% copper, and  0.03%  nickel.  The  River  Valley  PGM  Project  is  located  100  km  from  the  world‐renown  Sudbury  Ni‐Cu‐PGM Mining Camp, has excellent infrastructure support, and is 100% owned by PFN.

Detailed Results 

The detailed results of the new mineral resources estimate for the River Valley PGM Project are presented in Table

1. This NI43‐101 compliant mineral resource estimate was completed by Tetra Tech, Sudbury.  The new estimate incorporates the 13,140 metres in 46 holes drilled in the Dana North and Dana South Zones since the May 2006 estimate.    All  462  holes  were  drilled  at  a  sectional  spacing  of  25  metres  to  100  metres  on  the  eight  separate mineralized zones shown in Figure 1.

Dr. William Stone, President & COO, comments, “The large increase in the estimated mineral resources confirms that  River Valley is one of the largest undeveloped primary PGM Projects in North America.  The strategy of including all  the  mineralized  zones  and  the  full  value  of  the  metal  suite  in  the  mineral  resource  estimation  produced  a  very  positive result.  It greatly increases PFN’s confidence in River Valley as the project is advanced toward a Preliminary  Economic Assessment Study. The Company plans to further expand the PGM resources and to discover new resources  with more drilling at the River Valley Project and its adjacent properties.”

The mineral resources were estimated using Datamine Studio3© software and are reported at a cut‐off grade of 0.8 g/t PdEq (Table 1). The 0.8 g/t PdEq cut‐off was used pending future assessment of the economics and development potential  of  River  Valley  as  an  open  pit  mining  project.  The  Company  considers  the  0.8  g/t  cut‐off  value  to  be appropriate because:  1) the PdEq grade is 1.38 g/t for Measured and Indicated and 1.07 g/t for Inferred resources; and  2) rhodium and silver are not included in the PdEq calculation.  The mineral resources are listed at a range of PdEq cut‐off values in Table 2.

News Release, May 1st, 2012                                                                                                                                                                                           1 Comparisons are made above to the previous NI43‐101 compliant River Valley mineral resource estimate of May 2006  (Technical  Report  by  GeoSIMS  available  on  PFN’s  SEDAR  profile  at  www.sedar.com  and  on  the  Company’s website).  The  large  increase  in  the  mineral  resources  reported  herein  is  explained  by  the  combined  effects  of:

1) incorporation of the 2011 resource drilling results; 2) inclusion of three mineralized zones that were previously overlooked (Figure 1); 3) use of PdEq rather than Pd+Pt cut‐off grades; and 4) use of a length‐weighted average Specific Gravity value of 2.94 measured for River Valley rather than the previous value of 2.89.

Figure  1.  Location  of  the  eight  mineralized  zones  in  the  Breccia  Unit  at  the  base  of  the  River  Valley  Intrusion, Sudbury  area,  Ontario.  The  Banshee,  Azen  and  Razor  PGM‐Cu‐Ni  mineralized  zones  were  not  included  in  the previous NI43‐101 compliant mineral resource estimation (May 2006).

News Release, May 1st, 2012                                                                                                                                                                                           2 Harry  Barr,  Chairman  &  CEO,  states,  “In  only  one  year  since  regaining  100%  ownership  of  the  River  Valley  PGM  Project, I want to congratulate our team for completion of a major milestone by delivering a very positive resource  statement. Our aggressive exploration and development strategy aims to unlock the true potential of River Valley.   Going forward, our plans are to continue exploration to expand the resource, drill test new targets, and complete a  preliminary economic assessment in the next 2 years.”

Table 1. NI43‐101 Compliant Mineral Resources for the River Valley PGM Project, Sudbury, Ontario

