Line cutting is near completion in the footwall region of the River
Valley Deposit
Ground
IP geophysics
on new footwall
discovery will
commence January
20th
to test
the footwall regions of
the T
4 to T9 anomalies
Footwall PGM mineralization is a new and additional source of PGM
s
at the River
Valley
project and
it
will be
included in
the
new
resource model
.
Updated NI 43
-
101 resource calculations with WSP Canada have
commence
d
and will
include all the new data on the deposit and the
recently acquired
southern extension
.
The new resource calculation
is expected to be
completed in Q1
-
2018.
Mineralogical testing is ongoing
River Valley is the Largest Undeveloped Primary PGM resource in Canada,
with
3.9Moz PdEq in Measured
Plus
Indicated
including an additional
1.2Moz PdEq
in
Inferred
and has excellent infrastructure
within
100 kilometers to the Sudbury
Metallurgical complex.
The Price of Pallidum the prominent metal at River Valley is trading at
$
1,078USD
(Jan
10, 2018)
near its
all
-
time
high based on limited supply and increasing demand.
January
1
1
th
, 2018
Vancouver, Canada
–
New Age Metals Inc. (TSX
.
V: NAM; OTCQB: PAWEF;
FSE: P7J.F)
is pleased to
provide an update of exploration activity at the compan
y’s
River Valley
PGM Deposit in Ontario. Field exploration
presently is
concentrated on the upcoming
ground
IP
geophysical survey
.
WSP
Canada
is currently working on the upgraded 43
-
101 compliant
resource
calculation
and mineralogical test of the different PGM grades is ongoing.
The geophysical survey will be a high
-
resolution OreVision® IP survey performed by
Abitibi
Geophysics (Thunder Bay, Ontario).
OreVision IP can reveal targets at four times the depth of
conventional IP without compromising near
-
surface resolution
.
The goal of the geophysical
survey is to test the
footwall portion
to
the main River Valley
PGM Deposit
,
southward of the
Pine Zone
IP survey
(News Release:
Jun 19
th
, 2017
)
and
t
o cover th
e area between target
anomalies
T4 to T9
(Figure 1)
. This area represents a
survey
strike length of approximately
2000 metres.
T
he linecutting and grid is near completion and the IP crews are scheduled to
mobilize on site
for January
20
th
.
Upon completion of the geophysics, the company
will
outline
a series of
drill program
s
to test
the
geophysical
anomalies
generated from the
survey.
The goal is to examine the potential for
continuous PGM mineralization into the footwall area of the main
River Valley PGM Deposit.
WSP Canada (News Release:
Sept 7th, 2017
)
is progressing through t
he new
resource
calculation for the River Valley PGM Deposit
under the supervision
of Todd
McCracken,
2
Manager
-
Mining
a
t WSP Canada
.
The new resource model and calculation
will incorporate
all
the past data,
geophysics,
new drilling since 2012 and the River Valley
Extensions (
previous
Mustang Minerals
ground).
Figure
1
: Drill Hole Distribution Map in the Northern Portion of the River Valley PGM Deposit
Showing
Regions of Upcoming IP Geophysics.
(Image only represents approximately
3
.5 km of the
overall strike length of the deposit)
In 2016, the company obtained the Mustang Minerals’ southern portion of the River Valley
PGM Deposit (River Valley Extension, News Release
–
Oct 5
th
, 2016
). This added 4 kilometres of
mineralized strike length to the company’s River Valley PGM Deposit
.
3
A
BOUT
NAM’S PGM DIVISION
NAM’s
flagship project is its
100% owned River Valley PGM Project (
NAM Website
–
River
Valley Project
)
in the Sudbury Mining District of N
orthern
Ontario (100 km east of S
udbury,
Ontario). Presently the River Valley Project is Canada’s largest primary undeveloped PGM
deposit with Measured + Indicated resources of 91 million tonnes @ 0.58 g/t Palladium, 0.22
g/t Platinum, 0.04 g/t Gold,
with a total metal grade of 1.28 g/t
a
t a cut
-
off grade of 0.8 g/t
PdEq
for
2,463,000 ounces PGM plus Gold.
T
his equates to 3,942,910
PdEq
ounces.
In the
Northern portion of the project
(Dana North)
, not including the new high
-
grade Pine Zone,
there is 24 million tonnes @ 1.58 PdEq.
The River
Valley PGM
-
Copper
-
Nickel Sulphide
mineralized zones remain
s
open to expansion
.
The company has recently completed a drill
program
on the Pine and
T3
Zones.
ABOUT NAM’S LITHIUM DIVISION
The Company has
five
pegmatite hosted
Lithium Projects in the Winnipeg
River Pegmatite Field,
located in SE Manitoba.
Three of the projects are drill ready
Recently NAM announced (News Release:
Dec 12
th
, 2017
) a signed Letter of Intent with
Azincourt Energy Corp for the Manitoba Lithium Projects.
.
This Pegmatite Field hosts the world
class Tanco Pegmatite that has been mined for Tantalum, Cesium and Spodumene (one of the
primary Lithium ore minerals) in varying capacities, since
1969
. NAM’s Lithium Projects are
strategically situated in this prolif
ic Pegmatite Field.
Presently, NAM
,
under its subsidiary
Lithium Canada Developments,
is
one
of
the largest mineral claim holder
s
in the Winnipeg
River Pegmatite Field and is seeking JV partners to further develop the company’s
Lithium
D
ivision.
QUALIFIED
PERSON
The contents contained herein that relate to Exploration Results or Mineral Resources is based
on information compiled, reviewed or prepared by Carey Galeschuk, a consulting geoscientist
for New Age Metals.
Mr. Galeschuk is the Qualified Person as
defined by National Instrument
43
-
101 and has reviewed and approved the technical content of this news release.
On behalf of the Board of Directors
“
Harry Barr”
Harry G. Barr
Chairman and CEO
4
Neither the TSX Venture Exchange nor its Regulation Services
Provider (as that term is defined in the policies of the TSX Venture
Exchange) accepts responsibility for the adequacy or accuracy of this release.
Cautionary Note Regarding Forward Looking Statements: This release contains forward
-
looking statements that
involve risks
and uncertainties.
These statements may differ materially from actual future events or results and are based on current
expectations or beliefs.
For this purpose, statements of historical fact may be deemed to be forward
-
looking statements.
In
addition, forward
-
looking statements include statements in which the Company uses words such as “continue”, “efforts”,
“expect”, “believe”, “anticipate”, “confident”, “intend”, “strategy”, “plan”, “will”, “estimate”, “project”, “goal”, “target”
,
“pros
pects”, “optimistic” or similar expressions.
These statements by their nature involve risks and uncertainties, and actual
results may differ materially depending on a variety of important factors, including, among others, the Company’s ability and
continu
ation of efforts to timely and completely make available adequate current public information, additional or different
regulatory and legal requirements and restrictions that may be imposed, and other factors as may be discussed in the
documents filed by th
e Company on SEDAR (www.sedar.com), including the most recent reports that identify important risk
factors that could cause actual results to differ from those contained in the forward
-
looking statements.
The Company does
not undertake any obligation to r
eview or confirm analysts’ expectations or estimates or to release publicly any revisions to any
forward
-
looking statements to reflect events or circumstances after the date hereof or to reflect the occurrence of
unanticipated events.
Investors should not
place undue reliance on forw
ard
-
looking statements.