Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

NAM.V ·

Lithium Division - Manitoba and Platinum Group Metals Division - Ontario Exploration and Development Update  A minimum of $500,000 will be expended in 2018 on the companies Lithium division by New Age Metals (NAM) option/joint venture partner Azincourt Energy Corp.

Mergers & Acquisitions Partnerships & JV

1

Lithium Division

-

Manitoba

and

Platinum Group Metals

Division

-

Ontario

Exploration

and Development

Update

A minimum of $500,000 will be expended in 2018 on the companies Lithium

division by New

Age Metals

(NAM)

option/joint venture partner Azincourt Energy Corp. (TSX.V: AAZ)

(see news release dated

January 15th, 2018

).

Lithium management committee formed and first

management committee

meeting

complete.

The Lithium Division’s 5 p

rojects

, 3 of which are drill ready,

cover over 6,000 hectares

and

are one of the largest claim holdings in the Winnipeg River

Pegmatite field

(64 square

kilometres)

.

NAM’s technical team is the field manager

of the project

and is currently finalizing a Phase

1

exploration plan for 2018.

Further announcements will be forthcoming.

PGM Division:

River Valley is the

l

argest

u

ndeveloped

p

rimary Platinum Group Metals (PGM)

resource in Canada,

with 3.9Moz PdEq

in Measured Plus Indicated

including an additional

1.2Moz PdEq

in

I

nferred

.

The

100% owned

River Valley PGM P

roject

has excellent

infrastructure

and is

within 100 kilometers

of

the Sudbury Metallurgical

C

omplex.

Updated NI 43

-

101 resource calculations with WSP Canada have commenced and

the report

is

expected to be completed in Q1

-

2018.

Ground

IP geophysics

in progress to test

further

footwall

regions of

the T

4 to T9 anomalies

for additional footwall mineralization

Mineralogical testing is ongoing

in Sudbury at

Expert

Process Solutions (XPS).

The

p

rice of Pall

adium,

the prominent metal at River Valley is trading at

$

1,0

28

.

30

USD

(

March

2018)

near its

all

-

time

high based on limited supply and increasing demand.

February

22

nd

, 2018

Vancouver, Canada

–

New Age Metals Inc.

(NAM)

(TSX

.

V: NAM; OTCQB: PAWEF;

FSE: P7J.F)

Harry Barr, Chairman &

CEO,

stated

;

“

W

e are pleased to update our shareholders and

interested parties as to our

present

exploration program on our

5 Manitoba Lithium Projects and

update

you

on our River Valley PGM project.

Both

of the

company’s

mineral

divisions

have

aggressive exploration and development plans for

2018 and the balance of this release will provide

you with more specific details.

”

Exploration Plans for Lithium Division 2018

The Company has five pegmatite hosted Lithium Projects in the

Winnipeg River Pegmatite Field

,

located in S

outh

E

ast

Manitoba.

In January, NAM announced a signed final agreement with Azincourt

Energy Corp. (TSX.V: AAZ) for

the Manitoba Lithium Projects

.

(News Release:

January 15th, 2018

) This Pe

gmatite Field hosts the

world class Tanco Pegmatite that has been mined for Tantalum, Cesium and Spodumene (one of the

primary Lithium ore minerals) in varying capacities, since 1969

at the Tanco Mine

.

NAM’s Lithium

2

Projects are strategically situated in t

his prolific Pegmatite Field.

Presently,

NAM

, under its subsidiary

Lithium Canada Developments,

is one of the largest mineral claim holders in the Winnipeg River

Pegmatite Field

for Lithium.

Azincourt Energy Corp. as our option/joint venture/funding partne

r, is

financed for and has committed to a minimum of $500,000 to be expended on exploration this year

in Manitoba.

A management committee has been formed and plans are being formalized to begin the

exploration process as early as possible in 2018.

As

per

our

agreement

with

Azincourt,

it

has

the

option

to

commit

up

to

$3.85

million

dollars

in

exploration,

issue

up

to

3

million

shares

of

Azincourt

stock

to

NAM,

pay

NAM

up

to

$210,000

in

cash,

and

NAM

will

receive

a

2%

net

smelter

royalty

on

all

5

proj

ects.

Phase

1

of

the

2018

program

is

in

progress,

further

announcements will be

forthcoming.

(see

Jan 1

5

th

2018 Press Release

)

Figure 1: NAM Lithium Projects Manitoba

3

Lithium Prices and Performance

Lithium is in demand in a wide range of sectors worldwide.

