New Age Metals Palladium Exploration Plan Update for Q3

2020

June 24, 2020 Rockport, Canada – New Age Metals Inc. (TSXV: NAM; OTCQB: NMTLF;

FSE: P7J). NAM is pleased to announce plans for its Phase 2 2020 exploration and development

program at the Company’s 100% owned River Valley Palladium Project. This district-scale land

package and large mineral resource is located near the City of Sudbury, Ontario, and its

world-class mining and processing facilities.

Following completion of its successful Phase 1 drill program in May 2020 (see press release dated

June 2, 2020), Phase 2 of the 2020 field season will commence in July with exploratory drilling

and environmental baseline studies. The drill target prioritized for testing is a large chargeability

high detected in the 2017 IP survey (Figure 1), which was performed over the Pine Zone and

footwall at the northern end of the 16 km long River Valley Palladium deposit. The IP target

appears to be strongly chargeable, links to the eastern known extent of the Pine Zone resource via

a curvilinear chargeability trend about 300 metres long (Figure 1), and extends from approximately

120 metres to 340 metres below surface in geophysical inversion modelling of the IP survey

results.

New Age Metals TSX-V: NAM OTCQB: NMTLF

Field Office: 59 Burtch’s Lane, Rockport, ON, Canada, K0E 1V0 [email protected]

+1.613. 659.2773 www.newagemetals.com

Page2

Figure 1. Undrilled priority target from interpretation of the merged 2017 and 2018 IP survey

chargeability maps for the Pine Zone-Dana North Zone area of the River Valley Palladium Project

near Sudbury, Ontario. The Phase 2 program includes two vertical holes (PZ-20-07p and PZ-20-

08p) totalling 750 metres.

The Phase 2 drill program as planned consists of two vertical holes totalling 750 metres and will

be completed by a single diamond drill rig. Drilling is scheduled to commence in the third week

of July and should be completed within about two weeks. The drilling will test for presence of the

favourable Breccia Unit of the River Valley Intrusion (or feeder magma conduit), fault and fold

structures, and Palladium mineralization, either an along strike continuation of the Pine Zone or a

new zone (Figure 2). Assay results should be available from the laboratory by the end of August.

Pending results, the two Phase 2 holes and other holes nearby may be surveyed by downhole IP

techniques for off-hole anomalies. This drill program is the second phase of a three phase 5,000

metre drill program proposed for 2020.

New Age Metals TSX-V: NAM OTCQB: NMTLF

Field Office: 59 Burtch’s Lane, Rockport, ON, Canada, K0E 1V0 [email protected]

+1.613. 659.2773 www.newagemetals.com

Page3

Figure 2. Pseudo-section view looking roughly southwest along strike of target towards the Pine

Zone Palladium mineralization . Two Phase 2 drill hole locations (PZ-20-07p and PZ -20-08p)

shown in red. The objective of these two holes is to test for the presence of the following three

geological features: 1) the favourable host Breccia Unit; 2) Palladium mineralization (i.e., the IP

chargeability target); and 3) the Boundary Shear Zone.

In addition to the Phase 2 drill program, environmental baseline studies are planned to commence

in July. The baseline studies will include two components: 1) desktop study planning; and 2) site

reconnaissance. The desktop study planning component includes reviewing historic studies and

developing the baseline surface water, hydrology, aquatics, and archaeology programs. Adequate

consideration at the start is necessary to ensure that such programs are rigorously defined and that

the appropriate data are collected and aligned to support future permitting efforts.

Site reconnaissance will be completed to validate the desktop exercise , collect and analyze two

rounds of surface water samples, carry out some hydrology work and aquatic fish community and

habitat work, and complete a Stage 1 archaeological assessment within the River Valley Project

area. The reconnaissance work m ay continue into Q4 2020, depending on progress and field

conditions.

