Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

MUR.V ·

Murchison Minerals Ltd. News Release February 28, 2019

Corporate Updates

1 | Page 

MURCHISON   MINERALS   LTD.      NEWS   RELEASE     February   28,   2019  

News Release 

MURCHISON ACQUIRES 100% INTEREST OF HPM PROJECT IN QUEBEC 

February 28, 2019 (Toronto, Ontario): Murchison Minerals Ltd. (“ Murchison” or the “Company”) (TSXV: MUR) is pleased to

announce that it now owns 100% of the HPM nickel-copper-cobalt project in Québec (the “Property”) after acquiring the other 50%

interest in the Property previously held by joint venture partner Pure Nickel Inc. (“PNI”). As per the agreement, Murchison ac quired

the entire 50% of PNI’s right, title and interest in and to the Property for $50,000 and 500,000 common shares of the Company. The

transaction is subject the TSX Venture Exchange approval.

About the HPM Project:

The HPM (Haut Plateau du Manicouagan) property consists of 51 claims covering 2,726 hectares.

The Property is underlain in part by the composite Gabbro Est intrusive, which hosts several grass roots nickel-copper-cobalt

showings. Significant historical prospects were found by Falconbr idge Ltd. (“Falconbridge”, now known as Glencore) and include:

Barre de Fer (1.74% Ni, 0.90% Cu and 904ppm Co over 43.18 metr es from the 2008 drill program) and the PYC showing (0.59% Ni

and 0.93% Cu from surface grab samples and 15.3 metres of disse minated to semi-massive sulphides grading 0.28% Ni, 0.14% Cu

and 626 ppm Co from a single hole drilled by Xstrata Nickel in 2000).

The Property is located approximately 290 km north of Baie-Comeau and 180 km north-northwest of Sept-Îles. The property is

accessible by helicopter and is located approximately 20 km east of Route 389, an all-weather road connecting Baie-Comeau to

Fermont to Labrador City.

History

The HPM Property is located on the Haut-Plateau de la Manicouagan Region, within the Allotochtonous Belt of the Grenville

Province. Active exploration for nickel and copper in the Haut-Plateau de la Manicouagan has been ongoing since the late 1970’s.

From 1991 to 1992, Falconbridge completed a helicopter borne EM su rvey over the central part of the area totaling 1,000-line km .

This led to the implementation of reconnaissance mapping and lithogeochemical sampling programs over the entire granulite

complex in order to understand the geological environment of the Manicouagan Complex.

From 1999 to 2002 exploration included UTEM and THEM surveys and 2,903 metres of drilling. Occurrences are mainly associated

with mafic and ultramafic rocks, and anorthositic intrusives that have a wide range of ages and occur in various tectonic setti ngs. In

1999, reconnaissance exploration by Falconbridge led to the discovery of several nickel-copper-cobalt occurrences in the Haut-

Plateau de la Manicouagan including the Barre de Fer prospect as well as the PYC showing.

Most of the nickel-copper-cobalt sulphide showings found to da te on the Property, while displaying some primary magmatic

features/textures, appear to be at least in part structurally controlled or remobilized. Two notable Canadian examples of nicke l-copper

mineralization exhibiting similar characteristics are the Montcalm and Lynn Lake Ni-Cu deposits, which are interpreted to have been

tectonically emplaced into their current locations from a predominantly pyroxenitic host during the late stages of consolidation.

In October 2007, PNI entered into an option agreement with Manicouagan Minerals Inc. (now Murchison Minerals Ltd.) granting the

Company the right to earn up to 70% interest in the properties. In November 2009, the Company completed the required exploratio n

and payments in earned its 50% interest in the Property.

In 2008, the Company completed an exploration program which included an airborne EM and magnetic (AeroTEM II) survey,

follow-up ground HLEM and magnetometer surveys, ground prosp ecting and a 3,388-metre drill program. 17 diamond drill holes

were completed.

2 | Page 

MURCHISON   MINERALS   LTD.      NEWS   RELEASE     February   28,   2019  

Drilling at Barre de Fer was successful in extending the known nickel-copper-cobalt mineralization for approximately 300 metres

along strike and to a depth of about 280 metres. The mineralization remains open at depth and partially along strike. The best

intercept from the 2008 drilling at Barre de Fer was from hole HP M-08-03 which intersected 43.15 metres grading 1.74% Ni, 0.90%

Co and 904 ppm Co.

Limited ground follow-up of priority airborne EM targets lead to the discovery of several new sulphide occurrences (Syrah, Musc at

and Pinot among others). Several other priority airborne EM targets on the HPM claims remain to be followed-up.

The table below summarizes some of the results for the Barre de Fer prospect that have been released to date:

Hole ID From (m) To (m) Length (m)* Ni (%) Cu (%) Co (ppm)

HPM 08 01 78.60 84.07 5.47 2.34 0.97 1237

HPM 08 02 87.79 95.26 7.47 1.59 0.76 885

HPM 08 03 79.82 123.00 43.18 1.74 0.90 904

HPM 08 04 47.73 62.79 15.06 1.72 0.66 888

HPM 08 05 209.80 229.45 19.65 0.46 0.17 216

HPM 08 08 104.96 106.12 1.16 1.71 0.25 965

HPM 08 09 147.46 149.40 1.94 2.07 0.84 1084

HPM 08 10 121.39 123.46 2.07 0.63 0.08 341

HPM 08 11 47.27 48.78 1.51 2.20 0.77 1133

HPM 08 15 35.30 39.20 3.90 0.54 0.15 333

HPM 08 17 61.40 68.60 7.20 1.44 0.69 736

* True widths unknown

Note: Glencore retains certain rights with respect to the mining claims including (i) a 2% NSR on each property (the Company ha s

the right to reacquire 1% thereof for C$1,000,000); (ii) off-tak e and marketing rights for all concentrate or product produced from the

properties; and (iii) a onetime back-in right to 50% for any mi ning project with an economic threshold of 15,000,000 tonnes of

resources unless such right has been previously exercised in resp ect of another property that was part of the Xstrata - Pure Ni ckel

original transaction.

The technical disclosure contained in the press release was read and approved by Francois Bissonnette, P.Geo.

About Murchison Minerals Ltd.

Murchison Minerals Ltd. is a Canadian based exploration company focused on the exploration and development of the 100% owned

Brabant-McKenzie zinc-copper-silver project in north-central Saskatchewan. The Company also has a 100% interest in the HPM

nickel/copper/cobalt project in Quebec. Murchison has 44.7 million shares issued and outstanding following this transaction.

Additional information about Murchison and its exploration projects can be found on the Company’s website at

www.murchisonminerals.com. For further information, please contact:

Jean-Charles Potvin, President and CEO

[email protected]

(416) 350 - 3776

Forward‐Looking Information

Certain  information  set  forth  in  this  news  release  may  contain  forward‐looking  information  that  involves  substantial  known  and 

unknown risks and uncertainties. This forward‐looking information is subject to numerous risks and uncertainties, certain of which 

are beyond the control of the Company, including, but not limited to, the impact of general economic conditions, industry conditions, 

and  dependence  upon  regulatory  approvals.  Readers  are  cautioned  that  the  assumptions  used  in  the  preparation  of  such 

information,  although  considered  reasonable  at  the  time  of  preparation,  may  prove  to  be  imprecise  and,  as  such,  undue  reliance 

should not be placed on forward‐looking information. The parties undertake no obligation to update forward‐looking information 

except as otherwise may be required by applicable securities law. 

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) 

accepts responsibility for the adequacy or accuracy of this release.