MeasuredContained Metal
Zone PdEq Cut‐off TONNES Pd Pt Rh Au Ag Cu Ni Co PdEqPGM+Au PdEq
(g/t) (g/t) (g/t) (g/t) (g/t) (g/t) (%) (%) (%) (g/t)(oz) (oz)
Azen0.80‐‐‐‐‐‐‐‐‐‐‐‐
Banshee0.80‐‐‐‐‐‐‐‐‐‐‐‐
Dana North0.809,622,1800.660.240.0230.050.700.070.020.0031.56295,747468,612
Dana South0.805,980,5500.790.260.0270.050.560.060.010.0031.68210,735313,237
Lismer0.809,982,1200.500.200.0180.040.400.050.020.0031.24235,646386,598
Lismer Extension0.80‐‐‐‐‐‐‐‐‐‐‐‐
Razor0.80‐‐‐‐‐‐‐‐‐‐‐‐
Varley0.80‐‐‐‐‐‐‐‐‐‐‐‐
Total Measured25,584,8500.630.230.0220.040.550.060.020.0031.46742,1271,168,447
IndicatedContained Metal
Zone PdEq Cut‐off TONNES Pd Pt Rh Au Ag Cu Ni Co PdEqPGM+Au PdEq
(g/t) (g/t) (g/t) (g/t) (g/t) (g/t) (%) (%) (%) (g/t)(oz) (oz)
Azen0.80‐‐‐‐‐‐‐‐‐‐‐‐
Banshee0.80‐‐‐‐‐‐‐‐‐‐‐‐
Dana North0.8014,076,3000.600.220.0210.040.520.070.020.0031.45392,562635,796
Dana South0.808,040,0000.700.240.0240.040.590.050.010.0031.49252,029373,248
Lismer0.8016,300,3000.480.190.0180.040.050.060.020.0031.25371,212638,230
Lismer Extension0.8013,690,3000.570.230.0210.040.120.060.020.0021.37365,153586,774
Razor0.80‐‐‐‐‐‐‐‐‐‐‐‐
Varley0.8013,647,8000.530.210.0190.030.170.050.010.0021.27339,978540,424
Total Indicated65,754,7000.560.210.0200.040.260.060.020.0021.351,720,9352,774,470
Measured+IndicatedContained Metal
Zone PdEq Cut‐off TONNES Pd Pt Rh Au Ag Cu Ni Co PdEqPGM+Au PdEq
(g/t) (g/t) (g/t) (g/t) (g/t) (g/t) (%) (%) (%) (g/t)(oz) (oz)
Azen0.80‐‐‐‐‐‐‐‐‐‐‐‐
Banshee0.80‐‐‐‐‐‐‐‐‐‐‐‐
Dana North0.8023,698,4800.630.230.0220.040.590.070.020.0031.49688,3091,104,408
Dana South0.8014,020,5500.740.250.0250.040.580.050.010.0031.57462,764686,484
Lismer0.8026,282,4200.490.190.0180.040.180.060.020.0031.25606,8581,024,827
Lismer Extension0.8013,690,3000.570.230.0210.040.120.060.020.0021.37365,153586,774
Razor0.80‐0.000.00‐0.000.000.000.00‐0.00‐‐
Varley0.8013,647,8000.530.210.0190.030.170.050.010.0021.27339,978540,424
Total Measured+Indicated91,339,5500.580.220.0210.040.340.060.020.0021.382,463,0623,942,917
InferredContained Metal
Zone PdEq Cut‐off TONNES Pd Pt Rh Au Ag Cu Ni Co PdEqPGM+Au PdEq
(g/t) (g/t) (g/t) (g/t) (g/t) (g/t) (%) (%) (%) (g/t)(oz) (oz)
Azen0.8016,095,0000.370.150.0140.030.080.050.030.0011.11285,081559,956
Banshee0.803,320,0000.350.190.0150.03‐0.050.01‐1.0061,659103,387
Dana North0.80‐‐‐‐‐‐‐‐‐‐‐‐
Dana South0.80‐‐‐‐‐‐‐‐‐‐‐‐
Lismer0.80303,0000.310.130.0120.03‐0.060.020.0020.924,5848,747
Lismer Extension0.80‐‐‐‐‐‐‐‐‐‐‐‐
Razor0.8016,163,0000.360.120.0130.020.160.060.030.0031.05262,468528,164
Varley0.8030,0000.300.150.0120.03‐0.070.010.0020.94459882
Total Inferred35,911,0000.360.140.0140.030.110.060.030.0021.07614,2521,201,137
Note: due to rounding, some totals may not appear to total properly
Mineral resources which are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, socio‐political, marketing, or other relevant issues.