New Age Metals TSX-V: NAM OTCQB: NMTLF

Field Office: 59 Burtch’s Lane, Rockport, ON, Canada, K0E 1V0 [email protected]

+1.613. 659.2773 www.newagemetals.com

Page4

About the River Valley Palladium Project

The details of the updated Mineral Resource Estimate (MRE) and Preliminary Economic

Assessment (PEA) were announced in the press release dated August 9, 2019 and are described on

NAM’s website. The pit constrained Updated Mineral Resource Estimate formed the basis of the

PEA. At a cut-off grade of 0.35 g/t PdEq, the Updated Mineral Resource Estimate contains 2.867

Moz PdEq in the Measured plus Indicated classifications and 1.059 Moz PdEq in the Inferred

classification. The PEA is a preliminary report, but it demonstrates that there are potentially

positive economics f or a large -scale mining open pit operation, with 14 years of Palladium

production. Refer to the NAM website (www.newagemetals.com) for details.

About NAM

New Age Metals is a junior mineral exploration and development company focused on the

discovery, exp loration and development of green metal projects in North America .

The Company has two divisions; a Platinum Group Metals division and a Lithium/Rare Element

division. The PGM division includes the 100% owned River Valley Project, one of North

America’s largest undeveloped Platinum Group Metals Projects, situated 100 k m from Sudbury,

Ontario and the Genesis PGM Project in Alaska. The Lithium division is the largest mineral claim

holder in the Winnipeg River Pegmatite Field where the Company is e xploring for hard rock

lithium and various rare elements such as tantalum and rubidium. Our philosophy is to be a project

generator with the objective of optioning our projects with major and junior mining companies

through to production. New Age Metals is a junior resource company on the TSX Venture

Exchange, trading symbol NAM, OTCQB: NMTLF; FSE: P7J with 13 7,347,966 shares

issued to date.

Agoracom

The Company also announces that further to its new release of March 17, 2020, the Company has

issued 246,545 common shares to Agora Internet Relations Corp. ("AGORACOM") pursuant to

the terms of the agreement. Shares issued are subject to regulatory hold period of four months

plus one day expiring on October 25, 2020 in accordance with applicable securities laws.

Investors are invited to visit the New Age Metals website at www.newagemetals.com where they

can review the company and its corporate activities. Any questions or comments can be directed

to [email protected] or Harry Barr at [email protected] or Cody Hunt at

[email protected] or call 613 659 2773.

New Age Metals TSX-V: NAM OTCQB: NMTLF

Field Office: 59 Burtch’s Lane, Rockport, ON, Canada, K0E 1V0 [email protected]

+1.613. 659.2773 www.newagemetals.com

Page5

Opt-in List

If you have not done so already, please sign-up on our website (www.newagemetals.com) to

receive our updated news.

Qualified Person

The contents contained herein that relate to Exploration Results or Mineral Resources is based on

information compiled, reviewed or prepared by Bill Stone, P.Geo., a consulting geoscientist for

New Age Metals. Dr. Stone is the Qualified Person as defined by National Instrument 43-101 and

has reviewed and approved the technical content of this news release.

On behalf of the Board of Directors

“Harry Barr”

Harry G. Barr

Chairman and CEO

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward Looking Statements: This release contains forward-looking statements that involve risks and

uncertainties. These statements may differ materially from actual future events or results and are based on current expectations or

beliefs. For this purpose, statements of historical fact may be deemed to be forward-looking statements. In addition, forward-

looking statements include statements in which the Company uses words such as “continue”, “efforts”, “expect”, “believe”,

“anticipate”, “confident”, “intend”, “strategy”, “plan”, “will”, “estimate”, “project”, “goal”, “target”, “prospects”, “optimistic” or similar

expressions. These statements by their nature involve risks and uncertainties, and actual results may differ materially depending on

a variety of important factors, including, among others, the Company’s ability and continuation of efforts to timely and completely

make available adequate current public information, additional or different regulatory and legal requirements and restrictions that

may be imposed, and other factors as may be discussed in the documents filed by the Company on SEDAR (www.sedar.com),

including the most recent reports that identify important risk factors that could cause actual results to differ from those contained in

the forward-looking statements. The Company does not undertake any obligation to review or confirm analysts’ expectations or

estimates or to release publicly any revisions to any forward-looking statements to reflect events or circumstances after the date

hereof or to reflect the occurrence of unanticipated events. Investors should not place undue reliance on forward-looking

statements.