Last year, total consumption estimates

are over 170

kt L

ithium

C

arbonate

Equivalent

. (Batteries had the largest share at 32%, followed by

ceramics and glass at 27%.) Prior to 2015, ceramics and glass had the largest demand, but

electric

vehicle sales growth in 2015 resulted in batteries becoming the highest demand sect

or.

While many

commodities struggle for consumption growth

,

L

ithium demand had an estimated growth of 8%

Y

ear

over Year

and has a forecasted 9%

c

ompounded

a

nnual

g

rowth

r

ate

to 2021.

“Demand for battery

-

grade lithium compounds is expected to skyrocket in the next decades in tandem with soaring

demand for electric cars as governments and individual consumers try to reduce their carbon

footprint

(Reuters on Fortune.com).

”

Current

Market Awareness Program

Conferences This Quarter

In early February, our President Trevor Richardson

was in

South Africa attending 3 conferences with a

full schedule, including two 1

-

2

-

1 style conferences with over 25 pre

-

booked meetings with mine

financ

e companies, major mine companies, institutions, stock brokers, and high net worth individuals.

In mid

-

February, Harry Barr (CEO) and Paul Poggione (Corporate Development)

,

had

18 pre

-

booked

meetings at the Capital Event Conference in Whistler to meet new

and existing investors,

stockbrokers and institutions.

In March, the entire New Age Metals team will assemble at the PDAC

in Toronto (

T

he world’s largest mining conventions), and we will also attend two smaller mining

conferences before the PDAC,

RAI$E Cap

ital March 2

nd

where management has approximately 20 1

-

2

-

1 meetings booked and Saturday March 3

rd

management will be attending the Metals

Investor

Forum Conference,

to continue our New Age Metals market awareness program.

In April,

management will be attending a second Capital Event conference in Arizona, which is another 1

-

2

-

1

style conference.

Third Party Social Media

, Radio

and Digital Marketing Campaigns

In late January

,

NAM signed contracts with both

Stockhouse.com

and

Investing News Network

(a

fully owned subsidiary of Dig Media Inc.). We are pleased to be working with these two companies

who are in contact with thousands of investors daily.

In mid

-

February, NAM signed a contract with

Corporate Profile Minute

on the

Larry Kudlow Show

, which is America’

s #1 Wall Street

radio

show,

catering to fund managers, investment advisors, stock brokers, and personal investors.

Opt

-

in List

If you have not done so already, we encourage you to sign up on our website

(

www.newagemetals.com

) to receive our updated news.

4

River Valley PGM Division

,

Sudbury,

Ontario

:

Ground IP Geophysics

Underway

The

current

geophysical

survey

on our River Valley PGM

P

roject

is

a high

-

resolution OreVision® IP

survey performed by Abitibi Geophysics

,

(Thunder Bay, Ontario)

, who completed last year’s survey

o

n our new discovery

,

the

P

ine

Z

one

to

T

-

3

target.

New drill discoveries have been made in

this

region

from

201

5

-

2017.

OreVision IP can reveal targets at four times the depth of conventional IP

without compromising near

-

surface resolution

.

The goal of the geophysical survey is to test the

footwall portion to the main River Valley PGM Deposit, southward of the

Pine Zone

IP

survey

(News

Release:

Jun 19

th

, 2017

)

and

t

o cover the area between target

anomalies

T4 to T9

(Fi

gure 2

)

.

This

area represents a

survey

strike length of approximately 2000 metres.

The geophysics is

now

complete and the final report is expected before the end of March 2018

.

Upon completion of the

present

geophysic

al survey and management having the

opportunity to review the final report

, the

company

will outline

a series of

drill program

s

to test the

new geophysical anomalies generated

from

the

survey (T4

-

T9) and outline additional drilling

to

the north

in

Pine Zone and T3 where only

P

hase 1

Drilling

has been completed to date

.

(see

Feb. 7

th

, 2018 Press Release

)

5

Figure 2

: Drill Hole

Distribution Map in the Northern Portion of the River Valley PGM Deposit Showing

Regions of Upcoming IP Geophysics.

NOTE:

Image only represents approximately 3.5 km of the overall strike

length of the

River Valley PGM

deposit

.

New

Updated

Resource Model

,

NI

43

-

101

WSP Canada (News Release:

Sept 7th, 2017

)

is progressing through t

he new resource calcu

lation for

the River Valley PGM Deposit

under the supervision

of Todd

McCracken, Manager

-

Mining

a

t WSP

Canada

and is slated to be complete before the end of the first quarter of 2018.

