Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

MUR.V ·

Murchison Intersects Best Hole to Date on HPM Property 121.2 metre Interval with a pXRF Estimate of 1.39% Ni Eq (or 4.14% Cu Eq)– including 21.0 metre at 3.43% Ni Eq (or 10.25% Cu Eq)

Drill Results

News Release

Murchison Intersects Best Hole to Date on HPM Property 121.2

metre Interval with a pXRF Estimate of 1.39% Ni Eq (or 4.14% Cu

Eq)– including 21.0 metre at 3.43% Ni Eq (or 10.25% Cu Eq)

September 14th, 2022 (Burlington, Ontario): Murchison Minerals Ltd. (“Murchison” or the

“Company”) (TSXV: MUR | OTCQB: MURMF ) is pleased to announce results analysed using

portable x-ray fluorescence (pXRF) from the second diamond drillhole, at the Barre de Fer (“BDF”)

zone, as part of the 2022 Summer Exploration Program on the 100% - owned HPM (Haut-Plateau

de la Manicouagan) Project, located in Quebec.

It should be noted that pXRF results provide only an indication of the amount of Ni, Cu, and Co

present, Certified assaying of the core samples is still r equired to accurately determine the

amount of mineralization (Nickel- Copper-Cobalt). The Company has implemented rigorous

QA/QC procedures utilizing a direct rock sampler (Figure 9) to produce reasonably representative

preliminary results (see pXRF Sample Procedures and QA/QC below).

BDF22-002 Highlights

• The hole was drilled to a depth of 452 m and intersected two broad zones of Ni-Cu-Co

sulphide bearing mineralization totalling 1 75.15 m of composite thickness (Table 1)

including:

o 121.20 m estimated at 1.39% pXRF Ni Eq. (123.80 to 245.0 m)

 Including 10.10 m at 2.75% pXRF Ni Eq. (134.1 to 144.20 m)

 Including 44.00 m at 2.18% pXRF Ni Eq. (152.00 to 196.00 m)

 Including 28.80 m at 3.03% pXRF Ni Eq. (152.00 to 180.80 m)

 Including 21.00 m at 3.43% pXRF Ni Eq. (152.5 to 173.5 m)

 Including 3.75 m at 3.43% pXRF Ni Eq. (177.05 to 180.8 m)

 Including 10.50 m at 1.97% pXRF Ni Eq. (207.5 to 218.0 m)

o 53.95 m disseminated sulphide zone estimated at 0.25% pXRF Ni Eq. (303.55 to

357.50 m)

• Best intersection drilled to date on the HPM Property

• The hole successfully confirmed mineralization downdip from DH -151-02, exceeding

expectations. The hole also confirmed mineralization up dip of DH-151-05EX.

• The majority of the mineralization is outside of the previously modelled zone (Figure 7)

2 | Page

MURCHISON MINERALS LTD. NEWS RELEASE

Figure 1: Massive sulphide mineralization in BDF22-002 at 152.00 m to 161.00 m.

Murchison Minerals President and CEO Troy Boisjoli comments:

“The objective of the 2022 drill program was to expand near-surface high-grade nickel, copper, cobalt

mineralization at the Barre de Fer Zone and the holes to date are delivering on that objective. The

pXRF results from BDF22 -002 have exceeded our expectat ions in terms of estimated grade and

thickness - 121.20 m estimated at 1.41% pXRF Ni Eq (or 4.14 % Cu Eq) is a very significant nickel

bearing magmatic sulphide intersection and I congratulate Murchison’s technical team. The 2022

drilling results will enable to Company to materially advance the Ni -Cu-Co HPM Project, at a time

when the world is desperate for future supply of critical minerals.”

Murchison Minerals Vice-President of Exploration John Shmyr comments:

“The results from BDF22-002 are exceptional and further indicate the size and scale of the sulphide

mineralizing system that is present at B DF. Our geologic understanding has grown significantly

throughout the drill campaign. Our work further confirms BDF as magmatic chonolith type system

and other chonolith type deposits like Voisey’s Bay are composed of multiple zones, which has the

technical team excited about the exploration potential.”

Table 1: BDF22-002 pXRF Results

Hole   From

(m)

To

(m)

Length*

(m)

pXRF

Ni %

pXRF

Cu %

pXRF

Co %

pXRF Ni

Eq. %**

pXRF Cu

Eq. %**

3 | Page

MURCHISON MINERALS LTD. NEWS RELEASE

BDF22-002

123.8 245 121.20 1.08 0.59 0.05 1.39 4.14

Includes 134.1 144.2 10.10 2.19 1.02 0.10 2.75 8.22

Includes 152 196 44.00 1.72 0.84 0.08 2.18 6.51

Including 152 180.8 28.80 2.39 1.18 0.11 3.03 9.05

Including 152.5 173.5 21.00 2.67 1.48 0.12 3.43 10.25

Including 177.05 180.8 3.75 2.95 0.56 0.14 3.43 10.24

Includes 207.5 218 10.50 1.45 1.05 0.08 1.97 5.89

303.55 357.5 53.95 0.20 0.13 0.00 0.25 0.74

* Reported as core length, true thickness is not known. **Nickel Equivalent (Ni Eq) & Copper Equivalent (Cu Eq) values

were calculated using the following USD metal prices from Sept 12, 2022: $10.84/lb Nickel, $3.63/lb Copper, and

$23.56/lb Cobalt. Ni Eq.% was calculated using Ni%+((Cu Price/Ni Price) *Cu %)+((Co Price/Ni Price) *Co %). Cu Eq.%

was calculated using Cu%+((Ni Price/Cu Price)* Ni %)+((Co Price/Cu Price)*Co %).

