Mundoro Commences Drilling at Tilva Rosh GOLD Target IN Serbia and Provides Drilling Programs Update
MUNDORO COMMENCES DRILLING AT TILVA ROSH GOLD TARGET IN SERBIA AND PROVIDES DRILLING
PROGRAMS UPDATE
MAY 18, 2017, Vancouver, BC - Mundoro Capital Inc. (TSXV: MUN, www.mundoro.com) ("Mundoro"
or the "Company") is pleased to announce the start of the drilling program at the Tilva Rosh gold target
on the Company's 100% owned Savinac license (“ Savinac”). Savinac is one of the four exploration
licenses located in the southern portion of the Timok Magmatic Complex in Serbia that are 100%
controlled by Mundoro (“Timok South Projects” see Figure 1: Savinac License Location Map).
Teo Dechev, CEO and President o f Mundoro commented, “The prior drilling results at Tilva Rosh
successfully followed the surface trench results of high grade gold -silver mineralisation down dip along
the structure. The current program aims at defining the extent of near surface mineral isation along a
400 meters strike length and up to 100 meters depth. To date the mineralisation is open to the north,
south and at depth. Mundoro is focused on drill testing select target areas in the Timok South Projects
in parallel to furthering the JO GMEC funded Timok North Projects programs. We believe this parallel
strategy of testing and advancing assets, through either partnerships or our own treasury, provides
continuous opportunities to shareholders for creating value.”
TILVA ROSH GOLD TARGET
The current drill program at the Tilva Rosh gold target is designed to follow up on two key gold bearing
features: (i) a mineralised gold bearing hydrothermal breccia structure containing significant gold grades
and (ii) quartz veins that also host gold mi neralisation which have been identified with prior trenching
and drilling.
The 2017 drill program is budgeted for 1,500 meters of shallow drilling in 14 holes as shown in Figure 2:
Tilva Rosh Drill Plan Map to test 400 meters along strike and up to 100 meters down dip extension.
Previous Work at Tilva Rosh
Mundoro conducted geochemical, mapping, trenching, and ground magnetic surveys over the S avinac
license as well as compiling historic data, targeting epithermal and porphyry Cu -Au systems. This work
outlined the Savinac mineralised belt (9 km by 2 km) which includes the Tilva Rosh epithermal system
expressed on the surface with a large area of advanced argillic alteration covering 4 km by 1 km. Tilva
Rosh was explored previously in the late 1970’s and early 2000’s but significant gold mineralisation and
porphyry Cu-Au potential was identified by Mundoro’s exploration in Q4-2013.
As part of the 2014 program, six inclined diamond drill holes totaling 917.8 m were drilled at the
southern portion of Tilva Rosh system to test the down dip extent of the high -grade gold mineralisation,
which was previously confirmed by trenching results of 12 m @ 33.03 g/t AuEq (30.39 g/t Au, 171.27 g/t
Ag). Collar locations for the previously drilled holes are also shown in Figure 2: Tilva Rosh Drill Plan
Map. The previous Tilva Rosh drilling program demonstrated continuation of surface mineralisation at
dow-dip for a north-west striking hydrothermal breccia structure which hosts the high grade gold.
Copper mineralisation was intersected at depth in four o f the six drill holes drilling in 2014 as shown in
Table 1 below and appears to be related to supergene enrichment. The Company believes copper was
not present at surface due to the highly acidic nature of the lithocap in the area caused by the high
pyrite content in the system. The eastern most drill holes, SAV02 and SAV05, intersected the highest
lead-zinc contents (up to 2.2% Zn and 0.6% Pb) suggesting lateral zoning indicative of a porphyry style
hydrothermal system.
Table 1: Summary of significant results from the 2014 Tilva Rosh drill program
Drill Hole
ID
From
(m)
To
(m)
Interval
(m)
Au
(g/t)
Cu
(%)
Ag
(g/t)
AuEq
(g/t)
CuEq
(%)
SAV_01
Including
Including
11 18 7 7.90 _ 46.74 8.68 _
13 15 2 24.98 _ 128.05 26.95 _
13 14 1 42.90 _ 199 46.22 _
126 133 7 0.35 _ 2.76 0.40
SAV_02 30 40 10 0.34 _ 2.16 0.38 _
67.7 71.8 4.1 0.62 _ 2.36 0.66 _
95.6 100.0 4.4 0.54 _ 6.38 0.65 _
SAV_03
Including
71.0 76.0 5.0 2.54 0.59 15.54 3.73 2.36
74.0 74.7 0.7 10.35 1.47 50.10 13.52 8.54
SAV_04
Including
42.2 51.3 9.1 1.24 0.33 9.00 1.91 1.21
43.3 47.3 3.0 1.45 0.58 14.60 2.61 1.65
SAV_05
Including
Including
29 50.2 21.2 0.25 _ 1.78 0.28 _
30.4 36.0 5.6 0.43 _ 3.30 0.49 _
46.2 50.2 4.0 0.35 0.14 3.88 0.63 0.40
SAV_06 38.5 42.9 4.4 0.59 0.21 14.95 1.17 0.74
● Gold Equivalent (“AuEq.”) is calculated using the formula AuEq = (g/t/Au) + (g/t/Ag) + ($/ozAu)/65 + [(%Cu) x
(22.0462) x ($/lbCu)] ÷ [(1/31.1035) x ($/ozAu)].
