Murchison Minerals Concludes Winter Diamond Drill Program, Expands VMS Mineralization (Copper-Zinc-Silver-Lead-Gold) at BMK Deposit

Drill Results

News Release

Murchison Minerals Concludes Winter Diamond Drill Program,

Expands VMS Mineralization (Copper-Zinc-Silver-Lead-Gold) at

BMK Deposit

• The 2024 Winter Diamond Drill Program successfully expanded VMS mineralization at

the BMK Deposit, demonstrating the Deposit remains open and highly prospective for

further expansion and discovery of an associated copper stockwork zone

• The Program comprised four diamond drill holes totaling 2,712 metres

• Four target areas, designed as a first pass across BMK Deposit and proximal anomalies

were tested:

o BMK Extension (three targets): one hole each at BMK North and South designed

to test along strike from the BMK Deposit, and one hole at BMK Deep which tested

below the known extents of the BMK Deposit

o CST, a HeliSAM target, which lies 400 m along strike to the southwest of the BMK

Deposit

• BMK North and South Extension Targets - drilling expanded the footprint of

mineralization along strike from BMK, highlighted by:

o BMK24-002 intersected mineralization 100 m to the northwest of the Deposit ’s

current footprint, intersecting grades up to 1.96% copper, with a higher copper to

zinc ratio indicative of copper stockwork mineralization.

• BMK Deep Extension Target – drilling successfully intersected mineralization at depth

below the known extents of the BMK Deposit, highlighted by:

o BMK24-003 intersecting 2.78 m of 1.04% CuEq. 110 m below the known extents

of the BMK Deposit.

• CST Target – drilling intersected strong VMS alteration, which was later correlated to an

off-hole geophysical anomaly identified during a Bore hole EM (BHEM) Survey. The

2 | P a g e

MURCHISON MINERALS LTD. NEWS RELEASE

alteration associated with the anomaly indicates the CST area remains prospective.

Additionally, drilling intersected high-grade rare earth elements (REEs), highlighted by:

o CST24-001 which intersected 7.76% TREO over 0.5 metre, this is the first drill

hole on the BMK Project to intersect high -grade REE s and the Company will

undertake a review of historic drill holes for possible resampling.

April 29th, 2024 (Burlington, Ontario): Murchison Minerals Ltd. (“Murchison” or the “Company”)

(TSXV: MUR | OTCQB: MURMF) is pleased to announce that it has concluded the 2024 Winter

Exploration Program (the “Program”) at its 100%-owned Cu-Zn-Ag-Pb-Au Volcanogenic Massive

Sulphide (VMS) BMK Project in Saskatchewan. The Program was designed to provide a first pass

reconnaissance for the discovery of a potential copper stockwork zone associated with the

formation of the BMK Deposit . In total, 2,712 m were completed, comprising four diamond drill

holes, which tested four high-priority target areas (one hole at each target area) . Three target

areas: BMK Deep, North and South followed up on previous drilling at the BMK Deposit , where

high-grade copper has been intersected . The four th target, CST , tested a geophysical anomaly

400 m along strike to the southwest of the BMK Deposit. The three drill holes at the BMK

Extension Targets successfully expanded the footprint of VMS mineralization at the BMK Deposit,

demonstrating that the Deposit remains open and prospective for further expansion and

discovery of an associated copper stockwork zone. Significantly, at BMK North, drill hole BMK24-

003 intersected a zone of VMS mineralisation with a high copper to zinc ratio. Similar high copper

to zinc ratios have been intersected during previous drill campaigns which targeted the northern

extent of the BMK Deposit. The Company is encouraged by these intersections, indicating the

potential for a nearby copper stockwork zone proximal to the northern extent of the BMK Deposit.

At the CST Target area, drilling intersected a significant interval of VMS type alteration which

correlates with an off-hole borehole electromagnetic conductor, indicating the drill hole may have

narrowly missed a zone of VMS mineralization. The 2024 Program demonstrates the BMK

Deposit remains open for further expansion of VMS mineralization. Additionally, the results from

this first pass testing are encouraging for the discovery of an associated copper stockwork zone

during future drill campaigns.

3 | P a g e

MURCHISON MINERALS LTD. NEWS RELEASE

Figure 1: Plan Map View of BMK Deposit and CST target with 2024 drill holes highlighted.

4 | P a g e

MURCHISON MINERALS LTD. NEWS RELEASE

Figure 2- Long Section View of BMK Deposit.

