Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NAM.V ·

New Age Metals Expands Northern Shield Pgm–cu–ni and Critical Minerals Project to ~34,000 Hectares IN Ontario’S Ring of Fire

Mergers & Acquisitions

1 | P a g e

New Age Metals TSX-V: NAM OTCQB: NMTLF

Field Office: 59 Burtch’s Lane, Rockport, ON, Canada, K0E 1V0 [email protected]

+1.613. 659.2773 www.newagemetals.com

NEW AGE METALS EXPANDS NORTHERN SHIELD PGM–CU–NI AND

CRITICAL MINERALS PROJECT TO ~34,000 HECTARES IN

ONTARIO’S RING OF FIRE

April 8, 2026 – Rockport, Ontario–New Age Metals Inc. (TSX.V: NAM | OTCQB: NMTLF | FSE: P7J)

(“NAM” or the “Company”) is pleased to announce the acquisition, through staking, of the northern

extension of its Northern Shield Platinum Group Metals–Cu–Ni and Critical Minerals Project in Ontario’s

Ring of Fire region. This expansion increases the total project footprint to approximately 34,000

hectares (84,000 acres) and strengthens the Company’s land position along interpreted mafic –ultramafic

geological trends, building on its previously announced Northern Shield acquisition.

Harry Barr, Chairman and CEO, commented: “To our shareholders, the Northern Shield Northern

Extension represents another important step in building long -term value through disciplined project

consolidation. By staking this additional ground, we have now secured what we believe to be the full extent

of the layered mafic intrusive complex associated with Northern Shield. That is a meaningful strategic

achievement.

This additional land strengthens our control of a highly prospective geological system in one of Canada’s

most important emerging critical minerals districts. Our technical team continues to do an excellent job

identifying opportunities to expand and impro ve the quality of our project pipeline, and this northern

extension is another example of that work creating shareholder value.

As infrastructure momentum continues to build in the Ring of Fire, we believe it is important to establish

land positions in advance of future regional development. We will continue to advance Northern Shield in

a systematic and disciplined manner.”

Highlights

• 100% owned, acquired through staking with no option payments or earn-in obligations

• Land position expanded to ~3 4,000 hectares (~ 84,000 acres) comprising 1, 695 claims,

consolidating prospective ground within Ontario’s Ring of Fire

• The Company intends to proactively engage and consult with local First Nations in

accordance with New Age Metals’ established policy of meaningful and ongoing collaboration

with Indigenous communities

• Northern extension captures additional interpreted bedrock EM conductors prospective for

platinum group metals and nickel-copper mineralization

• Expanded footprint strengthens control along interpreted intrusive and structural trends associated

with magmatic sulphide systems

2 | P a g e

New Age Metals TSX-V: NAM OTCQB: NMTLF

Field Office: 59 Burtch’s Lane, Rockport, ON, Canada, K0E 1V0 [email protected]

+1.613. 659.2773 www.newagemetals.com

• Building upon an extensive historical exploration database including airborne geophysics,

ground EM surveys, mapping, and previous diamond drilling

• Systematic data compilation underway to refine targets and prioritize field programs ahead of drill

targeting

• Ongoing regional consolidation strategy with continued evaluation of additional acquisitions in the

immediate area

• Strategic addition to New Age Metals’ Platinum Group Metals project pipeline,

complementing the Company’s River Valley PGM Project, Genesis PGM –Cu–Ni Project, and

recently acquired Northern Shield PGM Project and the Platreef PGM Project (Ontario)

• Government momentum continues to strengthen the district, with Ontario targeting 2026 for

commencement of the Ring of Fire supply road, supporting long -term regional access and

development potential

Northern Shield Project Overview

The Northern Shield Project represents a large, contiguous land position within the Ring of Fire region of

northern Ontario, targeting magmatic sulphide systems prospective for platinum group metals (PGM),

nickel, and copper.

The Property is interpreted to cover portions of a layered mafic–ultramafic intrusive complex supported by

historical drilling, airborne and ground geophysics, and publicly available Ontario assessment records. The

system is considered prospective for reef-style PGM –Ni–Cu sulphide mineralization , as well as

vanadium-rich magnetite layers.

The Fishtrap Lake Intrusive Complex is characterized by:

• Cyclic anorthosite–gabbro–pyroxenite stratigraphy

• Magnetite-rich horizons

• Localized sulphide mineralization

These features are consistent with geological environments known globally to host stratiform PGM-bearing

systems.