News Release, May 1st, 2012                                                                                                                                                                                           3

Notes to Mineral Resources in Table 1 

1. The  mineral  resource  estimates  in  this  press  release  use  the  Canadian  Institute  of  Mining,  Metallurgy  and  Petroleum  (CIM), Standards  on  Mineral  Resources  and  Reserves,  Definitions  and  Guidelines  prepared  by  CIM  Standing  Committee  on  Reserve Definitions and adopted by CIM Council on November 27, 2010. The mineral resource estimates provided in this report are classified as  “measured”,  “indicated”,  or  “inferred”  as  defined  by  CIM.  According  to  the  CIM  definitions,  a  Mineral  Resource  must  be potentially economic in that it must be “in such form and quantity and of such grade or quality that it has reasonable prospects for economic extraction”.

2. For  the  River  Valley  project,  a  palladium  equivalent  (PdEq)  cut‐off  grade  was  assigned  based  on  economic  assumptions  from comparisons to other projects, and was used in the resource estimations. Resources reported in this press release use a cut‐off of 0.80 g/t PdEq. Grades have assumed 100% recoveries. The parameters used to generate the PdEq value are provided below:

PdEq=( (Au grade*$Au*Factor1)+(Pt grade*$Pt*Factor1)+(Pd grade*$Pd*Factor1)+(Ni grade*$Ni*Factor2)+(Cu grade*$Cu*Factor2) +(Co grade*$Co*Factor3))/($Pd*Factor1)

$Au = US$1271 per oz.

$Pt = US$1885 per oz.

$Pd = US$896 per oz.

$Ni = US$ 9.74 per lb.

$Cu = US$3.00 per lb.

$Co = US$15.90 per lb.

Factor1 = 0.0321508 (converts ounce per tonne to grams per tonne)

Factor2 = 22.04622 (converts pounds to grade percent)

Factor3 = 0.002205 (converts pounds to ppm)

3. The mineral resources were estimated using a block model with parent blocks of 10m x 10m x 5m and using ordinary kriging (OK) methods for grade estimation. A total of eight individual mineralized domains were identified. The determination technique of the mineral resource is based on the combination of geological modelling, geostatistics and conventional block modelling using the OK method of grade interpolation. The block model resource estimate prepared by the Tetra Tech, was based on more than 96,980 metres of diamond drilling in 462 diamond drill holes. The assay data was reviewed and a composite interval of 2.0 metres was used. Statistical and Variogram analyses were performed to determine the “nugget effect”.

4. Rhodium grades were not estimated by the OK methodology. Rhodium values were determined using a regression formula based on the platinum and palladium grades. Rhodium values are not incorporated into the PdEq value. The PdEq value also does not include silver.

5. The QAQC protocols and corresponding sample preparation and shipment procedures for the River Valley Project have been reviewed and approved by Tetra Tech.

6. An NI43‐101 compliant technical report will be filed on SEDAR within 45 days.

News Release, May 1st, 2012                                                                                                                                                                                           4 Table 2. River Valley Resource Tonnage at Selected PdEq Cut‐Off Grades

Measured
PdEq CUT‐OFF TONNES Pd (g/t) Pt (g/t) Rh (g/t) Au (g/t) Ag (g/t) Cu (%) Ni (%) Co (%) PdEq (g/t)
0.3052,189,1200.400.160.0150.030.470.040.010.0030.99
0.5040,576,1800.480.180.0170.030.490.050.010.0031.16
0.80 25,584,850 0.63 0.23 0.022 0.04 0.55 0.06 0.02 0.003 1.46
1.0018,785,4500.740.260.0260.050.580.070.020.0031.67
1.2013,791,2400.850.300.0290.050.620.070.020.0031.87
1.4010,202,7300.960.330.0320.060.650.080.020.0032.08
1.607,614,5801.070.360.0360.070.680.080.020.0032.28
1.805,569,2801.190.390.0390.070.710.090.020.0032.49
2.004,145,2801.310.420.0430.080.730.090.020.0032.69
Indicated
PdEq CUT‐OFF TONNES Pd (g/t) Pt (g/t) Rh (g/t) Au (g/t) Ag (g/t) Cu (%) Ni (%) Co (%) PdEq (g/t)
0.30141,557,3000.360.150.0140.030.200.040.010.0020.93
0.50114,501,9000.420.160.0160.030.220.050.010.0021.05
0.80 65,754,600 0.56 0.21 0.020 0.04 0.26 0.06 0.02 0.002 1.35
1.0043,959,9000.680.250.0240.040.290.070.020.0021.58
1.2030,943,2000.780.290.0270.050.320.070.020.0021.78
1.4021,704,5000.890.320.0310.060.350.080.020.0021.99
1.6015,202,5001.010.360.0340.060.380.080.020.0022.20
1.8010,991,5001.110.390.0380.070.410.090.020.0022.40
2.007,811,2001.220.430.0410.070.430.090.020.0022.60
Inferred
PdEq CUT‐OFF TONNES Pd (g/t) Pt (g/t) Rh (g/t) Au (g/t) Ag (g/t) Cu (%) Ni (%) Co (%) PdEq (g/t)
0.30130,872,0000.220.090.0090.020.080.040.020.0020.70
0.5096,299,0000.260.110.0100.020.080.040.020.0020.80
0.80 35,910,000 0.36 0.14 0.014 0.03 0.11 0.06 0.03 0.002 1.07
1.0017,803,0000.440.170.0160.030.130.060.030.0021.26
1.208,021,0000.530.200.0190.040.100.070.040.0021.46
1.403,703,0000.630.220.0220.040.100.080.040.0011.67
1.601,889,0000.720.230.0240.050.090.090.050.0011.83
1.80895,0000.780.260.0270.060.080.100.050.0001.99
2.00322,0000.850.300.0290.060.020.100.050.0002.16
Note: due to rounding, some totals may not appear to total properly
Mineral resources which are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, socio‐political, marketing, or other relevant issues.

