Thursday, October 22, 2026
MiningNewsTerminal
Thursday, October 22, 2026 Admin

NAM.V ·

Destiny Gold Project Provides Further High Grade Results from Phase 1, Phase 2 Drilling in Progress

Drill Results Resource Estimates Exploration Programs

Pacific North West    Capital Corp.

For Immediate Release  NEWS RELEASE TSX: PFN OTCBB: PAWEF FSE: P7J.F  Toll Free 1.800.667.1870 www.pfncapital.com

Destiny Gold Project Provides Further High Grade Results from Phase 1,  Phase 2 Drilling in Progress 

  • High grade gold including 16.43 g/t (0.48 oz/ton) and 6.02 g/t (0.17 oz/ton) intersected in 

multiple zones within the DAC Deposit, assays for last 2 holes still pending 

  • Gold‐mineralized wide shear zones include 25.3m at 0.51 g/t gold and 49.5m at 0.36 g/t gold
  • Phase 2 program in progress
  • NI 43‐101 compliant resource calculation indicates potential for expansion
  • Deposit is open along strike and at depth

February  4th  ,  2010    Vancouver,  Canada  –Pacific  North  West  Capital  Corp.  (“the  Company”)  (ʺPFNʺ) (TSX: PFN; OTCBB: PAWEF; Frankfurt: P7J) and Alto Ventures Ltd. (ATV: TSX‐V) are pleased to announce significant results from four diamond drill holes  completed during Phase 1 drilling at the DAC Deposit on the Destiny Gold Project, Québec.  Results include high grade  quartz veins containing up to 16.43 g/t gold over 0.5m (0.48 oz/ton) and  6.02 g/t gold over 1.2m 

(0.17 oz/ton) were intersected.  Quartz veins occur within wide shear‐related alteration systems  which carry gold values of interest including 25.3m averaging 0.51 g/t and 49.5m averaging 0.36  g/t gold (see Table of Significant Gold Assays below). 

The Phase 1 program was completed on December 22nd, 2009 and consisted of 5,600m of drilling in  14  holes.    These  latest  results  and  the  results  from  previous  holes  of  the  Phase  1  drilling program, which include values up to 44.39 g/t gold (1.29 oz/ton) over 0.5m in quartz veins within  wide mineralized shear zones that include 21.0m averaging 1.39 g/t, confirm the large size of the  gold system at the DAC Deposit (see Alto and Pacific North West Capital news releases dated January  15,  2010).  The  results  for  the  remaining  two  holes  from  the  Phase  1  program  will  be released as they become available.  The Phase 2 drilling program started on January 26, 2010. A Phase 3 program is slated for later this year and its size will depend on results obtained from the remaining  holes  from  the  Phase  1  program  and  results  from  Phase  2.    The  objectives  of  these programs are to expand the current NI‐43‐101 resources at the DAC Deposit through infill and step‐out drilling.  The results from the first 12 holes are very positive as they confirm continuity of gold mineralization between holes drilled previously, some of which were spaced from 100m to 200m apart.  The mineralization remains open along strike and at depth.

Table of Significant Gold Assays 

Hole NumberFrom (m)To (m)Width (m) *downholeAu (g/t)
DES09‐128315.0 458.1318.6 458.63.6 0.51.37 2.99
DES09‐129257.7 308.8 407.0266.0 316.3 407.58.3 7.5 0.51.10 0.78 16.43
DES09‐130 Includes299.2 305.5 354.4312.6 306.7 374.213.4 1.2 19.80.7 6.02 0.53
DES09‐13194.6 116.8 131.0119.9 118.9 170.525.3 2.1 49.50.51 2.42 0.36

*Based on core angles and previous drilling, true widths are estimated at approximately 80 to 90% of the  downhole  lengths  reported.    Mineralized zones generally  start at 0.1 g/t gold and assay averages may include minimal intervals of waste material.  No top cuts of assays were used.

Pacific  North  West  Capital  has  funded  this  $600,000  Phase  1  drill  program  and  the  work  was managed by Alto.  The Phase 2 drilling has started and work will continue in February.  Pacific North  West  Capital  will  continue  to  fund  the  exploration  work  and  Alto  will  act  as  program manager.

About the DAC Deposit 

The main area of mineralization on the Destiny Gold Project is the DAC zone, which occurs over a strike length of about 600 m. In this area, four to five identifiable intervals of quartz veining and shear‐related alteration zones carry high grade gold mineralization, with drill intersections up to 

178.5  g/t  gold  over  a  drill  width  of  1.0  metres.    The  DAC  zone  hosts  a  NI  43‐101  compliant  indicated  resource  of  166,863  tonnes  grading  6.88  g/t  gold  (36,892  ounces)  and  an  inferred  resource of 444,753 tonnes grading 4.46 g/t gold (63,839 ounces) calculated by W.A. Hubacheck  Consultants Ltd. in 2007 (see “A Resource Estimate of the DAC Gold Deposit, Despinassy Twp., Val d’Or, Québec” dated January 9, 2007, available on the Alto Ventures website). Drill‐hole cross sections  and  a  3D  model  were  generated  for  the  DAC  Deposit  in  2008  and  are  posted  on www.corebox.net.