The Northern Shield Project is situated within the James Bay Lowlands region of Ontario, an emerging

critical minerals district that includes the Ring of Fire and nearby exploration and development projects

operated by groups such as Wyloo Metals (see Figure 1). Ongoing exploration activity and advancing

regional infrastructure initiatives underscore the growing strategic importance of this part of northern

Ontario.

3 | P a g e

New Age Metals TSX-V: NAM OTCQB: NMTLF

Field Office: 59 Burtch’s Lane, Rockport, ON, Canada, K0E 1V0 [email protected]

+1.613. 659.2773 www.newagemetals.com

Figure 1. Location map of newly acquired Northern Extension (in Red) of the Northern Shield Project now

encompassing a grand total of ~34,000 hectares. Also located proximal to MetalQuest Ring of Fire Projects.

Reflecting this broader regional activity, MetalQuest Mining Inc. (“MQM”) announced on December 3,

2025, that it secured the ROF-1 Project and recently announced on January 23, 2026, the Fishhook

Polymetallic Project, a critical minerals land package within the Ontario Ring of Fire . New Age Metals

currently holds an equity interest in MetalQuest Mining , providing the Company with additional

exposure to exploration activity in the Ring of Fire and reinforcing its strategic focus on platinum group

metals and critical minerals in Northern Ontario.

Data compilation and geological interpretation will continue across the expanded land package to

prioritize targets and optimize exploration planning. The Company intends to advance select targets

toward field validation and potential drill testing as part of its phased exploration strategy.

Ring of Fire Road Completion Date

The Government of Ontario has outlined an accelerated plan to develop all-season road access into the Ring

of Fire, a critical step toward unlocking the region’s significant mineral potential. Construction of the road

4 | P a g e

New Age Metals TSX-V: NAM OTCQB: NMTLF

Field Office: 59 Burtch’s Lane, Rockport, ON, Canada, K0E 1V0 [email protected]

+1.613. 659.2773 www.newagemetals.com

network is expected to begin in mid-2026, with multiple segments advancing concurrently in partnership

with local First Nations communities. These roads are designed to connect remote northern communities

to the provincial highway system while also enabling access to key exploration and developm ent areas

within the mineral belt.

Under the current plan, portions of the road network are expected to be operational by 2030, with full

completion targeted for approximately 2031 , several years ahead of earlier expectations. This

infrastructure development is anticipated to significantly improve access, reduce exploration costs, and

support long-term economic development across the region, positioning the Ring of Fire as a strategic hub

for critical minerals in Canada.

Figure 2. Ontario Premier Doug Ford speaks at the Prospectors and Developers Association of Canada conference in

Toronto on March 3 rd, 2026. (Evan Mitsui/CBC) https://www.cbc.ca/news/science/ontario-critical-minerals-mining-

climate-9.7117971

Additional, regional initiatives include proposed all-season access road development, intended to improve

connectivity, reduce exploration costs, and support long-term economic opportunities in collaboration

with local First Nations communities. This growing infrastructure and exploration momentum

underscores the strategic importance of projects located within and adjacent to the Ring of Fire.

5 | P a g e

New Age Metals TSX-V: NAM OTCQB: NMTLF

Field Office: 59 Burtch’s Lane, Rockport, ON, Canada, K0E 1V0 [email protected]

+1.613. 659.2773 www.newagemetals.com

Figure 3. Prime Minister Mark Carney and Ontario Premier Doug Ford signing an agreement on the Ring

of Fire Road. Source: https://ontarioconstructionnews.com/ford-predicts-shovels-in-the-ground-by-june-

as-ontario-and-canada-move-forward-on-ring-of-fire

The Premier of Ontario, Mr. Doug Ford was quoted on December 23, 2025, in the Ontario Construction

News: “This will create jobs, build a more competitive economy and help unlock the enormous

economic opportunity of the Ring of Fire.”

Mr. Ford went on to add “The agreement is the last one needed to launch construction on the Ring of

Fire. He predicts shovels will be in the ground in June 2026, as soon as the ground thaws, three whole

years ahead of schedule.”

Qualified Person

Troy Gallik, P.Geo. (Member ID 3550), a Practising Registrant and Qualified Person (“QP”) as defined by

National Instrument 43-101 – Standards of Disclosure for Mineral Projects , has reviewed and approved

the scientific and technical information contained in this news release.

Mr. Gallik is a geological consultant to New Age Metals Inc. and is not independent for the purposes of NI

43-101. Mr. Gallik also holds an underlying royalty interest in the Project.