Qualified Persons Statement 

The  mineral  resource  estimate  was  prepared  by  Tetra  Tech  of  Sudbury,  Ontario  under  the  supervision  of  Todd McCracken,  Principal  Geologist.  Mr.  McCracken  is  an  independent  qualified  person  as  defined  by  NI43‐101.  The effective date of the resource is May 1st, 2012.

The quality control, technical information and all aspects of the 2011 exploration program were supervised by Ali Hassanalizadeh, Vice President, Exploration of PFN and a Qualified Person under NI43‐101.  The information in this release was prepared under the direction of Dr. William Stone, President & COO of PFN and a Qualified Person as defined by NI43‐101.

News Release, May 1st, 2012                                                                                                                                                                                           5

About River Valley Project 

In January 2011, Pacific North West Capital Corp. successfully negotiated the 100% acquisition of the River Valley PGM  Project  from  Anglo  Platinum  Limited.  The  River  Valley  Project  is  one  of  North  America's  most  advanced 

primary PGM deposits. The project has excellent infrastructure support and is located 100 km from the city of  Sudbury, Ontario, Canada’s largest nickel‐copper‐PGM mining and metal recovery centre. 

About Pacific North West Capital Corp

PFN  is  a  mineral  exploration  company  whose  philosophy  is  to  be  a  project  generator,  explorer  and  project 

operator in order to option/joint venture its projects through to production. PFN is focused on the discovery,  exploration and development of PGM and nickel‐copper sulphide deposits in geologically prospective regions in  North America, particularly Canada. The Company’s key asset is its 100% owned River Valley PGM Project in the  Sudbury region of northern Ontario. PFN also has PGM and nickel‐copper projects and properties in northwest  Ontario, Saskatchewan, and Alaska, and an option to joint venture a base metal project in northwestern BC’s  Golden  Triangle  region.  The  Company  continues  to  evaluate  PGM  and  nickel‐copper  properties  and  projects  in North America for potential acquisition opportunities.

For further information, please visit PFN’s website at www.pfncapital.com or send requests to: 

Harry Barr  Bill Stone

Chairman & CEO  President  & COO 

Pacific North West Capital Corp.  Pacific North West Capital Corp. 

Tel:  604‐685‐1870  Tel: 416‐368‐5268 

Email: [email protected]  Email: [email protected] 

On behalf of the Board of Directors

Harry Barr  Chairman and CEO 

Disclaimer: This news release may contain certain "Forward‐Looking Statements" within the meaning of Section 21E of the United States Securities Exchange Act of 1934, as amended. All statements, other than statements of historical fact, included herein  are  forward‐looking  statements  that  involve  various  risks  and  uncertainties.  There  can  be  no  assurance  that  such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's expectations are disclosed in the Company's documents filed from time to time with The Toronto Stock Exchange, British Columbia Securities Commission and the United States Securities & Exchange Commission.

News Release, May 1st, 2012                                                                                                                                                                                           6