Wednesday, October 21, 2026
MiningNewsTerminal
Wednesday, October 21, 2026 Admin

NAM.V ·

PACIFIC NORTH WEST CAPITAL ACQUIRES 3RD 100% OWNED LITHIUM PROJECT LITHMAN WEST PROJECT, SOUTHEAST MANITOBA The company acquires 3rd 100% owned Lithium project LITHMAN WEST is located adjacent to the Tanco Mine Leases, southeast Manitoba

Mergers & Acquisitions Property Options & Staking
  • The Tanco Mine was Canada’s largest producer of spodumene, tantalum and cesium, producing from the Tanco Pegmatite
  • Spodumene is mined from pegmatites and is one of the primary lithium ore minerals in hard 

rock lithium mines

  • The Tanco Mine presently produces cesium formate, a completion fluid for the petroleum industry.
  • Project is located 1250 meters along geological strike and to the west of the Tanco Pegmatite 
  • The project has excellent infrastructure and is located approximately 140 km (87 miles) northeast of the provincial capital
  • LITHMAN WEST project is situated approximately 9 km from the Lithium One Project, our 2nd

project in the prolific Winnipeg River Pegmatite Field   

May 24, 2016 Vancouver, Canada – Pacific North West Capital Corp. (“PFN”, the “Company”) (TSX.V:  PFN; Frankfurt:  P7J.F; OTCQX: PAWEF announces that it has acquired through staking, an additional lithium project in southeast Manitoba. The project is held in Lithium Canada which is a 100% subsidiary of  PFN.  Mr.  Barr,  Chairman  and  CEO  noted  that  “The  project  was  selected  due  to  favorable  local 

geology  and  more  specifically  to  cover  the  gabbro  intrusive  unit  that  hosts  the  world‐class  Tanco  Pegmatite.  This  strategic  Lithium  acquisition  is  the  third  project  added  to  the  company’s  growing  portfolio  of  Lithium  and  Rare  Metals  projects  to  fuel  the  growing  demand  for  energy  storage  and  other core 21st Century Technologies.”

The LITHMAN WEST Project is situated to the west of the present day Tanco Mine, which currently is producing  cesium  formate,  a  completion  fluid  for  the  petroleum  industry.    The  Tanco  Mine,  was 

previously  stated  as  North  America’s  largest  producer  of  spodumene,  tantalum  and  cesium.  Spodumene is one of the primary lithium ores minerals in hard rock Lithium mines. The 100% owned project consists of 7 claims for a total area of 1,047 hectares (2,587 acres). The project is situated to the 

west and adjacent to the Tanco Mine Leases. 

The project area is situated in the Bird River Greenstone Belt and was staked to cover the gabbro  intrusive unit that hosts the Tanco Mine. The Tanco Mine is situated at the eastern edge of the gabbro intrusion and this rock unit extends to the west, across the LITHMAN WEST Project area. The project is 

located  approximately  1250  meters  west  from  the  known  extent  of  the  Tanco  Pegmatite  and  approximately  140  kilometers  (87  miles)  northeast  of  Winnipeg,  the  capital  of  the  province  of  Manitoba.  

News Release  1

The Tanco Pegmatite was discovered on the west side of Bernic Lake from surface drilling in the 1920’s. The mine went into production in 1969 and has produced over the years, in varying capacity, and is still producing today. It is a buried pegmatite and not exposed at surface, except for under Bernic Lake. It is an extremely fractionated, rare‐metal, complex type‐petalite subgroup, LCT (Lithium‐cesium‐tantalum) pegmatite and is hosted by a late stage, subvolcanic gabbro. The total tonnage of the Tanco pegmatite  has been calculated to be approximately 25 million tons. It is a part of the Bernic Lake Pegmatite Group of the Winnipeg River Pegmatite Field. A western extrapolation of the pegmatite group would extend it onto the LITHMAN WEST Project area.

The company considers the LITHMAN WEST Project to have the potential to host additional Lithium‐ bearing  pegmatites  similar  to  others  found  in  the  region.  The  area  has  strong  infrastructure,  is  an active mining area, and is along strike of a world‐class producing mine. The LITHMAN WEST Project and the  Lithium  One  Project  (PFN  News  Release  April  21st,  2016)  increases  the  company’s  presence  in southeast Manitoba and in the Winnipeg River Pegmatite Field, host to the world‐class Tanco Pegmatite.

With  respect  to  the  LITHMAN  WEST  Project,  a  finder’s  fee  in  the  amount  of  60,000  shares  of  the Company is payable to Carey Galeschuk. The finder’s fee is subject to TSX Venture Exchange approval.

All shares issued in connection with the finder’s fee are subject to a four month and one day hold period from the date of issuance.

Further  announcements  with  regards  to  joint  venture  partners  and  exploration  plans  will  be forthcoming.