6 | P a g e

New Age Metals TSX-V: NAM OTCQB: NMTLF

Field Office: 59 Burtch’s Lane, Rockport, ON, Canada, K0E 1V0 [email protected]

+1.613. 659.2773 www.newagemetals.com

The Qualified Person has reviewed available assessment files, historical drill logs, geophysical datasets,

government geological data, and publicly available technical reports relevant to the Project area. The QP

has not completed sufficient work to independently verify all historical exploration data referenced herein;

however, the QP considers such information to have been collected using industry -standard practices and

to be reasonably reliable for the purposes of early-stage exploration and target generation.

Mineral resources referenced on adjacent properties are not necessarily indicative of mineralization on the

Project.

About NAM

New Age Metals is a junior mineral exploration and development company focused on the discovery,

exploration, and development of critical green metal projects in North America. The Company has three

divisions: a Platinum Group Element division, a Lithium/Rare Metals division, an Antimony-Gold Division

as well as an investment in MetalQuest Mining’s (TSXV:MQM | OTC:MQMIF) high purity Lac Otelnuk

Iron Project.

The PGM Division includes the 100% owned, multi-million-ounce, district-scale River Valley Project,

one of North America’s largest undeveloped Platinum Group Element Projects, situated 100 km by

road east of Sudbury, Ontario. In addition to River Valley, NAM owns 100% of the Genesis PG M-Cu-

Ni Project in Alaska. Most recent PGM announcement: https://newagemetals.com/new-age-metals-

prepares-its-platinum-group-metals-division-to-launch/.

On January 21 st 2026, the Company recently expanded its Platinum Group Metals portfolio through the

acquisition of the Northern Shield PGM Project in Ontario’s Ring of Fire region, strengthening its exposure

to district-scale mafic–ultramafic systems prospective for nickel, copper, and platinum group elements.

On February 26, 2026, the Company also acquired the Platreef PGM and Escape East PGM Projects, both

platinum group metals –nickel–copper (PGM –Ni–Cu) exploration propert ies located in northwestern

Ontario within and nearby the prospective Lac des Iles Igneous Complex. The Complex hosts Canada’s

only primary palladium-producing operation, owned and operated by Impala Canada Ltd., a wholly owned

subsidiary of Impala Platinum Holdings Limited.

New Age Metals’ Antimony –Gold division is located in Newfoundland and comprises a 20,950 -

hectare land package across 11 non-contiguous properties. Six of these properties are situated in the St.

Alban’s area, along Canstar’s Swanger and Little River mineralized trends. The remaining five properties

are strategically positioned along the same regional geological trend as the past -producing Beaver Brook

Antimony Mine and are also located near New Found Gold’s Queensway South Gold Project.

Management has completed Phase 1 exploration and has now finished Phase 2 fieldwork. The Phase 2

program successfully delineated multiple gold –antimony (Au–Sb) trends, and the Company is currently

planning follow-up exploration while awaiting additional assay results. These results will be used to guide

7 | P a g e

New Age Metals TSX-V: NAM OTCQB: NMTLF

Field Office: 59 Burtch’s Lane, Rockport, ON, Canada, K0E 1V0 [email protected]

+1.613. 659.2773 www.newagemetals.com

exploration targeting and program planning for 2026 and beyond. Most recent releases:

https://newagemetals.com/axiom-exploration-group-initiates-xcite-helicopter-borne-tdem-survey-over-

nams-sentinel-antimony-property-newfoundland-nam-monitors-fintech-solutions-to-enhance-market-

transparency/

https://newagemetals.com/new-age-metals-samples-high-grade-antimony-gold-silver-and-lead-at-st-

albans-newfoundland-and-starts-phase-2-exploration/

The Bonanza Ridge Gold and Critical Metals Project has been significantly expanded with the option

agreements for the Lavender Lake and South Gibi Lake properties, adding a combined ~5,216 hectares

(~12,889 acres) of prospective ground in the Kenora Gold District of northwestern Ontario. These

properties, located about 25 km southeast of Kenora, are strategically positioned along a favourable

structural corridor adjacent to NAM’s flagship Bonanza Gold Property, and host known gold and copper

occurrences wit h minimal modern exploration to date. The consolidated portfolio now comprises

approximately 8,500 hectares of contiguous land within an emerging gold and critical metals jurisdiction,

providing substantial opportunities for follow -up field work, structural modeling, target generation, and

future drill campaigns. Recent announcement: https://newagemetals.com/new-age-metals-expands-

bonanza-ridge-gold-andcritical-metals-project-strategic-acquisition-oflavender-lake-south-gibi-lake-

properties/.