● Copper equivalent (CuEq%) is calculated using the formula CuEq = (%Cu) + [(g/t/AuEq) x (1/31.1035) x
($/ozAu)] ÷ [(22.0462) x ($/lbCu)].
● Metal prices used are: gold price of US$1300/oz, copper price of US$3/lb, and silver price US$20/oz.
● All thicknesses from intersections fro m drill holes are down -hole drilled thicknesses or outcrop sample length
thickness. True widths can not be determined from the information available.
Future Targets at Tilva Rosh
The initial drill results from Tilva Rosh are encouraging and are interpret ed to be proximal to a Cu -Au
porphyry system related to a large area of advanced argillic lithocaps to the north (approximately 500
meters), highlighted with a molybdenum anomaly and followed outwards to zones of lead -zinc. These
are geochemical signature s of porphyry deposit footprints and where the Company believes there is
good potential for further porphyry drill targets.
BORSKO DRILL PROGRAM UPDATE
The drill program at the Borsko license in Serbia, which is being sole funded by JOGMEC as part of t he
JOGMEC option announced in August 2016 (“ Timok North Projects ”), has completed to date a total of
3,123 meters of diamond drilling in three holes: BJ -06, BJ-07, BJ-08. Due to the extended drill campaign
at Borsko, which began in February 2017 and was e xtended twice, the Company now expects the assay
results from this drill program to be announced in June.
ANGEL DRILL PROGRAM UPDATE
The commencement of the drill program at the Angel Vyvoda (“Angel”) gold target in the Zvezda license
in southeastern Bulgaria has been moved back due to mechanical problems with the drilling equipment.
The Company expects the drilling program to now commence around the end of May with assay results
from the Angel drilling program expected in August.
The Angel drill p rogram will test the large gold -in-soil geochemical anomaly that is also associated with
the Au-Ag-Sb-As-Mo suit of elements (which indicate an epithermal environment that has the potential
to host a mineralized system) seen in the geochemical survey that cover an area of a 2.7 km x 1.5 km
and delineating at least three sets of E -W to NW -SE structures. For further information on the Angel
drill program, please refer to our press release on September 16, 2014.
On behalf of the Company,
Teo Dechev, Chief Executive Officer, President and Director
For further information please contact:
Teo Dechev, CEO, President and Director of Mundoro Capital Inc. at +1-604-669-8055
Sampling and Analysis
All drill core samples are processed and assayed using 50 -gram fire assay with atomic absorption finish
and ME-MS61 by ALS Serbia and Romania. Quality Assurance and quality control procedures include the
systematic insertion of standards and duplicates into the sample streams. Field duplicate samples are
taken every 25 samples and standards and blanks are inserted after every 20th sample. All data
collected in the field and assay results from the laboratories are rou tinely verified and entered in an
Access database.
Qualified Person
Technical information contained in this Press Release has been reviewed and approved by Mr. G.
Magaranov, P. Geo., Qualified Person as defined by National Instrument 43-101.
About Mundoro Capital Inc.
Mundoro is a Canadian mineral exploration and development public company focused on building value
for its shareholders through directly investing in mineral projects that have the ability to generate future
returns for shareholders. The Company currently holds a diverse portfolio of projects in two European
countries as well as an investment in a producing gold mine in Bulgaria and a feasibility stage gold
project in China. The Company holds eight 100% owned projects in Serbia, the four Timok North Projects
are in option to JOGMEC, and the four Timok South Projects are being advanced by
Mundoro. Mundoro’s common shares trade on the TSX Venture Exchange under the symbol "MUN".
Caution Concerning Forward-Looking Statements
This News Releas e contains forward -looking statements. Forward -looking statements can be identified
by the use of forward -looking words such as "will", "expect", "intend", "plan", "estimate", "anticipate",
"believe" or "continue" or similar words or the negative thereof, and include the following: completion
of the earn -in expenditures and options by JOGMEC; and completion of a definitive joint venture
agreement by the parties. The material assumptions that were applied in making the forward looking
statements in this News Release include expectations as to the mineral potential of the Timok North
Properties, the Company's future strategy and business plan and execution of the Company's existing
plans. We caution readers of this News Release not to place undue reliance on f orward looking
statements contained in this News Release, as there can be no assurance that they will occur and they
are subject to a number of uncertainties and other factors that could cause actual results to differ
materially from those expressed or imp lied by such forward -looking statements. These factors include
general economic and market conditions, exploration results, commodity prices, changes in law,
regulatory processes, the status of Mundoro's assets and financial condition, actions of competito rs and
the ability to implement business strategies and pursue business opportunities. The forward -looking
statements contained in this News Release are expressly qualified in their entirety by this cautionary
statement. The forward -looking statements incl uded in this News Release are made as of the date of
this News Release and the Board undertakes no obligation to publicly update such forward -looking
statements, except as required by law. Shareholders are cautioned that all forward -looking statements
involve risks and uncertainties and for a more detailed discussion of such risks and other factors that
could cause actual results to differ materially from those expressed or implied by such forward -looking
statements, refer to the Company's filings with the Canadian securities regulators available on
www.sedar.com.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies
of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.