Mundoro Provides Exploration Program FOR 2018 IN Serbia
MUNDORO PROVIDES EXPLORATION PROGRAM FOR 2018 IN SERBIA
April 16, 2018, Vancouver, BC - Mundoro Capital Inc. (TSXV: MUN, www.mundoro.com ) (" Mundoro "
or the " Company ") is pleased to provide the explora on work program for 2018 in Serbia for the four
licenses being sole funded under the Op on Agreement between Mundoro and Japan Oil, Gas and
Metals Na onal Corpora on (" JOGMEC ") at the Timok mining camp in eastern Serbia (see Figure 1:
Location Map JOGMEC optioned Licenses) .
JOGMEC has no fied Mundoro that it has budgeted an addi onal US$1.5 million (~C$1.89 million) for
the Explora on Work Program for Year 3 of the Phase 1 Earn-in Op on commencing April 2018 to March
2019. The Year 3 Explora on Work Program will include:
● Borsko license (see Figure 2: Target Map for Borsko) :
○ Follow up drill program to the 2017 drilling;
○ Geophysics that will include a gravity survey and a deep IP survey to further refine the
targe ng at Borsko; and
○ Further structural analysis with the new data to update on ini al structural analysis from
2017.
● Zeleznik license (see Figure 3: Target Map for Zeleznik) :
○ Interpreta on of the ground magne cs survey which now covers the en re 55 sqkm of
the Zeleznik license;
○ Soil sampling program to cover the remaining 25 sqkm of the license which will result in
a soil sampling survey over the en re 55 sqkm: and
○ Drill program to test key targets.
● Padina license (see Figure 4: Target Map for Padina) :
○ Interpreta on of several geophysics surveys and structural interpreta on has iden fied
four targets one of which will be drill tested by May 2018.
Teo Dechev, CEO & President commented: “We are very pleased to con nue our partnership with
JOGMEC for Year 3 of Phase 1 of the Earn-in for the Timok North Projects. The joint venture with
JOGMEC has successfully drill tested two porphyry systems in the southern por on of the Zeleznik
license and in the Borsko license iden fied undercover mineraliza on at Target 1 that is indica ve of high
sulphida on style mineraliza on. The Year 3 explora on program will con nue with a focus on
geophysics and drilling.”
Borsko to focus on Geophysics and Drilling
At Borsko, as the license area for explora on is en rely undercover, our explora on methodology has
been to use a combina on of systema c explora on including grid soil sampling, structural
interpreta on, various geophysics surveys including but not limited to: CSAMT, IP, gravity, and magne cs
to iden fy an ini al 6 targets on the license area.
Due to the general depth of the main contact zone at Target 1, an IP survey commenced in April 2018
designed to reach greater depth. A gravity survey is scheduled to commence by the end of April 2018 to
further define structures. These geophysics surveys are expected to be completed in May 2018. The
geophysical surveys will further refine the structural understanding that control the intersected system.
Our expecta on is to commence drilling in mid-2018 with a follow up drill program in the Borsko license.
Zeleznik to focus on Interpretation of Geochemistry and Geophysics for Target Development
At Zeleznik, geophysics is being used along with geochemistry, structural interpreta on, mapping and
spectral analysis of altera on to further develop targets. To date, the systema c explora on program at
Zeleznik has iden fied four main target areas: West Zone, East Zone, Central Zone and North Zone. The
Central Zone and North Zone have yet to be drill tested. The porphyry systems in the West Zone and
East Zone are being evaluated for an ini al resource.
To further assist with the explora on of the project as a whole, which now includes 55 sqkm (5,500
hectares), a ground magne c survey over the en re project began in October 2017 and was completed
in February 2018. The team is currently conduc ng a systema c soil sampling program which is expected
to be completed in May 2018. This magne c data along with the geochemical analysis from the soil
sampling program will be used to further define targets. Mundoro and JOGMEC will then use the
informa on to design a drill program to test one of the target areas.
Timok South Projects Continue to Receive Interest from Third Parties
Mundoro ended Q1-2018 with approximately C$4.7 million in treasury with the Timok North Projects
op oned to JOGMEC; and the Timok South Projects, which is the largest con guous explora on area in
the Timok district, available for joint venture. As such, Mundoro con nues discussions with third par es
for the Timok South Projects comprising of Sumrakovac, Osnic, Savinac and Bacevica as it is the
Company’s con nued view to establish partnerships that will generate greater explora on expenditures
for drilling targets than would otherwise be available to the projects. Although there are discussions, the
Company cannot provide assurance that a transac on will be concluded as a result of these discussions.
The Company will keep the market apprised of material developments.
Qualified Person
Technical informa on contained in this Press Release has been reviewed and approved by Mr. G.
Magaranov, P. Geo., Qualified Person as defined by Na onal Instrument 43-101.
On behalf of the Company,
Teo Dechev, Chief Executive Officer, President and Director
About Mundoro Capital Inc.
Mundoro is a Canadian mineral explora on and development public company focused on building value
for its shareholders through directly inves ng in mineral projects that have the ability to generate future
returns for shareholders. The Company currently holds a diverse por olio of projects in two European
countries as well as an investment in a producing gold mine in Bulgaria and a feasibility stage gold
project in China. The Company holds eight 100% owned projects in Serbia, the four Timok North Projects
are in op on to JOGMEC, and the four Timok South Projects are being advanced by Mundoro.
Mundoro’s common shares trade on the TSX Venture Exchange under the symbol "MUN".
For further information please contact:
Teo Dechev, CEO, President and Director of Mundoro Capital Inc. at +1-604-669-8055
Caution Concerning Forward-Looking Statements
This News Release contains forward-looking informa on and statements (“forward-looking statements”)
under applicable securi es laws. All statements, other than statements of historical fact, included or
incorporated by reference in this News Release are forward-looking statements, including, without
limita on, the comple on of the proposed explora on work on the Timok North Projects and results of
that explora on work, the prospect of one or more joint ventures on the Timok South Projects and other
statements regarding ac vi es, events or developments that the Company expects or an cipates may
occur in the future. These forward-looking statements can be iden fied by the use of forward-looking
words such as "will", "expect", "intend", "plan", "es mate", "an cipate", "believe", “promising”,
“encouraging” or "con nue" or similar words or the nega ve thereof. The material assump ons that
were applied in making the forward looking statements in this News Release include expecta ons as to
the Company's future strategy and business plan and execu on of the Company's exis ng plans. There
can be no assurance that the plans, inten ons or expecta ons upon which these forward-looking
statements are based will occur. We cau on readers of this News Release not to place undue reliance on
forward looking statements contained in this News Release, which are not a guarantee of performance
and are subject to a number of uncertain es and other factors that could cause actual results to differ
materially from those expressed or implied by such forward-looking statements. These factors include
general economic and market condi ons, changes in law, regulatory processes, the status of Mundoro's
assets and financial condi on, ac ons of compe tors and the ability to implement business strategies
and pursue business opportuni es. The forward-looking statements contained in this News Release are
expressly qualified in their en rety by this cau onary statement. The forward-looking statements
included in this News Release are made as of the date of this News Release and Mundoro undertakes no
obliga on to publicly update such forward-looking statements to reflect new informa on, subsequent
events or otherwise, except as required by law. Shareholders are cau oned that all forward-looking
statements involve risks and uncertain es and for a more detailed discussion of such risks and other
factors that could cause actual results to differ materially from those expressed or implied by such
forward-looking statements, refer to the Company's filings with the Canadian securi es regulators
available on www.sedar.com .
Neither TSX Venture Exchange nor its Regula on Services Provider (as that term is defined in the policies
of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.