The Company is establishing a Kenora, Ontario based field operations hub to support exploration

activities across Northwestern Ontario and Eastern Manitoba. The proposed facility would provide

centralized logistical, technical, and administrative support for regional exploration programs and is

expected to improve field efficiency and coordination.

The Company’s Lithium Division is one of the largest mineral claim holders in the Winnipeg River

Pegmatite Field, where the Company is exploring hard rock lithium and various rare elements such as

tantalum, rubidium, and cesium. NAM is developing its lithium division in conjunction with its Farm-

in/Joint Venture agreement with Mineral Resources Ltd. (“MinRes”), one of the world’s largest

lithium producers. A minimum budget to maintain the Projects has been approved by Mineral Resources

Ltd for May 2025 to April 2026. Management is currently working on providing Mineral Resources, a go

forward exploration program for spring, summer, and fall 2026.

In April 2024, a $1.5M NSERC Alliance grant was awarded to a collaboration led by the University

of Manitoba (Drs. Fayek and Camacho), with academic partners from Lakehead University (Dr.

Hollings) and industry partners including New Age Metals and Grid Metals. This research is focused

on advancing Canada’s critical metals sector, with New Age Metals’ portion targeting its Bird River lithium

properties. The 2025 work included core sampling and field visits . The project will likely extend beyond

the original 3-year term, due to its delayed start. The parties involved in this grant plan to meet over the

next 60 days and will announce our plans for 2026 and beyond.

8 | P a g e

New Age Metals TSX-V: NAM OTCQB: NMTLF

Field Office: 59 Burtch’s Lane, Rockport, ON, Canada, K0E 1V0 [email protected]

+1.613. 659.2773 www.newagemetals.com

New Age Metals Inc. is supporting a successful $180K Mitacs research grant, awarded in 2023,

through its $90K contribution (already accounted for and paid under the Mineral Resources joint

venture). This academic partnership with the University of New Brunswick and the University of British

Columbia is focused on understanding the origin and controls of lithium pegmatite mineralization in the

Cat Lake–Winnipeg River field. MSc and post-doctoral research programs have recently been completed,

and the Company is reviewing the results with the academic institutions to assess how the findings may be

incorporated into future exploration programs. This collaboration provides access to top -tier scientific

expertise and equipment, significantly reducing analysis costs and adding long -term value to the

project.

The Company is actively seeking an option/joint venture partner for its road -accessible Genesis

PGM-Cu-Ni Project in Alaska and results from our Summer/Fall Program are expected by the end

of the year. Recent announcement: https://newagemetals.com/new-age-metals-completes-summer-

2025-exploration-program-on-the-genesis-pgm-cu-ni-project-alaska/ .

On August 6, 2025, New Age Metals announced an additional investment in a 4th critical metal. NAM

currently owns approximately 9.63% and holds warrants that, if exercised with today’s issued and

outstanding shares of MQM, would bring NAM to a 14.6% interest in MetalQuest Mining inc.

MetalQuest Mining Inc. is developing one of North Americas largest iron projects, where

approximately $120 million has been spent on the project. For more information, please visit

MetalQuestMining.com . High-purity iron became a critical metal Federally in Canada and in the

Provinces of Quebec and Newfoundland and Labrador in 2024. In the summer of 2025, MQM

contracted AtkinsRealis, an international engineering company, to complete a GAP Analysis on the

Lac Otelnuk Project and its 2015 Feasibility Study. Results are expected in Q1 2026.

MetalQuest Mining Inc. (“MQM”) has expanded its presence in the Ontario Ring of Fire through

the acquisition of both the ROF-1 Project and the recently announced Fishhook Polymetallic Project.

The Fishhook Project further strengthens MetalQuest’s regional footprint, targeting polymetallic

mineralization prospective for base and critical metals.

Management is currently aggressively seeking new mineral acquisition opportunities on an

international scale. Our philosophy is to be a project generator with the objective of optioning our projects

with major and junior mining companies through to production.

Investors are invited to visit the New Age Metals website at www.newagemetals.com where they can

review the company and its corporate activities. Any questions or comments can be directed to

[email protected] or Harry Barr at [email protected] or Farid Mammadov at

[email protected] or call 613 659 2773.