The new resource

model and calculation

will incorporate

all

the past data,

geophysics,

new drilling since 2012 and the

River Valley Extensions

(RVE)

.

In 2016, the company

purchased 100% of

Mustang Minerals’ southern

portion of the River Valley

contact

(River Valley Extension, News Release

–

Oct 5

th

, 2016

). This added

4

kilometers

of mineralized strike length to the

southern portion of the

company’s

main

River

Va

lley

P

roject

.

Approximately $5,000,000 was expended on the RVE

by previous operators

, including

extensive drilling

.

This

exploration work will be included

in the

upcoming

River Valley

resource

calculation

.

(see

Feb 7

th

Press Release

)

Mineralog

ical Studies

Expert Process Solutions

(XPS)

,

based in Falconbridge, Ontario

has been engaged to p

er

form

mineralogical studies of the

PGM mineralization

.

XPS

provides world class quantitative mineralogy

for ore body characterization and metallurgical technology services for operational support, growt

h

initiatives and project development

. They

have extensive

experience in many commodities

including

the

Platinum Group Metals

(PGM’s)

.

Management

believes that a better understanding

and characterization of the River Valley PGM mineralization will be a

guide in future endeavors and

development work including improved flowsheet and processing options

in preparation for a

Preliminary Economic Assessment (PEA) Report.

Major companies with

in

the Sudbury

M

ining

C

omplex have extra capacity to treat PGM ores.

N

orth American Palladium, Canada’s only primary

producer of PGMs, ships

all

its concentrates approximately 1,000

km from its Thunder Bay, Ontario

Lac

-

des

-

Iles mine to the Sudbury

M

ining

C

omplex for processing.

River Valley PGM Exploration

Plan

Going Forward

To date an approximate 140,659 meters (461,480 feet) in 628 drill holes have been conducted by the

company

as operator on the River Valley

P

roject

.

Several independent 43

-

101 compliant resource

estimates have previously been generated for t

he deposit through the exploration and development

phases.

The River Valley Deposit’s present resource, with approximately 3.9M PdEq ounces in

Measured Plus Indicated mineral resources and near

-

surface mineralization

,

covers over 1

2

kilometers

of continuous strike length.

The acquisition of the RVE adds an additional 4 kilometers

for a total of 16

kilometers of strike

.

The company continues to explore and enhance the River Valley

PGM Deposit.

River Valley PGM Goals & Objectives

6

During the nex

t year the company’s

exploration & development objectives

are:

1.

Complete ground IP

g

eophysics

(

Q1

2018);

2.

Complete

a new resource calculation

(

slated for

end of Q1 2018);

3.

Continue with drilling

in the northern portion of the project

(slated for Q3

-

Q4 2018

& Q1 2019)

;

4.

Explore more target areas

based on recommendations of the updated 43

-

101 and the

2018

geophysics

(slated for Q3

-

Q4 2018

&

Q1

-

Q2 2019);

5.

Complete mineralogical studies

(Q2 2018); and

6.

Continue

to advance the River Valley PGM Project towards

a

Preliminary Economic Assessment

(

PEA

)

on the River Valley PGM Deposit

.

Figure 3

: The Yellow Band represents the interpolated footwall potential area of the River Valley Deposit

based on the results of the Pine Zone where footwall mineralization was

noted to extend 1

4

0

meters

eastward from the main deposit. At present the only area that has confirmed footwall mineralization is in

the Pine Zone (defined from 2015 to 2017 drilling). Exploration is in progress to test other areas of the

deposit.

Platinum Group Metal Pri

ces & Performance

We are encouraged about the economics surrounding PGMs as we continue to see ongoing deficits

being forecasted in

both Platinum and Palladium

. Most recently the price of Palladium, our primary

7

metal at River Vall

ey, has hit an all

-

time high,

and outpaced all other commodities in 2017 and over

the past 10 years.

Our second most important metal

Platinum,

has come off its bottom

price

in late

2017 and has increased substantially to date.

As a reminder to our sharehol

ders and investors our

River Valley Project also contains:

G

old,

S

ilver,

C

opper,

N

ickel, and

R

hodium, most of which have

experienced

recent price increases.

Recently the World Platinum Investment Council forecasted a deficit in Platinum production for

the

next 5 consecutive years.

Palladium for the 10 years from 2008

-

2017

, has averaged 21.5% per annum

while

G

old averaged

only

5.8% per annum

over that same period.

Both

P

latinum and

P

alladium

,

(

outside of their extensive uses in catalytic converters which convert harmful gasses from

hydrocarbon emissions into less harmful substances in vehicles),

are considered precious metals, like

Gold and are seen as a store of value.

