Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NAM.V ·

New Age Metals Announces Second Phase Drilling Results on the Lithium Two Project, MB

Drill Results

Page1

New Age Metals Announces Second Phase Drilling Results on the Lithium

Two Project, MB

May 13th, 2023, Rockport, Ontario - New Age Metals Inc. (TSX.V: NAM; OTCQB: NMTLF;

FSE: P7J2) (“NAM” or the “Company”) in conjunction with its partners Mineral Resources

Limited (“MinRes”) is pleased to report the results for its second phase drilling at Lithium Two

Project that is part of its Manitoba Lithium Division. The program was completed in March and

consisted of 16 diamond drill holes, totalling 3,086 metres. Drilling tested the down dip extension

of Eagle Pegmatites high grade zone intersected in the phase one drill program, as well as

exploratory drilling testing nearby pegmatites and magnetic low anomalies/structures identified in

the 2021 detailed UAV magnetics survey.

Highlights:

• The drill program successfully intersected spodumene bearing pegmatite in all drill

holes targeting the Eagle Pegmatite with a consistent steeply dipping orientation.

• Drilling extended the known high grade Li mineralization zone below 150 m vertically

and remains open at depth.

• 2023 assays include 1.08 % Li2O over 8.7 m (LT-23-21), 1.06% Li2O over 6.85 m (LT-

23-16), 1.06 % Li2O over 5.9 m (LT-23-24).

• Newly encountered spodumene bearing lenses proximal to FD No. 5 Pegmatite

warrant further exploration.

• The Company is in the process of applying for 2024 winter drilling permits to test

additional targets on the property.

• The Project is located 38 km from Tanco Mine , and lies along trend of the Donner

Lake Lithium Project and the Irgon Pegmatite.

Figure 1: LT-23-21 Spodumene mineralization, 221.0 m - 221.4 m

Table 1: 2023 Lithium Two Drill Hole Assay Highlights Table

Page2

Hole ID to (m) from

(m)

Interval*

(m) % Li2O

LT-23-16 119.8 121 1.2 0.91

150.15 157 6.85 1.06

including 150.15 152.8 2.65 1.80

LT-23-17 114.95 119.55 4.6 1.01

including 115.45 117.23 1.78 1.97

143.38 145.85 2.47 2.19

including 144.13 144.63 0.5 4.20

LT-23-18 187.15 188.6 1.45 1.14

206 206.4 0.4 2.22

LT-23-20 65.15 70.9 5.75 0.92

including 66.9 68.35 1.45 2.08

91.5 97 5.5 1.01

LT-23-21 217.3 226 8.7 1.08

including 220.7 221.4 0.7 3.20

LT-23-23 179.4 180.6 1.2 0.85

191.5 193.25 1.75 1.19

LT-23-24 195 200.9 5.9 1.06

LT-23-26 44.8 45.6 0.8 1.26

100.25 100.75 0.5 2.14

The Company is encouraged by the overall results of the second phase of drilling on the Lithium

Two Property. High grade lithium intercepts were encountered in six drill holes testing the

extension of the Eagle Pegmatite including samples that graded up to 4.20% Li2O (over 0.5 m

core length). The program was successful in extending the Eagle Pegmatite mineralized zone

to a depth of 150 m below surface (Figure 6).

Page3

Figure 2: LT-23-21 Spodumene bearing pegmatite, 213.9 m – 228.75 m

Exploration drilling along trend to the east encountered new spodumene bearing pegmatites

proximal to the FD No. 5 Pegmatite (Figure 3, 4). LT-23-26 was targeting an offset in the magnetic

trend south of the FD No. 5 Pegmatite surface showing. The drilling encountered two spodumene

bearing pegmatites (at 44.8 m grading 1.26 % Li2O over 0.8 m , and at 100.25 m grading 2.14 %

Li2O over 0.5 m ). These intersects occurred below barren surface mapped pegmatit es

indicating that mineralization may occur at depth and reinforce s that this area of the

property has high potential for hosting more Li mineralization warranting further

exploration.

Figure 1: LT-23-26 Spodumene bearing pegmatite intercept, 39.9 m - 49.0 m

Page4

Figure 2: LT-23-26 Spodumene bearing pegmatite intercept, 99.6 m - 101.2 m

Figure 3: 2021 - 2023 Lithium Two Drill Program Overview

Page5

Figure 4: DDH LT-21-09 Cross-Section

Sample Quality Assurance / Quality Control

A thorough chain-of-custody and QA/QC program was carried out during the 2023 drill program.

Samples were taken across all spodumene-bearing pegmatite with shoulder samples into the barren

host rock on either side of the dykes. Sample lengths were 0.3 m to 1.5 m, dependent on internal

Page6

zoning of the dykes and lithology contacts. Core to be sampled was cut in half with one half being

sent for analysis and the other half remaining in the box for reference.

The company’s implemented QA/QC procedures included the insertion of certified standard

control samples, ¼ cut duplicates, and blanks. This was used to test for natural variability/sampling

bias / testing the lab for homogeneity during sample preparation processes within the lab as well

as testing the precision and any possible contamination from the lab and ensure proper calibration

of lab equipment.