Table 1: 2024 BMK Program Highlight Results

Hole ID From (m) To (m) Interval (m) Cu (%) Zn (%) Pb (%) Au (g/t) Ag (g/t) Cu Eq. (%) Zn Eq. (%)

BMK24-001 459.2 459.82 0.62 0.10 1.07 0.03 0.04 3.90 0.48 1.69

BMK24-002 394.6 397.7 3.1 0.65 0.35 0.03 0.07 8.63 0.89 3.12

Includes 394.6 395.1 0.5 1.96 1.00 0.01 0.04 23.53 2.48 8.68

BMK24-003 724.22 727 2.78 0.33 1.97 0.05 0.09 7.75 1.04 3.62

Includes 724.71 726.13 1.42 0.54 3.11 0.07 0.03 11.73 1.57 5.51

BMK24-003 732 733 1 0.03 0.03 0.61 0.19 15.08 0.45 1.56

BMK24-003 748.85 749.42 0.57 0.08 1.85 0.43 0.01 18.14 0.87 3.04

* Reported as core length, intervals 90 to 100% true thickness. **Copper Equivalent (Cu Eq.) & Zinc Equivalent (Zn

Eq.) values were calculated using the following USD metal prices from April 21, 2024: $4.4883/lb Copper, $1.2828/lb

Zinc, $0.9825/lb Lead, $2330.46/Oz Gold, and $27.208/Oz Silver. The following recovery factors were applied to the

equivalent values based on preliminary metallurgical work completed in 2021 factoring in optimization: 95% Zn, 85%

5 | P a g e

MURCHISON MINERALS LTD. NEWS RELEASE

Cu, 80% Pb, 65% Au, 60% Ag. Please note that copper equivalent is in substitution for zinc equivalent and not in

addition to.

Table 2: 2024 CST Rare Earth Element Highlight Result

Hole ID From

(m)

To

(m)

Length

(m) *

Ce2O3

(%)

Dy2O3

(%)

Gd2O3

(%)

La2O3

(%)

Nd2O3

(%)

Pr2O3

(%)

Sm2O3

(%)

Tb2O3

(%)

Y2O3

(%)

TREO

(%)**

CST24-

001 581.5 581.96 0.5 3.55 0.03 0.14 1.68 1.56 0.46 0.25 0.01 0.08 7.76

*Reported as core length, true thickness unknown. **TREO calculated as Ce2O3 (%) + Dy2O3 (%) + Gd2O3 (%) + La2O3

(%) + Nd2O3 (%) + Pr2O3 (%) + Sm2O3 (%) + Tb2O3 (%) + Y2O3 (%) = TREO (%).

Table 3: Drillhole Information

Hole Easting

UTM*

Northing

UTM*

Elevation

(m)

Azimuth

(°)

Dip

(°)

Length

(m)

BMK24-001 580256 6220839 374 120 -67 546

BMK24-002 580727 6221513 393 122 -70 497

BMK24-003 580339 6221490 393 120 -70 827

CST24-001 579598 6220327 366 115 -63 842

*UTM Projected Coordinate System NAD83 UTM Zone 13N

2024 Winter Drilling:

• CST24-001 was drilled to test the CST geophysical target 400 m south west of the BMK

Deposit. Due to ground conditions, the drill hole shallowed out, deviating significantly from

the targeted pierce point intersecting the geophysical anomaly approximately 150 m from

its center. A significant zone (over 6 m in length) of garnet-anthophyllite-cordierite-biotite

gneiss consistent with alteration observed at the BMK Deposit was intersected at 410 m

depth. A subsequent borehole electromagnetic survey was completed on the hole and

indicates an off -hole conductive anomaly appears to be associated with the alteration.

Multiple graphitic conductors were intersected at depth s of 438 m , 463 m and 733 m

which partially explain the HeliSAM geophysical response. Additionally, a 0.5 metre spot

sample was submitted for REEs analysis associated with a pegmatite (Figure 3) which

returned very significant grades of REEs yielding 7.76% TREO (Table 2). The Company

considers the presence of such high-grade REEs encouraging and will complete a property

wide review of previous drill, grab and outcrop samples for additional occurrences.

• BMK24-001 was drilled to test the BMK South Extension, the hole intersecte d a narrow

interval of mineralization (Table 1) confirming the presence of VMS mineralization south

of the Deposit.

• BMK24-002 was drilled to test the BMK North Extension, the hole successfully intersected

mineralization 100 m to the northwest of BMK’s current footprint, intersecting grades of

up to 1.96% copper with mineralization having a high copper to zinc ratio which is

indicative of copper stockwork mineralization. These results are considered encouraging,

and the Company will focus additional exploration to the north of the Deposit.