News Release  2

About The Company’s Lithium Division 

The  company’s  new  Lithium  Division  will  focus  on  the  acquisition,  exploration  and  development  of Lithium Projects in Canada. In the United States the company will use its wholly owned U.S.A subsidiary to acquire and develop projects in active mining camps in Nevada, Arizona and California.

Management believes that these new age metals, Lithium, PGM’s and Rare Earths, have robust macro trends with surging demands and limited supply. Going forward, this new division will explore for the minerals needed to fuel the demand for energy storage and other core 21st Century Technologies.

The company has a growing portfolio of lithium projects. The Clayton Valley Forks Li Project in Nevada is a recent lithium brine project acquired by the company (PFN News Releases April 25th, 2016 and May 9th, 2016). The company also has hard rock lithium projects in Canada.

Lithium and Platinum group metal prices have improved dramatically in recent months. Lithium supplies  remain in deficit relative to their demand. Both metals groups are used for the expanding worldwide automobile  industry  (conventional  and  electric).  In  the  case  of  PGM’s,  demand  is  increasing  for autocatalysts,  a  key  component  for  reducing  toxic  emissions  for  automotive,  gasoline  and  diesel engines. In regards to Lithium, there is an ever increasing demand for batteries in cellphones, laptops, 

electric cars, solar storage, wireless charging and renewable energy products. 

About the company’s Platinum Group Metals Division 

Achievements to date and future plans for River Valley are outlined below as follows:

1. PFN currently has 100% ownership in the River Valley Project, subject to a 3% NSR, with options to buy down

2. Completed exploration and development programs on the River Valley property include more than 600 holes drilled since year 2000 and several mineral resource estimates and metallurgical studies;

3. Results for the current (2012) mineral resource estimate are below;

4. 2015 drill program confirms new high grade T2 discovery 

News Release  3

5. Exploration and development plans outlined for 2016

6. Ongoing strategic partner search for River Valley project

7. Results for the most recent Metallurgical Testwork Study are summarized below:

‐ Prepared by Tetra Tech (Wardrop)

‐ High Confidence: Measured plus Indicated = 72% of total ‐ Reported on PdEq basis: Pd=40% & Pt=20% of the payable metals ‐ Pd to Pt ratio = 2.5:1; Cu to Ni ratio = 3:1 ‐ High Grade potential, particularly in the north part of River Valley deposit

‐ Resources under evaluation for development potential as open pit mining operation 

News Release  4

8. Results for the 2015 discovery drill program on the T2 target are as follows:

‐Drill hole intercepts much higher than the average grade of current mineral resource estimate ‐Possible new mineralized zone at the north end of the River Valley deposit ‐Show potential to take the River Valley PGM Project in a new direction ‐More drilling required

News Release  5

9.   Exploration and Development Plans for 2016  

  • Mineral prospecting and geological mapping on surface
  • Drill programs targeted to add more higher grade 
  • Geological interpretation and 2D/3D modelling of all drill and surface results
  • Application  to  the  OPA's  Junior  Exploration  Assistance  Program  (JEAP)  for  33%  refund  of  all exploration expenditures up to $300,000.
  • Ongoing Strategic Partner Search for River Valley 

QUALIFIED PERSON 

The  contents  contained  herein  that  relates  to  Exploration  Results  or  Mineral  Resources  is  based  on information  compiled,  reviewed  or  prepared  by  Dr.  Bill  Stone,  Principal  Consulting  Geoscientist  for Pacific Northwest Capital.  Dr. Stone is the Qualified Person as defined by National Instrument 43‐101 and has reviewed and approved the technical content.

On behalf of the Board of Directors

“ Harry Barr “ 

Harry Barr  Chairman and CEO 

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward Looking Statements. This release contains forward‐looking statements that involve risks and uncertainties.  These statements may differ materially from actual future events or results and are based on current expectations or beliefs.  For this purpose, statements of historical fact may be deemed to be forward‐looking statements.  In addition, forward‐looking statements include statements in which the Company uses words such as “continue”, “efforts”,  “expect”,  “believe”,  “anticipate”,  “confident”,  “intend”,  “strategy”,  “plan”,  “will”,  “estimate”,  “project”,  “goal”,  “target”,  “prospects”,  “optimistic”  or similar expressions.  These statements by their nature involve risks and uncertainties, and actual results may differ materially depending on a variety of important factors, including, among others, the Company’s ability and continuation of efforts to timely and completely make available adequate current public information, additional or different regulatory and legal requirements and restrictions that may be imposed, and other factors as may be discussed in the documents filed by the Company on SEDAR (www.sedar.com), including the most recent reports that identify important risk factors that could cause actual results to differ from those contained in the forward‐looking statements.  The Company does not undertake any obligation to review or confirm analysts’ expectations or estimates or to release  publicly  any  revisions  to  any  forward‐looking  statements  to  reflect  events  or  circumstances  after  the  date  hereof  or  to  reflect  the  occurrence  of unanticipated events.  Investors should not place undue reliance on forward‐looking statements.

News Release  6