Table 2: Drill Hole Information

Hole Easting Northing Elevation

(m) Depth (m) Azimuth (°) Dip (°)

BDF22-002

614991

5722902

891

452

233

-57

BDF22-002 Mineralization

The mineralization observed in BDF22 -002 occurs within two separate zones. The upper zone

comprises multi-metre intervals of massive and breccia sul phide within zones of stringer and

disseminated sulphide mineralization hosted in peridotite and norite (Figure 3 & 5).

The lower zone of mineralization (303.55 m to 357.50 m) comprises primarily disseminated

sulphide, over a broad 53.95m wide zone hosted within an olivine gabbronorite.

The sulphide mineralization consists of pyrrhotite with granular pentlandite and chalcopyrite

loops with pentlandite. The massive sulphide mineralization is predominantly hosted in a dark,

moderately serpentinized peridotite and lesser olivine gabbronorites and a dark, fine grained

norite. The primary magmatic sul phide mineral textures coupled with t he development of

disseminated sulphide mineralization and magmatic breccias indicate that the mineralization is

similar to chonolith style deposits like Voisey’s Bay. Work progresses to define the stratigraphic

controls of the intrusive rocks on the distribution of massive, breccia, and disseminated sulphide

types; these controls will guide future exploration in the extension and discovery of additional

mineral zone along strike and at depth.

4 | Page

MURCHISON MINERALS LTD. NEWS RELEASE

l

Figure 2: Close-up of Massive and semi-massive sulphide mineralization in BDF22-002.

5 | Page

MURCHISON MINERALS LTD. NEWS RELEASE

Figure 3: Massive sulphide mineralization in BDF22-002 at 135.70 m to 180.80 m.

6 | Page

MURCHISON MINERALS LTD. NEWS RELEASE

Figure 4: Zoom in on Massive Sulphide in BDF22-002 displaying observable pentlandite (nickel

sulphide) and chalcopyrite (copper sulphide) with pyrrhotite (iron sulphide) mineralization.

7 | Page

MURCHISON MINERALS LTD. NEWS RELEASE

Figure 5: Massive, semi-massive, stringer to disseminated mineralization observed in BDF22-002

at 204.00 m to 234.00 m.

2022 Summer Diamond Drilling

During the 2022 summer exploration program, a total of 13 diamond drill holes were completed,

comprising 4,316 metres. This includes ten drillholes at BDF, and an additional three holes at

Syrah. The drill core is currently undergoing processing and pXRF results are being determined.

Results will be released as soon as the data has been verified. The previously released pXRF

results from BDF22 -001 (See September 8th Release and Table 3) demonstrated significant

expansion below the current modeled mineral zones. These results paired with the results from

BDF22-002, highlights significantly potential for expansion of the BDF mineral zone and the

Company considers these results exceptional.

The Company is progressing towards establishing a maiden resource on BDF by early Q1 of 2023.

Observations made on the drill core including the proportions of sulphide to gangue, the

mineralogy of the sulphides, and their textural relationships when coupled with the results from

the pXRF have allowed Murchison to prioritize exploration and report new results in a timely way.

Samples from BDF22-002 have been sent to the Saskatchewan Research Council’s Geoanalytical

Laboratory for commercial certified assaying and the Company is awaiting the results.

Table 3: 2022 Drill Campaign pXRF Results to date

Hole   From

(m)

To

(m)

Length*

(m)

pXRF

Ni %

pXRF

Cu %

pXRF

Co %

pXRF

Ni Eq.

%**

pXRF

Cu Eq.

%**

BDF22-001

89.95 108 18.05 1.58 0.56 0.08 1.94 5.79

Includes 96.5 108 11.5 2.13 0.64 0.1 2.56 7.65

Includes 97.8 105.9 8.1 2.82 0.78 0.13 3.36 10.04

122 132.85 10.85 0.29 0.24 0.02 0.41 1.24

180.5 189 8.5 0.63 0.3 0.03 0.80 2.37

196.5 219.2 22.7 0.2 0.1 0 0.23 0.70

267 336.9 69.9 0.5 0.24 0.04 0.67 1.99

Includes 283.4 299.5 16.1 1.03 0.48 0.08 1.36 4.07

BDF22-002

123.8 245 121.2 1.08 0.59 0.05 1.39 4.14

Includes 134.1 144.2 10.1 2.19 1.02 0.10 2.75 8.22

Includes 152 196 44 1.72 0.84 0.08 2.18 6.51

Including 152 180.8 28.8 2.39 1.18 0.11 3.03 9.05

Including 152.5 173.5 21 2.67 1.48 0.12 3.43 10.25

Including 177.05 180.8 3.75 2.95 0.56 0.14 3.43 10.24

Includes 207.5 218 10.5 1.45 1.05 0.08 1.97 5.89

303.55 357.50 53.95 0.20 0.13 0.00 0.25 0.74

8 | Page

MURCHISON MINERALS LTD. NEWS RELEASE

* Reported as core length, true thickness is not known. **Nickel Equivalent (Ni Eq) & Copper Equivalent (Cu Eq) values

were calculated using the following USD metal prices from Sept 12, 2022: $10.84/lb Nickel, $3.63/lb Copper, and

$23.56/lb Cobalt.

Figure 6: Location map of Barre de Fer, showing drill hole BDF22-002 & BDF22-001