Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

MUR.V ·

Murchison Minerals Announces Common Shares Begin Trading on the OTCQB

Listings & Exchange

News Release

Murchison Minerals Announces Common Shares Begin Trading

on the OTCQB

February 14, 2022 (Burlington, Ontario): Murchison Minerals Ltd. (“Murchison” or the

“Company”) (TSXV: MUR) (OTCQB: MURMF) is pleased to announce its common shares will

commence trading on the OTCQB as of market open today, under the symbol “ MURMF”.

Additionally, the Company is in the final stages of having DTC Eligibility – this process is expected

to be completed in the coming weeks. The Company's common shares will continue to also be

traded on the TSX Venture Exchange (TSXV) under the symbol "MUR".

The OTCQB Venture Market (" OTCQB") by the OTC Markets Group Inc. ("OTC Markets ") is a

premier and established marketplace for entrepreneurial and development-stage companies. The

OTCQB is recognized by the United States Securities and Exchange Commission as an

established public market providing public information for analysis and value of securities. The

OTCQB offers companies the opportunity to build their visibility, expand their liquidity and

diversify their shareholder base on an established public market. Investors can find current

financial disclosure and Real- Time Level 2 quote s for the Company on

https://www.otcmarkets.com/stock/MURMF/overview .

President and CEO, Troy Boisjoli, comments:

“Today is a major milestone for the Company, with Murchison Minerals join ing the OTCQB, this

will provide an enhanced market for US residents to trade Murchison’s common shares. The

OTCQB provides increased transparency, reporting standards, management certification and

compliance requirements that align with Murchison’s values. We recognize the demand in the US

for greater exposure to grassroots exploration projects focused on the battery and energy metals

space. Our intention with the Company joining the OTCQB is to drive greater liquidity and

awareness about Murchison.”

About the HPM Project

The HPM Project is located east of the Manicouagan structure, the site of a major 215 Ma impact

event. The extensive reservoir at Manicouagan supports five hydro -power plants. The existing

Quebec Cartier rail line, located eight kilometres west of the PYC project area, links Labrador City

to Port Cartier and Sept Iles, two major iron ore port facilities.

2 | Page

MURCHISON MINERALS LTD. NEWS RELEASE

Figure 1: HPM Location Map

The HPM Project is located within the Haut- Plateau de la Manicouagan area. The claims host

prospective gabbroic, ultramafic and anorthositic bodies within the Manicouagan metamorphic

complex and are associated with significant nickel -copper-cobalt sulphide mineralization first

identified by Falconbridge in 1999, and discovered extensive nickel-bearing sulphide

mineralization at Barre de Fer during drilling in 2001 - 2002. Murchison Minerals Ltd.’s

predecessor – Manicouagan Minerals – drilled in the area in 2008 and 2009. Most of the past

drilling at the HPM Project targeted the Barre de Fer geophysical conductor and confirmed the

presence of nickel -copper-cobalt sulphide mineralization over approximately 300-metres strike

length to a depth of 280 metres. The mineralization remains open at depth and partially along

strike.

After Murchison Minerals Ltd. acquired 100% ownership of the property in 2019, the Company

focused exploration work on the camp-scale potential of the region. Aerial EM surveys completed

in the spring of 2021 identified more than 50 anomalous conductors. Prospecting crews were

3 | Page

MURCHISON MINERALS LTD. NEWS RELEASE

able to traverse five ( 5) of the more than 50 anomalies, and discovered new outcrops of nickel -

bearing sulphide mineralization in the process. The prospecting program was followed by an

inaugural drill program at the PYC Target area – an EM anomaly with a 1. 95-km strike length.

Assay results are expected in Q1 2022. Subsequent to the completion of the drill program at PYC,

the Company increased its dominant land position in the Haut -Plateau region from 139 km 2 to

576 km2.

Qualifying Statement

The foregoing scientific and technic al disclosures on the HPM Project have been reviewed by

John Shmyr, P.Geo., VP Exploration, a registered member of the Professional Engineers and

Geoscientists of Saskatchewan and current holder of a special authorization with the Ordre des

Géologues du Québec. Mr. Shmyr is a Qualified Person as defined by National Instrument 43-101.

About Murchison Minerals Ltd. (TSXV: MUR or OTCQB: MURMF)

Murchison is a Canadian ‐based exploration company focused on nickel -copper-cobalt

exploration at the 100%-owned HPM Project in Quebec and the exploration and development of

the 100% -owned Brabant Lake zinc ‐copper‐silver project in north ‐central Saskatchewan. The

Company also holds an option to earn 100% interest in the Barraute VMS exploration project also

located in Quebec, north of Val d’Or. Murchison currently has 160.1 million shares issued and

outstanding.

Additional information about Murchison and its exploration projects can be found on the

Company’s website at www.murchisonminerals.com. For further information, please contact:

Troy Boisjoli, President and CEO or

Erik H Martin, CFO

Tel: (416) 350‐3776

Email: [email protected]

CHF Capital Markets

Thomas Do, IR Manager

Tel: (416) 868-1079 x 232

Email: [email protected]

Forward‐Looking Information

Certain information set forth in this news release may contain forward‐looking information that involves substantial known and unknown risks and uncertainties.

This forward‐looking information is subject to numerous risks and uncertainties, certain of which are beyond the control of t he Company, including, but not limited

to, the impact of general economic conditions, industry conditions, and dependence upon regulatory approvals. Readers are cautioned that the assumptions used in

the preparation of such information, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not

be placed on forward‐looking information. The parties undertake no obligation to update forward‐looking information except as otherwise may be required by

applicable securities law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the

adequacy or accuracy of this release.