The  Destiny  Gold  Project  is  under Option to PFN.  Under the terms of the  Option  Agreement,  PFN  will pay  Alto  $200,000,  provide  Alto with  250,000  common  shares  of PFN,  and  complete  a  total  of $3,500,000  in  exploration expenditures  over  a  four  year period to earn a 60% interest in the Destiny Gold Project. Subsequent to vesting  of  its  interest,  PFN  will form  a  joint  venture  with  Alto  to further develop the project.

Mike  Koziol,  P.  Geo.,  P.Eng.  &  Alto’s  President  and  CEO  is  the  Qualified  Person  who  has reviewed and approved this news release.

Quality Assurance/ Quality Control 

Core processing included descriptive logging and selection of samples for analyses. The NQ‐size cores were sawed in half and one half was delivered to a commercial laboratory.  The samples were delivered to the Accurassay preparation laboratory in Sudbury where they were crushed and a 500 gram pulp was prepared.  The pulp was then shipped to Accurassay Laboratories in Thunder Bay for analyses. The gold assaying method uses a standard Fire Assay with AA finish technique  on  a  30  gram  aliquot  taken  from  a  500  gram  split  from  the  submitted  sample. Commercially prepared standards and blanks were inserted by Alto every 25 samples to ensure precision of the results.  The laboratory performs repeat check assays every 10 samples on pulps to ensure internal lab quality control.

The laboratory was instructed to prepare and analyze a second 500 gram split from the reject for those samples that indicated gold values of between 1 g/t and 5 g/t on the initial analysis. The gold assaying method on the re‐split uses a standard Fire Assay with Gravimetric finish technique on a 30 gram aliquot.  Pulp metallic assays were performed on all samples the returned greater than 5  g/t  gold on the first assay.  The results reported represent mathematical averages of all analyses performed on each specific sample.

Robert  J.  Tremblay  P.  Geo  (Québec),  Consulting  Geologist  to  Alto  Ventures,  is  responsible  for supervision of the diamond drilling program.

About Alto Ventures Ltd: 

Alto  Ventures  Ltd.  is  a  gold  exploration and development company with  a portfolio of highly prospective properties in the Canadian Shield. The Company is currently active in Québec where it  is  focussed on  the  Destiny  Gold  project  in  the  Abitibi  Greenstone  Belt  and  in  Ontario  in  the Beardmore and Shebandowan gold districts.

About Pacific North West Capital Corp: 

Pacific North West Capital Corp. is a mineral exploration company focused on Platinum Group Metals (PGM), precious and base metals. Managementʹs corporate philosophy is to be a Project Generator,  Explorer  and  Project  Operator  with  the  objective  of  option/joint  venturing  projects with major and junior mining companies through to production. To that end, Pacific North West Capitalʹs  current  option/joint  ventures  agreements  are  with  Anglo  Platinum,  First  Nickel,  Alto Ventures and is a major shareholder of Fire River Gold Corp. (www.firerivergold.com)

Pacific North West Capital Corp. is well funded with an experienced management team and the ability to take advantage of the tremendous under funded opportunities that are available in the mining sector today.

Management of Pacific North West Capital plans to use their technical, financing and deal making abilities to acquire additional Platinum Group metals, base metals and precious metals projects on an international scale.  To that end, the company is in the process of adding key technical and 

financial  people  to  our  management  and our advisory team. Pacific North West Capital is a  member  of  the  International  Metals  Group  (www.internationalmetalsgroup.com)  of 

Companies.

Further Information:  Tel: +1.604.685.1870  Fax: +1.604.685.8045 Email:  [email protected], or visit www.pfncapital.com On behalf of the Board of Directors 2303 West 41st Avenue, Vancouver, B.C., Canada, V6M 2A3

The Toronto Stock Exchange has not reviewed and does not accept

Harry Barr 

responsibility for the adequacy or accuracy of this release

President and CEO 

For further information, please contact our Investor Relations Department at Toll Free 1-800-667-1870 Disclaimer: This news release may contain certain "Forward-Looking Statements" within the meaning of Section 21E of the United States Securities Exchange Act of 1934, as amended. All statements, other than statements of historical fact, included herein are forward-looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's expectations are disclosed in the Company's documents filed from time to time with The Toronto Stock Exchange, British Columbia Securities Commission and the United States Securities & Exchange Commission.