Sample analyses was conducted by SRC Geoanalytical Laboratories (SRC) in Saskatoon,

Saskatchewan. The drill core samples were subject to three separate analyses including: ICP -MS

on partial digestion, ICP -OES for major and minor element s on the total digestion, and ICP -MS

for trace elements on total digestion. SRC inserts one blank, two certified reference materials, and

one replicate (pulp) digested with each set of 40 samples to ensure analytical quality control. The

quality management system at SRC operates in accordance with ISO/IEC 17025, General

Requirements for the Competence of Testing and Calibration Laboratories; and is also compliant

to ASB, Requirements and Guidance for Mineral Analysis Testing Laboratories. The management

system and selected methods are accredited by the Standards Council of Canada.

About Lithium Two Project

The Lithium Two Project covers 137 hectares and is located approximately 20 kilometres north of

the Tanco Mine, a currently producing hardrock lithium mine. The project is geologically situated

in the Cat Lake portion of the Winnipeg River Pegmatite Field and is road accessible.

The Eagle Pegmatite is exposed at surface along roughly 530 meters as a series of lenticular

spodumene-bearing dykes which occur in (Precambrian) granite and meta -volcanic rock. The 10

largest of these pegmatite bodies are en-echelon lenses that range up to 75 m in length and 9 m in

width as exposed (Rowe, 1956). The Eagle Pegmatite has a general strike of 77° and an 80° to near

vertical dip. The FD No. 5 Pegmatite is surface exposed over an area of 27 and 15 metres and is

poorly exposed away from the main showing. The unit strikes at 80° with a near vertical dip to the

north.

Page7

Figure 5: Mineralized (spodumene) Eagle Pegmatite intercept from drill hole LT-21-09

An archaeological assessment was completed by White Spruce Archaeology on the Lithium Two

Project that has identified three areas of archaeological potential. Drilling activity will occur

outside of a 25 -metre buffer around the identified areas. All drill trails will stay outside of the

identified areas. The recommendations for the Lithium Two Project have been reviewed and

agreed to by the Archaeological Assessment Services Unit, Historic Resources Branch, Ministry

of Sport, Culture and Heritage.

About NAM

New Age Metals is a junior min eral exploration and development company focused on the

discovery, exploration, and development of green metal projects in North America. The Company

has two divisions: a Platinum Group Metals division and a Lithium/Rare Element division.

The PGM Division includes the 100% owned, multi -million-ounce, district-scale River Valley

Project, one of North America’s largest undeveloped Platinum Group Metals Projects, situated 100

km by road east of Sudbury, Ontario. In addition to River Valley, NAM owns 100% of th e road

accessible Genesis PGM-Cu-Ni Project in Alaska and plans to complete a Option -Joint Venture

arrangement with a third party mining company to develop the project.

The Company’s Lithium Division is one of the largest mineral claim holders in the Winnipeg River

Pegmatite Field, where the Company is exploring for hard rock lithium and various rare elements

such as tantalum, rubidium, and caesium. Further Exploration plans for 2023 include continued

mapping/sampling field programs following up on prospective trends outlined in the magnetic data

and 2022 surface sampling. The company has a partnership with Mineral Resource Limited (MRL,

ASX: MIN), a top global lithium producer to explore and develop the Company’s lithium project

portfolio. The company is aw aiting 2023 exploration plan and budget approval from Mineral

Resources Limited.

Page8

Our philosophy is to be a project generator with the objective of optioning our projects with major

and junior mining companies through to production. The Company is actively seeking an option/

joint venture partner for its road-accessible Genesis PGM-Cu-Ni project in Alaska.

Investors are invited to visit the New Age Metals website at www.newagemetals.com where they

can review the company and its corporate activities. Any que stions or comments can be directed

to [email protected] or Harry Barr at [email protected] or Farid Mammadov at

[email protected] or call 613 659 2773.

Qualified Person

The technical information in this news release has been reviewed and approved by Lynde

Guillaume, P.Geo. (Senior Geologist, Axiom), who is a “Qualified Person” for the Company as

defined under National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-

101”). Lynde is a Professional Geoscientist (P.Geo) who is a registered member of the ‘Engineer

and Geosciences of Manitoba’ (no. 47952).

Opt-in List

If you have not done so already, we encourage you to sign up on our website

(www.newagemetals.com) to receive our updated news.

On behalf of the Board of Directors

“Harry Barr”

Harry G. Barr

Chairman and CEO

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of

this release. Cautionary Note Regarding Forward Looking State ments: This release contains

forward-looking statements that involve risks and uncertainties. These statements may differ

materially from actual future events or results and are based on current expectations or beliefs.

For this purpose, statements of hist orical fact may be deemed to be forward -looking statements.

In addition, forward-looking statements include statements in which the Company uses words such

as “continue”, “efforts”, “expect”, “believe”, “anticipate”, “confident”, “intend”, “strategy”,

“plan”, “will”, “estimate”, “project”, “goal”, “target”, “prospects”, “optimistic” or similar

expressions. These statements by their nature involve risks and uncertainties, and actual results

may differ materially depending on a variety of important factors, i ncluding, among others, the