6 | P a g e

MURCHISON MINERALS LTD. NEWS RELEASE

• BMK24-003 was drilled to test the extent of the BMK Deposit and the potential for a

copper stockwork zone. The hole successfully intersected mineralization 110 m down-dip

from the current footprint of the BMK Deposit (Table 1).

Figure 3 – CST drill core displaying close up of high-grade rare earth element mineralization.

Murchison Minerals’ Vice-President of Exploration comments:

“While w e did not intersect the primary anomaly at CST , the presence of strong VMS alteration

similar to what we observe at BMK is encouraging and the association with an off-hole conductor

suggests a near miss . We are also excited by the continued presence of high copper ratio

mineralization north of the BMK Deposit and it suggests we are continuing to vector into the copper

stockwork. Immediately north of the Deposit has seen very limited historic exploration as the area

was previously unavailable for staking, those limitations are now removed so we plan to focus our

exploration in this area.”

Rare Earth Element

Mineralization

7 | P a g e

MURCHISON MINERALS LTD. NEWS RELEASE

QA/QC 

Murchison has implemented and is adhering to a strict Quality Assurance/Quality Control

program. NQ-size core was drilled, and mineralized intervals were marked by geologists during

core description. The marked intervals were sampled using a core saw, one -half is kept as a

witness sample at core facility in Brabant Lake, Saskatchewan and the other assigned a unique

number and placed within a plastic bag. The specific gravity of every sample was measured using

the mass -in-air / mass -in-water method. Samples were shipped directly to SRC Geoanalytical

Labs in Saskatoon, Saskatchewan. The samples were ground and prepared for analysis by the

lab using total digestion. Analyzes were performed using ICP-OES for copper, zinc, lead and silver.

Gold was analyzed by fire assay. Every 25th sample sent to the lab was a field duplicate (quarter

core), blanks and certified reference material were also submitted approximately every 25th

sample. 

Qualifying Statement

The foregoing scientific and technical disclosures on the BMK Project have been reviewed by

John Shmyr, P.Geo., VP Exploration, a registered member of the Professional Engineers and

Geoscientists of Saskatchewan. Mr. Shmyr is a Qualified Person as defined by National

Instrument 43-101. The Qualified Person has verified the data disclosed in this release, including

sampling, analytical and test data underlying the information contained in this release. Mr. Shmyr

consents to the inclusion in the announcement of the matters based on his information in the

form and context in which it appears.

Some data disclosed in this News Release relating to sampling and drilling results is historical in

nature. Neither the Company nor a qualified person has yet verified this data and therefore

investors should not place undue reliance on such data. In some cases, the data may be

unverifiable due to lack of drill core. Mineralization hosted on adjacent and/or nearby and/or

geologically similar properties is not necessarily indicative of mineralization hosted on the

Company's properties.

About the BMK Project

The B MK Project is located 175 kilometres northeast of La Ronge, Saskatchewan and

approximately three kilometres from the community of Brabant Lake. The area is accessed year-

round via provincial Highway 102 and is serviced by grid power. The Project hosts the BMK VMS

Deposit, and the mineral claims total 6 64 square kilometres, that cover approximately 37

kilometres of strike length o f the favourable BMK trend. The Project contains multiple known

mineralized showings such as the Main Lake and Betty Showings and with many identified

geophysical conductors that have yet to be drill tested.

8 | P a g e

MURCHISON MINERALS LTD. NEWS RELEASE

Figure 3: Location map of BMK Project.

Mineral Resource Summary for BMK VMS Deposit

2018 BMK Deposit Resource

Domain Tonnes

Contained Grade Contained Metal

Cu

(%) Zn (%) Ag

(g/t) Pb (%) Au

(g/t) Cu Eq. (%)

Zn Eq.

(%)

Cu

(000

lbs)

Zn

(000

lbs)

INDICATED MINERAL RESOURCE

Lower Zone 1,200,000 0.75 8.13 48.00 0.67 0.28 5.56 11.53 19,842 215,083

Upper Zone 900,000 0.60 5.70 28.52 0.24 0.17 3.82 7.93 11,905 113,097

Total Indicated 2,100,000 0.69 7.08 39.60 0.49 0.23 4.82 9.98 31,945 327,783

INFERRED MINERAL RESOURCE

Lower Zone 2,700,000 0.55 4.88 29.02 0.42 0.14 3.43 7.14 32,739 290,481

Upper Zone 4,900,000 0.57 4.22 12.46 0.06 0.08 2.79 5.81 61,575 455,871

Total Inferred 7,600,000 0.57 4.46 18.42 0.19 0.10 3.03 6.29 95,504 747,278