ABOUT NAM’S LITHIUM DIV

ISION

The Company has five pegmatite hosted Lithium Projects in the Winnipeg River Pegmatite Field,

located in SE Manitoba.

Three of the projects are drill ready

. This Pegmatite Field hosts the world

class Tanco Pegmatite that has been mined for Tantalum,

Cesium and Spodumene (one of the primary

Lithium ore minerals) in varying capacities, since 1969. NAM’s Lithium Projects are strategically

situated in this prolific Pegmatite Field.

Presently, NAM is the largest mineral claim holder for

Lithium in the Win

nipeg River Pegmatite Field.

On

January

15

th

2018,

NAM

announced

an

agreement

with

Azincourt

Energy

Corporation

(see

Jan

15,

2018

Press

Release)

whereby

Azincourt

will

commit

up

to

$3.85

million

dollars

in

exploration,

up

to

3

million

shares

of

Azincourt

stock

to

NAM,

up

to

$210,000

in

cash,

and

a

2%

net

smelter

royalty

on

all

5

projects.

Exploration

plans

for

2018

are

currently

in

progress.

A

BOUT NAM’S PGM DIVISION

NAM’s

flagship project is its

100% owned River Valley

PGM Project (

NAM Website

–

River Valley

Project

)

in the Sudbury Mining District of Northern Ontario (100 km east of Sudbury, Ontario).

Presently the River Valley Project is Canada’s largest

undeveloped

primary

PGM deposit with

Measured + Indicated resources of 91 million

tones

@ 0.58 g/t Palladium, 0.22 g/t Platinum, 0.04

g/t Gold,

with a total metal grade of 1.28 g/t

at a cut

-

off grade of 0.8 g/t PdEq for 2,463,000 ounces

PGM plus Gold.

This

equates to 3,942,910 PdEq ounces.

In the Northern portion of the project

(Dana North)

, not including the new high

-

grade Pine Zone, there is 24 million tonnes @ 1.58 PdEq.

The River Valley PGM mineralized zones remain open to expansion.

The company has

recently

completed a

phase one

drill program

on the Pine and

T3

Zones

.

In 2016, the Company acquired the River Valley extension property from Mustang Minerals which

added approximately 4 kilometres to the project

’

s mineralized strike length to the

southern portion

of the intrusion.

8

On February 7

th

2018 NAM

s

management announced an aggressive 2018 exploration and

development program on the River Valley

P

roject, which includes a large geophysical program, the

updated 43

-

101 resource calculation, and

a program to outline drill targets on the company

’

s newly

discovered footwall

mineralization

zone

s

.

(see

Feb. 7

th

, 2018 Press Release

)

QUALIFIED PERSON

The contents contained herein that relate to Exploration Results or Mineral Resources is based on

information compiled, reviewed or prepared by Carey Galeschuk, a consulting geoscientist for New

Age Metals.

Mr. Galeschuk is the Qualified Person as defined by National Instrument 43

-

101 and has

reviewed and approved the technical content of this news release.

On behalf of the Board of Directors

“

Harry Barr”

Harry G. Barr

Chairman and CEO

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Ven

ture

Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward Looking State

ments: This release contains forward

-

looking statements that involve risks and

uncertainties.

These statements may differ materially from actual future events or results and are based on current expectations or

beliefs.

For this purpose, statements of hi

storical fact may be deemed to be forward

-

looking statements.

In addition, forward

-

looking

statements include statements in which the Company uses words such as “continue”, “efforts”, “expect”, “believe”, “anticipate

”,

“confident”, “intend”, “strategy”, “

plan”, “will”, “estimate”, “project”, “goal”, “target”, “prospects”, “optimistic” or similar

expressions.

These statements by their nature involve risks and uncertainties, and actual results may differ materially depending on a

variety of important factor

s, including, among others, the Company’s ability and continuation of efforts to timely and completely make

available adequate current public information, additional or different regulatory and legal requirements and restrictions tha

t may be

imposed, and o

ther factors as may be discussed in the documents filed by the Company on SEDAR (www.sedar.com), including the most

recent reports that identify important risk factors that could cause actual results to differ from those contained in the for

ward

-

looking

st

atements.

The Company does not undertake any obligation to review or confirm analysts’ expectations or estimates or to release

publicly any revisions to any forward

-

looking statements to reflect events or circumstances after the date hereof or to reflect

the

occurrence of unanticipated events.

Investors should not place undue reliance on forw

ard

-

looking statements.